| 1 | L1₹19.6 LAccepted-AOC NOT AVAILABLE | NEW DELHI | DELHI | 110001 | ₹19.6 L Quoted ₹21.1 L | L1 | Accepted-AOC Due to lower Rates |
| 2 | L2₹22.8 L+₹1.7 L (7.90%)Rejected-Finance 344 GEHRI BUTTER GEHRI BUTTER GEHRI BUTTER BATHINDA PUNJAB 151401 | BATHINDA | PUNJAB | 151401 | ₹22.8 L+₹1.7 L (7.90%) | L2 | Rejected-Finance Higher Rates |
| Sl No | Description | Qty | Unit | Markanda Electrical Works L1 | MANJOT ENTERPRISES COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipelines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade,cutting joint holes,refilling consolidation,including the cost of diversion for traffic,crossing over trenches for access to the houses,watching,fencing etc. and removal of surplus soil outside/inside the town involving lead upto 15 meter complete in all respect. | 4,075.9 | cum | 100 ₹4,07,590 Lowest | 110 ₹4,48,349 |
| 2.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 141.17 | cum | 190 ₹26,822.3 Lowest | 200 ₹28,234 |
| 3.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 104.01 | cum | 7,000 ₹7,28,070 Lowest | 7,300 ₹7,59,273 |
| 4.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 282.14 | sqm | 175 ₹49,374.5 Lowest | 200 ₹56,428 |
| 5.00 | 10mm thick cement plaster 1:4 on bed and top. | 73.84 | sqm | 135 ₹9,968.4 Lowest | 150 ₹11,076 |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 9.31 | cum | 10,000 ₹93,100 Lowest | 11,000 ₹1,02,410 |
| 7.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 21.64 | cum | 5,500 ₹1,19,020 Lowest | 5,600 ₹1,21,184 |
| 8.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 27.95 | cum | 4,100 ₹1,14,595 Lowest | 4,500 ₹1,25,775 |
| 9.00 | Lowering, jointing of UPVC pipes 180 mm dia laying same to correct gradient and alignment and jointing ends in all depths complete in all respect. | 2,836.97 | Mtr | 55 ₹1,56,033.35 Lowest | 60 ₹1,70,218.2 |
| 10.00 | Supplying, lowering of MS Pipe as per IS:4270-2001 including MS sockets having dimensions as per IS code duly welded with MS electrode to have extra strength to lower the pipe into tubewell bore. (a) 100mm nominal diameter (weight 14.5 kgper metre) 5.40 mm thickness | 37.5 | Mtr | 1,500 ₹56,250 Lowest | 2,000 ₹75,000 |
Tender Value
₹18.8 L
EMD Value
₹37,657
Closing Date
20 Apr 2026, 9:00 amClosed
Executive Engineer Devigarh Patiala Division
Executive Engineer/Devigarh Patiala Canal and Ground Water Division WRD Punjab Patiala Phone No 0175 2353311
ESTIMATE FOR LAYING OF UNDERGOUNDER uPVC PIPELINE OUTLET RD 24192/R OF KARHALI DISTY
2026_WR_165467_1
01/2026-27
Open Tender
Civil Works
Item Rate
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹37,657
Yes
20 Aug 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipelines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade,cutting joint holes,refilling consolidation,including the cost of diversion for traffic,crossing over trenches for access to the houses,watching,fencing etc. and removal of surplus soil outside/inside the town involving lead upto 15 meter complete in all respect. | - | cum | - | - |
| 2 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | cum | - | - |
| 3 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | - | cum | - | - |
| 4 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | - | sqm | - | - |
| 5 | 10mm thick cement plaster 1:4 on bed and top. | - | sqm | - | - |
| 6 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | - | cum | - | - |
| 7 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | cum | - | - |
| 8 | Cement concrete 1:4:8 with brick ballast 40mm gauge | - | cum | - | - |
| 9 | Lowering, jointing of UPVC pipes 180 mm dia laying same to correct gradient and alignment and jointing ends in all depths complete in all respect. | - | Mtr | - | - |
| 10 | Supplying, lowering of MS Pipe as per IS:4270-2001 including MS sockets having dimensions as per IS code duly welded with MS electrode to have extra strength to lower the pipe into tubewell bore. (a) 100mm nominal diameter (weight 14.5 kgper metre) 5.40 mm thickness | - | Mtr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_335710.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .