Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC R O VILAGE KHOBLA P O NAND TEHSIL RAMSHEHAR DISTT SOLAN HP | ₹9.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹9.7 L+₹50,422.86 (5.47%)Rejected-Finance | ₹9.7 L+₹50,422.86 (5.47%) | L2 | Rejected-Finance second lowest bidder |
| 3 | L3₹9.9 L+₹65,857.60 (7.14%)Rejected-Finance R O VIJ HOUSE CHOTTA SHIMLA TEHSIL SHIMLA DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | ₹9.9 L+₹65,857.60 (7.14%) | L3 | Rejected-Finance Third lowest bidder |
| 4 | L4₹9.9 L+₹69,370.50 (7.52%)Rejected-Finance | ₹9.9 L+₹69,370.50 (7.52%) | L4 | Rejected-Finance Fourth lowest bidder |
| 5 | L5₹10.4 L+₹1.2 L (13.0%)Rejected-Finance | ₹10.4 L+₹1.2 L (13.0%) | L5 | Rejected-Finance Fifth lowest bidder |
Tender Value
₹12.1 L
EMD Value
₹24,200
Closing Date
18 Apr 2022, 5:00 pmClosed
Executive Engineer
HPSIDC Shimla
Providing and laying interlocking paver blocks.
2022_SIDC_59204_1
Job No. 5
Open Tender
Civil Works
Item Rate
90 days
Nalagarh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,400
₹24,200
3 Aug 2022
8 Apr 2022
19 Apr 2022
8 Apr 2022
18 Apr 2022
8 Apr 2022
Amount
Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to10 tonne capacity.
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.(a) With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.(a) With material conforming to Grade-II (size range 53 mm
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. layers, when required into plinths, sides of foundations etc. consolidating each deposited layers by rammeing and watering and then disposing of all surplus excavated earth as directed within all leads and lifts as pewr direction of Engineer-in- Charge
Providing and laying cement concrete 1:1.5:3 (1cement : 1.5sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in all height as per HPPWD specification with updated BIS norms. (a) Suspended floor, roofs, landing and shelves and their supports balconies beams, girders, bressumers and cantilever .
Providing mild steel/tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor two level. Tool and plant through all modes of transportion within all leads and lifts as per direction of Engineer-in-Charge.
Providing & laying of interlocking cement concrete paver block pavement 80MM thickness (M40 Mix) as per drawings and technical specification clause 1504 of MORD & SP-63-2018 i/c bedding sand 30mm thick and to be manufectured in an appropriate plant with high frequency hydrulic press machine with controlled viberation and paving blocks with proper compaction . The contractor shall get prior approval of the paver blocks test samples of approved makes from the Engineer-in-incharge with in 15 dayes prior to the commencement of laying of block at site including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD sepifications and as per driection of the Engineer-in-charge.
HARKIT SINGH
Pardeep Vij
SHUBHAM KANWAR
Harsh Mehta
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .