| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-Finance | L1 | Accepted-Finance L1 Lowest Price Bidder | |
| 2 | L2₹27.3 L+₹74,475.20 (2.80%)Rejected-Finance | L2 | Rejected-Finance Rates are on Higher Side Bidder | |
| 3 | L3₹28.1 L+₹1.5 L (5.46%)Rejected-Finance | L3 | Rejected-Finance Rates are on Higher Side Bidder | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2,596
EMD Value
₹22,000
Closing Date
27 Jun 2020, 6:00 pmClosed
SUPERINTENDING ENGINEER
220 kv sub STATION GIDAHI BASTI
Annual Operation and Maintenance of 132 and 220 KV Transmission Lines, Under ETD II Basti.
2020_UPTCL_485711_1
08
Open Tender
Electrical Works
Lump-sum
90 days
220 KV Sub station Gidahi Basti
AS PER TENDER
2 documents required · 2 mandatory
₹2,596
UPSEB ELECTRICITY TRANSMISSION DIVN
₹22,000
10 Jul 2020
22 Jun 2020
29 Jun 2020
22 Jun 2020
27 Jun 2020
22 Jun 2020
Amount
Quarterly tower to tower ground patrolling and tower top patrolling as per sheduled of 220 KV transmission line with the help of patrolling team consisting of skilled labours and 01 no. supervisor equipped with binoacular and other T&P and detection of defects like missing tower parts, hot Points, Punctured insulator disc, dislocation of vibration dampers, damage conductor, Earth wire, checking of foundation and position of tree in the corridor of 35 mtrs. and tree clearance of 4 to 6 mtrs of the line, lopping, chopping and cutting of tree branches and clearing of word nest, kites their string and all other related things from the tower. submission of seperate patrolling report of each lines on prescribed computerized proforma in 3 sets after each patrolling duly signed by contractor within 07 days after completion of patrolling
220KV Gorakhpur(PGCIL)-Basti LILO at 220KV Bansi (47.38Kms)
Patroling during tripping and breakdown of lines.
Emergency patrolling of line during tripping and defects as per the exact fault location and type of fault or as per direction of engineer in charge
Replacement of damaged/punctured insulators string/disc and fixing new string/disc at fault/breakdown location including carriage of material from store to work site of the above line. All the manpower and T&P shall we provide by contractor
Suspension strings
Tension strings
Replacement of damaged jumpers at tension towers including carriage of material and T&P will be arranged by contractor.
Making & fixing of tower members including cartage of Steel angles from S/S store, punching holes and febrication for proper placement tightening of nut & bolts punching & fixing a different tower location of above transmission line
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc. and its transportation up to the site.
Repairing of foundation, cooping wherever required including cost of material, labour, T&P etc and it's transportation up to site.
Tightening/fixing of missing/displaced vibration dampers/arcing horn.
Attending breakdown due to damaged earthwire/tightening of loose earthwire span as per site requirement.
Clearing of accumulated soil around tower legs above chimney, painting of tower legs of 300 mm above chimney of each leg by black rubber seal paint of standard quality to maintain the strength of leg by is restricting the rusting of legs due to accumulation of soil and water lodging during rainy season.
Attending breakdown due to damage/broken of ACSR Zebra conductor as per site requirement.
Repairing of damage ACSR Zebra conductor by using of repair sleeves.
Tighteing of jumpers of angle towers with the help skilled fitter and suitable T&P after proper shutdown and earthing as per requirement.
Patrolling and annual Maintenance of 132 KV line
Quarterly tower to tower ground and tower top patrolling whenever required of 132 KV transmission line with the help of patrolling team consisting of skilled labour and 01 no. supervisor equipped with binocular and other T&P and detection of defects like missing tower parts hot point, punctured insulatot disc dislocation of vibration dampers damaged conductor earthwire, checking of foundation and position of tree in the corridor of 27 mtr. and tree clearance of 4.0 metre of the line lopping, chopping and cutting of tree branches and clearing of word nest, kites their string and all other related things from the tower. Submission of separate patrolling report for each line on prescribed computerised proforma in 3 Sets after each patrolling duly signed by contractor within 07 days after completion of patrolling.
132KV Basti-Bansi Line (48.20Kms), 132KVBansi-Mehdawal Line (31.20Kms), 132KV Bansi-Naugarh Line (25.73Kms), 132KV Basti-dumariaganj Line (53.80Kms) , 132KV Bansi-Dumariaganj Line (37.80Kms), 132KV Bansi-D/ganj LILO at Itwa (14.8Kms)
Patrolling during tripping and breakdown of lines.
Emergency patrolling of line during tripping to detect the exact fault location & type of fault or as per the direction of engineer in charge.
Replacement of damaged/punctured insulators string /disc and fixing new string/disc at fault/breakdown location including carriage of material from store to worksite of the above line. All the manpower and T&P shall be provided by the contractor.
Suspension strings
Tension strings
Replacement of damaged jumpers at tension towers including carriage of material and T&P will be arranged by contractor.
Making & fixing of tower members including cartage of Steel angles from S/S store, punching holes,febrications for proper placement tightening of nut & bolts punching & chamfering a different tower location of abover transmission line
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc. and its transportation up to the site.
Repairing of foundation, cooping wherever required including cost of material, labour, T&P etc and it's transportation up to site.
Tightening/fixing of missing/displaced vibration dampers/arcing horn.
Attending breakdown due to damage of earth wire including replacement/tightening of suspension clamp/copper bond/bull dog clamp as per site requirement B38
Clearing of accumulated soil around tower legs above chimney, painting of tower legs of 300 mm above chimney of each leg by black rubber seal paint of standard quality to maintain the strength of leg by is restricting the rusting of legs due to accumulation of soil and water lodging during rainy season.
Attending breakdown due to damage/broken of ACSR Panther conductor as per site requirement.
Repairing of damage ACSR Panther conductor by using of repair sleeves.
Tighteing of 132KV jumpers of angle towers with the help skilled fitter and suitable T&P after proper shutdown and earthing as per requirement.
J P S EMPORIUM
V.P.Associates
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .