Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical KAMLA VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical CHAMAN BIHAR COLONY LEBRA ROAD HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹59.6 L
EMD Value
₹5.0 L
Closing Date
15 Dec 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Aligarh Circle PWD Aligarh
SE office Aligarh
New Construction of Gangcholi to Tipras Road
2025_CEALG_1096088_1
6327 /Cashier(PDH)-AC/2025 Dated 11-11-2025
Open Tender
Civil Works
Percentage
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.0 L
Yes
SE office Aligarh
18 Dec 2025
5 Dec 2025
15 Dec 2025
5 Dec 2025
15 Dec 2025
5 Dec 2025
8 Dec 2025
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Excluding Cost of GST)
Cement Treated Subbase with 2% Cement Providing, Laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. (Excluding Cost of GST )
Cement Treated base with 4% Cement Providing, Laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. (Excluding Cost of GST )
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Machanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work. As per MORD specification No. 502 (Including Cost of Bitumen or Emulsion But Excluding Cost of GST )
Providing & applying Tack Coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.35Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Machanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work, as per MORD specification No. 503 (Including Cost of Bitumen or Emulsion But Excluding Cost of GST )
Providing, laying & rolling of open graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.60mm aggregates including mixing in a suitalbe plant, laying & rolling iwth a three wheeled 80-100KN static roller capacity, finished to required level & grades bitumen @ 14.6Kg./10Sqm. area for premixing including all material, Labour and T&P etc required for proper completion of the work, as per MORD Specification No. 508 (Including Cost of Bitumen or Emulsion But Excluding Cost of GST )
Providing and laying seal coat type "C" scaling the voids in a bituminous surfsce PC. surface laid to specified levels grade and cross fall using with 67 mm nominal size grit of Approved quarry @0.09 cum per 10sqm with Bitumen @ 6.50 kg/10sqm including heating of Bitumen to the required temperature and including all material, Labour & T&P ete as per Clouse 510 of MORD Specification. (Including Cost of Bitumen or Emulsion But Excluding Cost of GST )
Construction of Subgrade and earthen shoulders of embankment with approved material obtained from borrow pits with a lift upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of as per Technical specification clause 303.1 (Excluding Cost of GST)
Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (Excluding Cost of GST)
Plain cement concrete 1:3:6 nominal mix in foundation Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203days. (Excluding Cost of GST)
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. As per SOR Ch. 1(2.1.1) (Excluding Cost of GST)
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (Excluding Cost of GST)
Supply, laying and fixing of NP-4 class hume pipes in proper position in culvert includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 350mm) (Excluding Cost of GST)
Supply, laying and fixing of NP-4 class hume pipes in proper position in culvert includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 600mm) (Excluding Cost of GST)
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 (Excluding Cost of GST)
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 7.50%) Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.75%
3rd Year @ 1.50%
4th Year @ 2.25%
5th Year @ 3.00%
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Excluding Cost of GST)
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i)For Grading I Material (Excluding Cost of GST)
CEMENT CONCRETE PAVEMENT (CC ROAD) Construction of un-reinforcement plain cement concrete pavement thickness as per design, over a parepared sab base with 43 grade coment or any other type as per clause 1501 1.2M 30(grade) coarse and fine ggregate conforming to IS 383 maximum size of coarse aggregate not exceeding 25mm mised in a concrete mixer of not less then 0.2 Cum capacity and appropriate weight batcher Josing approved mix design, laid in approved fixed side from work (Steel channel laying and faxing of 125 micron thick plastic sheet, wedges steel plates including levelling the form unk as per drawing) spreading the concrete with shovels, rakes compacted using needle arved and plate vibrators and finished in continuous operation including provision of traction and expansation construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (Where pecified) and water finishing to lines and grade as per drawing and technical specification approved Quarry grit Clause 1501. (Excluding Cost of GST)
Construction of Subgrade and earthen shoulders of embankment with approved material obtained from borrow pits with a lift upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of as per Technical specification clause 303.1 (Excluding Cost of GST)
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 2.50%) Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.25%
3rd Year @ 0.50%
4th Year @ 0.75%
5th Year @ 1.00%
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.32 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_2017625.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .