CHIEF ENGINEER
LDA Gomti Nagar Lucknow
Sultanpur Road per Lucknow me Aagman hetu Parvesh dwar ka nirman/ vikash karya (Ganga Dwar)
2026_LDAUP_1163414_1
41/E-Nivida/CE/2026-27_04
Open Tender
Civil Works
180 days
Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secratary LDA
₹4.9 L
24 Jun 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soilDSR 2023- 2.6.1 | 1 | Cum | 1 | ₹1 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).DSR 2023- 4.1.8 | 1 | Cum | 1 | ₹1 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 2023- 5.1.3 | - | Cum | 1 | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources).DSR 2023- 5.3 | 1 | Cum | 1 | ₹1 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1DSR 2023- 5.9.1 | 0.6 | Sqm | 1 | ₹0.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :, Suspended floors, roofs, landings, balconies and access platformDSR 2023- 5.9.3 | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantileversDSR 2023- 5.9.5 | - | Sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and StrutsDSR 2023- 5.9.6 | - | Sqm | 1 | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- @7150.00- STEEL RENFORCEMENT @7150.00 | 0.4 | QTL | - | - |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:6 (1 cement : 6 coarse sand)DSR 2023- 6.1.2 | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_2181050.xls
BOQ • 0.31 MB
T_2.pdf
Tender Documents • 4.27 MB
Download all tender documents and submit your bid