| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC Lowestrate |
| 2 | Rejected-Technical | - | - | Rejected-Technical Highest rate Quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Highest rate Quoted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Highest rate Quoted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Highest rate Quoted |
| Sl No | Description | Qty | Unit | A SORIMUTHU L4 | RAJA SUBBULAKSHMI L5 | SHUNMUGASUNDAR RAJA L3 | APS ENTERPRISES L6 | C ESAKKI PANDI L2 | ESAKKIDURAI L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work:Renovation of HWC at Ramanujampudur village and panchayat in Karungulam panchayat union -PUGF -2025-26 - Package No-3 | |||||||||
| 2.00 | Chipping and removing the existing celing plastering in cm1:3 | 58.64 | m2 | 7.25 ₹425.02 | 7 ₹410.48 | 6.52 ₹382.52 | 8 ₹469.12 | 6.39 ₹374.50 | 6.25 ₹366.50 |
| 3.00 | Chipping and removing the existing wall plastering in cm1:5 | 96.48 | m2 | 7.25 ₹699.29 | 7 ₹675.36 | 6.52 ₹629.36 | 8 ₹771.84 | 6.39 ₹616.16 | 6.25 ₹603 |
| 4.00 | Removing the roof top exsiting the pressed tiles in cm 1:3 mix including | 68.96 | m2 | 21.85 ₹1,506.64 | 23 ₹1,586.08 | 19.66 ₹1,355.97 | 23 ₹1,586.08 | 19.25 ₹1,327.54 | 18.95 ₹1,306.79 |
| 5.00 | Removing and shiffiting the exsting weathering course | 4.48 | m2 | 39.36 ₹176.33 | 41 ₹183.68 | 35.42 ₹158.70 | 40 ₹179.20 | 34.68 ₹155.37 | 34.1 ₹152.77 |
| 6.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 58.64 | m2 | 247.08 ₹14,488.77 | 255 ₹14,953.20 | 222.37 ₹13,040.02 | 290 ₹17,005.60 | 217.71 ₹12,766.42 | 214.6 ₹12,584.14 |
| 7.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 96.48 | m2 | 227.63 ₹21,961.94 | 235 ₹22,672.80 | 204.87 ₹19,765.74 | 260 ₹25,084.80 | 200.57 ₹19,351.21 | 197.75 ₹19,078.92 |
| 8.00 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers | 4.48 | m2 | 3,257.22 ₹14,592.33 | 3,367 ₹15,084.16 | 2,931.49 ₹13,133.09 | 3,702 ₹16,584.96 | 2,870.01 ₹12,857.66 | 2,829.7 ₹12,677.06 |
| 9.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 68.96 | m2 | 936.2 ₹64,560.35 | 968 ₹66,753.28 | 842.58 ₹58,104.32 | 900 ₹62,064 | 824.91 ₹56,885.74 | 813 ₹56,064.48 |
| 10.00 | Supplying and fabricating and fixing MS grill works to windows and grill gate using necessary MS flst for inner and outer members should be fixed to window frames | 200 | m2 | 90.57 ₹18,113.60 | 94 ₹18,800 | 81.51 ₹16,302.24 | 90 ₹18,000 | 79.8 ₹15,960.34 | 78 ₹15,600 |
Tender Value
₹7.8 L
EMD Value
₹7,750
Closing Date
15 Nov 2025, 3:00 pmClosed
BDO(BP) Karungulam
Karungulam panchayat union office
Renovation of HWC at Ramanujampudur village and panchayat in Karungulam panchayatunion-PUGF-2025-26-Package No-3
2025_RDTN_621513_2
BDO(BP)KGLM Lr.No.A3/1958/2025 . Date.05.11.2025-1
Open Tender
Civil Works
Karungulam union office Seydunganallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,750
10 Mar 2026
8 Nov 2025
15 Nov 2025
8 Nov 2025
15 Nov 2025
8 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_743159.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
technicalbidforramanujambudur.pdf
Additional Documents • 0.43 MB
BOQ_743159.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid