| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-Finance | L1 | Accepted-Finance LOWEST | |
| 2 | L2₹27.4 L+₹2.7 L (10.9%)Rejected-Finance | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹28.0 L+₹3.2 L (13.0%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹29.2 L+₹4.4 L (18.0%)Rejected-Finance 2 EVEREST VIHAR PT T N MISHRA MARG NIRMAN NAGAR JAIPUR 302019 | JAIPUR | RAJASTHAN | 302019 | L4 | Rejected-Finance NOT LOWEST | |
| 5 | Rejected-Technical NO 28 KUMHARON KI BASTI DHOONDHA BARMER RAJASTHAN 344035 | BARMER | RAJASTHAN | 344035 | - | Rejected-Technical Category does not match |
| Sl No | Description | Qty | Unit | Devi Engineeing L2 | Rasam Engg Co. L4 | BANA CONSTRUCTION AND SUPPLEIRS COMPANY L1 | S.K. INFRASTRUCTURE L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in deep for foundation, taking up/down or laying of GI tubing/CI pipe etc or for shaft, wells, cesspits, manholes, pier holes etc not exceeding 10 sqm on plan and getting out in any type of soil complete all as specified and directed by Engineer-in-charge. | 300.82 | cum | 111 ₹33,391.57 Lowest | 150 ₹45,123.75 | 220 ₹66,181.5 | 250 ₹75,206.25 |
| 2.00 | Returning, filling in, including, spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified and directed by Engineer-in-charge. | 265.92 | cum | 61 ₹16,221.33 | 60 ₹15,955.41 | 90 ₹23,933.11 | 50 ₹13,296.17 Lowest |
| 3.00 | Removing excavated soil to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed by Engineer-in-charge. | 34.9 | cum | 61 ₹2,128.99 | 60 ₹2,094.09 | 190 ₹6,631.3 | 50 ₹1,745.08 Lowest |
| 4.00Taking up or down GI steel tubing including fittings with connection from trenches, walls, floors etc including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed complete all as specified and as directed for the following sizes : | |||||||
| 4.01 | GI pipe 100 mm bore | 150 | RM | 25 ₹3,750 Lowest | 25 ₹3,750 Lowest | 30 ₹4,500 | 70 ₹10,500 |
| 4.02 | GI pipe 80 mm bore | 180 | RM | 15 ₹2,700 Lowest | 25 ₹4,500 | 30 ₹5,400 | 60 ₹10,800 |
| 4.03 | GI pipe 50 mm bore | 330 | RM | 15 ₹4,950 Lowest | 20 ₹6,600 | 30 ₹9,900 | 50 ₹16,500 |
| 4.04 | GI pipe 40 mm bore | 330 | RM | 10 ₹3,300 Lowest | 20 ₹6,600 | 30 ₹9,900 | 40 ₹13,200 |
| 4.05 | GI pipe 25 mm bore | 350 | RM | 10 ₹3,500 Lowest | 10 ₹3,500 Lowest | 30 ₹10,500 | 30 ₹10,500 |
| 4.06 | GI pipe 20 mm bore | 320 | RM | 8 ₹2,560 Lowest | 10 ₹3,200 | 30 ₹9,600 | 25 ₹8,000 |
Tender Value
₹28 L
EMD Value
₹56,000
Closing Date
7 Sept 2026, 6:00 pmClosed
GE A BARMER
GE (A) BARMER JALIPA CANTT BARMER-344001 (RAJ)
REPAIR/ MAINT OF WATER SUPPLY DISTRIBUTION NETWORK SOLAR WATER SYSTEM AND ALLIED WORKS AT JALIPA MIL STN AND VARIOUS ASCON NODES UNDER GE (A) BARMER
2026_MES_783599_1
8930/E8
Open Tender
Civil Works
Item Rate
180 days
BARMER
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE (A) BARMER
₹56,000
Yes
7 Oct 2026
10 Aug 2026
9 Sept 2026
10 Aug 2026
7 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in deep for foundation, taking up/down or laying of GI tubing/CI pipe etc or for shaft, wells, cesspits, manholes, pier holes etc not exceeding 10 sqm on plan and getting out in any type of soil complete all as specified and directed by Engineer-in-charge. | 300.82 | cum | 31,00,000 | ₹93,25,57,500 |
| 2 | Returning, filling in, including, spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified and directed by Engineer-in-charge. | 265.92 | cum | 31,00,000 | ₹82,43,62,681.05 |
| 3 | Removing excavated soil to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed by Engineer-in-charge. | 34.9 | cum | 31,00,000 | ₹10,81,94,818.95 |
| 4Taking up or down GI steel tubing including fittings with connection from trenches, walls, floors etc including cleaning for re-fixing or remove to store yard/ credited to contractor complete all as specified and directed complete all as specified and as directed for the following sizes : | |||||
| 4.01 | GI pipe 100 mm bore | 150 | RM | 31,00,000 | ₹46,50,00,000 |
| 4.02 | GI pipe 80 mm bore | 180 | RM | 31,00,000 | ₹55,80,00,000 |
| 4.03 | GI pipe 50 mm bore | 330 | RM | 31,00,000 | ₹1,02,30,00,000 |
| 4.04 | GI pipe 40 mm bore | 330 | RM | 31,00,000 | ₹1,02,30,00,000 |
| 4.05 | GI pipe 25 mm bore | 350 | RM | 31,00,000 | ₹1,08,50,00,000 |
| 4.06 | GI pipe 20 mm bore | 320 | RM | 31,00,000 | ₹99,20,00,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_877968.xls
BOQ • 0.63 MB
TENDERDOC.pdf
Tender Documents • 2.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .