Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹88.8 LAdmitted-Finance | -15.15% | ₹88.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹15.3 L (17.3%)Admitted-Finance | -0.50% | ₹1.0 Cr+₹15.3 L (17.3%) | L2 | Admitted-Finance |
| 3 | L2₹1.0 Cr+₹15.3 L (17.3%)Admitted-Finance | -0.50% | ₹1.0 Cr+₹15.3 L (17.3%) | L2 | Admitted-Finance |
| 4 | L2₹1.0 Cr+₹15.3 L (17.3%)Admitted-Finance | -0.50% | ₹1.0 Cr+₹15.3 L (17.3%) | L2 | Admitted-Finance |
| 5 | L2₹1.0 Cr+₹15.3 L (17.3%)Admitted-Finance | -0.50% | ₹1.0 Cr+₹15.3 L (17.3%) | L2 | Admitted-Finance |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
14 Jul 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE, BARIPADA
Construction of Day Care PHC building at Badjambhila PHC under Bisoi Block
2026_CERWI_134587_1
NCB-415
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
SERW Division, Rairangpur
4 documents required · 4 mandatory
₹10,000
₹1.0 L
Yes
21 Aug 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
6 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in all kinds of soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by Engineer in charge. | 176.48 | cum | 304.95 | ₹53,817.58 |
| 2 | Filling foundation and plinth with sand well watered and rammed with cost carriage of all materials etc. | 309.57 | cum | 974.45 | ₹3,01,660.49 |
| 3 | Cement concrete 1:3:6 using 4cm size bhg. Metal with cost carriage of all materials and labour etc. | 62.58 | cum | 6,295.35 | ₹3,93,963 |
| 4 | Cement concrete (1:2:4) with 12mm size chips of approved quality etc.comp. | 1.37 | cum | 7,872.15 | ₹10,784.85 |
| 5 | R.C.C. work of M-20 using 20 mm and dowm graded cb. Chips with cost carriage of all materials etc. complete.
Column Base | 30.71 | cum | 6,723.25 | ₹2,06,471.01 |
| 6 | Grade Beam | 15.57 | cum | 6,723.25 | ₹1,04,681 |
| 7 | Column | 14.5 | cum | 15,986.1 | ₹2,31,798.45 |
| 8 | Lintel | 7.33 | cum | 14,386.55 | ₹1,05,453.41 |
| 9 | Chajja | 18.77 | sqm | 1,251.1 | ₹23,483.15 |
| 10 | Roof Beam | 17.3 | cum | 15,986.1 | ₹2,76,559.53 |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.00 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_599908.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .