Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE-ES
Superintending Engineer Electrical System NCTPS I Chennai 600 120
NCTPS I ES Circle EM II Dn SD II Overhauling of 1 No 6 6 KV 300 KW 1480 RPM Kirloskar make HT Recovery Water Pump Motor 3 Sl No 3940504 1 at RWPH
2020_EB_175274_1
CE NCTPS-I SE ES WC No 43 2020 2021
Open Tender
Power/Energy Projects/Products
Works
20 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Yes
5 Sept 2020
10 Aug 2020
25 Aug 2020
10 Aug 2020
24 Aug 2020
10 Aug 2020
90 days
Amount
Disconnection of power cable, De-coupling the motor from pump and checking alignment.
Removal of foundation bolts, lifting the motor to a convenient location.
Dismantling of motor pulley, cooler, end covers and threading out the rotor.
Checking and cleaning of cooler tubes.
Overhaul of stator: Labour charges for inspection and cleaning of stator and winding of stator, fastening of the winding to the end ring and also the inter coil spacers and packing in the overhang portion of the winding, tightening of the wedges, spraying one coat of Dr.Beck’s protective enamel and drying out, Stator preheating checking the IR value and DC Resistance.
Overhaul of rotor: Labour charges for inspection and cleaning of rotor, checking the position of stampings, cleaning of the corroded parts, Inspection of winding, cleaning of overheated end windings, cleaning of overheated burnt places and applying two coats of Dr.Becks protective enamel and drying out.
Releasing the bearing, cleaning, checking, reassembling / replacing the bearing on both ends lubrication etc. (Bearings supplied by TANGEDCO if necessary).
Assembling of motor after threading in the rotor, fixing end covers, providing rubber gasket and fixing of cooler unit, checking of IR value, DC resistance and Tan delta.
Lifting of motor, placing at motor bed and tightening of foundation bolts, bed bolts etc.
Consumables and T & P
Transport charges
SRI RAVI BALAJI ERECTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .