Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-Finance | ₹14.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹15.0 LAccepted-Finance | ₹15.0 L | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical 1 118 MARIYAMMAN KOVIL STREET KALPAGANUR POST ATTUR TK SALEM DISTRICT | MADURAI | TAMIL NADU | 625001 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | SSM CONSTRUCTION L1 | SS Constructions L2 |
|---|---|---|---|---|---|
| 1.001.)Strengthening the Road from pichampalayam Main Road pudupalayam 0/0-0/400 H/O Inambiroji | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 249 | Cum | 6.36 ₹1,583.64 | 6.36 ₹1,583.64 |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 62.25 | Cum | 341.07 ₹21,231.61 | 341.07 ₹21,231.61 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 196.1 | Cum | 2,701 ₹5.3 L | 2,900 ₹5.7 L |
| 5.00 | Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,568.75 | Cum | 85.16 ₹1.3 L | 85.16 ₹1.3 L |
| 6.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,568.75 | Cum | 19.27 ₹30,229.81 | 19.27 ₹30,229.81 |
| 7.00 | Providing and laying of hot applied Thermoplastic compound with reflectoristing glass beeds on bituminous surface | 83 | Cum | 890 ₹73,870 | 890 ₹73,870 |
| 8.00 | Providing and laying Bituminous Concrete to 100-120 TPH batch type HMP output of 75 tonne and 5.4cum of 5.6 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 39.21 | m2 | 11,360.8 ₹4.5 L | 11,360.8 ₹4.5 L |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,22,414 ₹2.2 L | 2,29,438 ₹2.3 L |
Tender Value
Refer Docs
EMD Value
₹14,750
Closing Date
7 Jan 2026, 3:00 pmClosed
BDO (BP)
BDO Office Veerapandi (BP)
Strengthening the Road from pichampalayam Main Road pudupalayam 0/0-0/400 H/O Inambiroji-General Fund -2025-2026
2025_RDTN_637506_2
Roc no 3579/2025/A2
Open Tender
Civil Works - Roads
120 days
BDO Office Veerapandi
As per tender Document
3 documents required · 3 mandatory
₹0
₹14,750
12 Mar 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
Amount
1.)Strengthening the Road from pichampalayam Main Road pudupalayam 0/0-0/400 H/O Inambiroji
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying of hot applied Thermoplastic compound with reflectoristing glass beeds on bituminous surface
Providing and laying Bituminous Concrete to 100-120 TPH batch type HMP output of 75 tonne and 5.4cum of 5.6 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SS Constructions (BID ID -1556056)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_763016.xls
BOQ • 0.24 MB
02.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid