Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹15.5 L+₹5,199 (0.34%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S DANIEL L2 | CHINCITY STEELS L1 |
|---|---|---|---|---|---|
| 1.00Part 01 : PROVIDING 5" HDPE PIPELINE WORK FROM MANNAVANUR PARAPPALARU CHECK DAM TO 1st KM @ MANNAVANUR H/O MANNAVANUR. | |||||
| 2.00 | Cost and Supply of 140mm HDPE Pipe | 1,510 | cu.m | 606 ₹9,15,060 | 605 ₹9,13,550 Lowest |
| 3.00 | Cost and Supply of Air Pipe with all labour Chargers | 1 | cu.m | 3,500 ₹3,500 Lowest | 3,500 ₹3,500 Lowest |
| 4.00 | Jointing HDPE pipes and specials by buttfusion welding/ electro fusion welding joints using fusion equipment as per ISO 21307 - 2011 and as per IS 7634 (part-2) : 2012 including cost of hire chargers for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board officers. ( HDPE 140mm ) Pg No 184 | 252 | cu.m | 281 ₹70,812 | 280.5 ₹70,686 Lowest |
| 5.00 | Earth work excavation and filling the trenches with laying and jointing the HDPE Pipeline with all cost and conveyance Pg No :- 192 | 1,260 | cu.m | 221 ₹2,78,460 | 220 ₹2,77,200 Lowest |
| 6.00 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and etc., Complete Pg No :- 171 | 1,510 | cu.m | 27 ₹40,770 | 26 ₹39,260 Lowest |
| 7.00 | Toward the Name board Chargers | 1 | cu.m | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,35,728 ₹2,35,728 | 2,34,935 ₹2,34,935 Lowest |
Tender Value
₹15.6 L
EMD Value
₹16,000
Closing Date
25 Oct 2025, 3:00 pmClosed
Block Development Officer Panchayat UnionKodaikanl
Block Development Officer Panchayat UnionKodaikanl
Mannavanur Pipeline
2025_RDTN_616352_1
Mannavanur Pipeline PUGF
Open Tender
Civil Works - Water Works
Works
Block Development Officer Panchayat UnionKodaikanl
Mannavanur Pipeline
4 documents required · 4 mandatory
₹0
₹16,000
Yes
11 Nov 2025
23 Oct 2025
25 Oct 2025
23 Oct 2025
25 Oct 2025
23 Oct 2025
Amount
Part 01 : PROVIDING 5" HDPE PIPELINE WORK FROM MANNAVANUR PARAPPALARU CHECK DAM TO 1st KM @ MANNAVANUR H/O MANNAVANUR.
Cost and Supply of 140mm HDPE Pipe
Cost and Supply of Air Pipe with all labour Chargers
Jointing HDPE pipes and specials by buttfusion welding/ electro fusion welding joints using fusion equipment as per ISO 21307 - 2011 and as per IS 7634 (part-2) : 2012 including cost of hire chargers for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board officers. ( HDPE 140mm ) Pg No 184
Earth work excavation and filling the trenches with laying and jointing the HDPE Pipeline with all cost and conveyance Pg No :- 192
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and etc., Complete Pg No :- 171
Toward the Name board Chargers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S DANIEL (BID ID -1494886)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.78 MB
Tendernotice_3.pdf
PDF • 0.92 MB
BOQ_736503.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .