| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAccepted-AOC C 27 SECTOR K ALIGANJ LUCKNOW UTTAR PRADESH 226024 UDYAM UP 50 0004925 09AAPCS6138R1Z9 B R M MII STATUS AS NOT VERIFIED | LUCKNOW | UTTAR PRADESH | 226024 | ₹38.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹43.1 LRejected-Finance 16 46A ENVIO ENERGY TECHNOLOGIES PRIVATE LIMITED GEETA COLONY EAST DELHI DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹43.1 L | L2 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 3 | Rejected-Technical 229 CHANDEL MARKET HARJINDER NAGAR KANPUR 208007 | KANPUR | KANPUR | UTTAR PRADESH | 208007 | - | - | Rejected-Technical BIDDER FAILED TO MEET ELIGIBILITY CRITERIA MENTION IN NIT |
| 4 | Rejected-Technical 11 82 GROUND FLOOR BLOCK 11 KALYAN PURI EAST DELHI DELHI 110091 UDYAM DL 02 0083384 | EAST DELHI | DELHI | 110091 | - | - | Rejected-Technical BIDDER FAILED TO MEET ELIGIBILITY CRITERIA MENTION IN NIT |
| 5 | Rejected-Technical | - | - | Rejected-Technical BIDDER FAILED TO MEET ELIGIBILITY CRITERIA MENTION IN NIT |
| Sl No | Description | Qty | Unit | Shriddha Power Solutions Private Limited L1 | ENVIO ENERGY TECHNOLOGIES PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Design, procure, erection, installation, testing and commissioning including connecting to local utility grid; Roof top On-grid Solar Photovoltaic Plant of 40 kW capacity including Solar Photovoltaic Modules, DC Cabling, Module Mounting Structures, Array Combining Boxes, Lightning Protection of SPV modules and other accessories, Central Inverter and Power Conditioning Unit, Weather Station and Data Monitoring System all as per detailed specifications given in Particular Specification, latest MNRE/IREDA guidelines and directions, meeting the Domestic Content Requirement (DCR), consisting of all requisite accessories (BOS-Balance of System) and incuding the following main componenets:-
Make:-
1. MNRE approved list of manufacture and modules Solar PV Panel having IEC/BIS certificate.
2.Inverter/PCU- shall have BIS certificate and 10years warrenty.
(A) Crystaline Silicon Solar Photovolaic Modules TOPCon N-type Bifacial technology (efficiency will have higher module conversion) of not less than 575 Wp or more (module power and number of modules to be selected according to available roof top area & adequate walkway), having cell efficiency under standard conditions, form fill factor more than 0.76, plant performance ratio > 75%, made of high transmitivity glass front surface and it shall give high encapsulation gain (transmittance above 90% and bending less than 0.3%). The modules shall have the features as per detail in PS speciffied.-
(a) The electrical parameters of SPV modules under standard test condition of irradiance 1000 W/sqm, AM 1.5 Spectrum and temp 25 degree Celsius shall be as under:-
(b) Rated output of the modules shall have positive tolerance of 3-5% and no negative tolerance is allowed. | 1 | Each Job | 16,99,999 ₹17.0 L | 19,80,000 ₹19.8 L |
| 1.01(c) It shall perform satisfactorily in RH 85% with temperature up to +85 degree C and should withstand wind of 200 kmph on the surface of panel. (d) PV modules shall be warrented for their output peak watt capacity, and it shall not fall of its initial value below 90% in first 10 year end and 80% after the end of 25 years. (e) Each module shall have RFID tag encapsulated with solar cell bearing following details :- (i) Name of Manufacturer of SPV Module (ii) Name of Manufacturer of Solar Cell (iii) Month and year of Manufacturing (seperately for cell and module) (iv) Country of Origin (both cell and module)(Make in INDIA only) (v) Peak wattage, Im, Vm and fill factor of the module (vi) Date of year of obtaining IEC PV module qualification certificate including the test lab issuing IEC certificate. (vii) Unique serial no and model no of module (viii) IV curve of module (f) The temperature coefficient of power for the module shall not be more than 0.50% per degree Celcius. | |||||
| 1.02(g) Every module must have bypass diode of suitable capacity. (h) PV module must confirm to latest edition of IEC 61215/ IS 14286. In addition the modules must confirm to IEC 61730 Part I and II for construction and testing & safety qualifications and confirming to IEC 62804 PID or the latest relevant International Electrotechnical Commission (IEC). (j) It shall also be in confirmity to latest minimum technical specification issued by MNRE & IREDA from time to time. Modules should be of MNRE & IREDA approved companies and as per latest IEC/IS standards. (l) RFID reader is to be provided by contractor. (m) Each structure should have angle of inclination as per the site conditions to generate maximum power. However, to accommodate more capacity the angle inclination may be adjusted or as per IEC guideline until the plant meets the specified performance ratio requirements. (n) Any damage to the existing roof treatment of any type due to the Installation of Solar Power System shall be Re-done/made good as per existing treatment. Cost of the same shall be included in the unit rate quoted. Nothing extra shall be admissible on this Account. | |||||
| 1.03(B) Junction Boxes : Supply and fix jucntion boxes of suitable Nos (as per design)/ OEM recommendations inputs and suitably rated output having separate DC fuses for both (+) & (-) on input and isolator on output terminal for each string. Each junction box must have a spare input terminal. The junction boxes shall be dust and vermin proof and water proof made of FRP/ Thermo Plast with IP 65 protection in compliance with IEC 62208 and shall be UV resistant, fire retardant. It shall have surge protection and maintenance free earthing as per relecant standard. The junction box shall have suitable arrangement of the following :- (a) The strings are required to be connected to the copper bus bar through individual fuses. (b) Provide arrangement for disconnection (DC dis-connection switch) for each SJB/ SCB. (c) Provide a test point for each sub group for quick fault location and to provide group array isolation. (d) Each array box shall be of relevant IEC standard. (e) Each array junction box shall have suitable bypass & reverse blocking diodes for maximum DC blocking voltage of 1000V with suitable arrangement of its connection. Reverse blocking and bypass diodes shall work for extreme temperatures and shall have efficiency of 99.98% confirmed by appropriate IEC standard. Make : As per OEM | |||||
| 1.04(C) DC Cables : Suitable size of XLPE insulated tinned Copper cable as per latest IEC/IS speciffication and UV resistant for outdoor installations confirming to IEC : 60227/15694 & 60502/ IS : 1554 (Pt I&II) and shall be as under :- (i) Solar Cable -From Module to DCDB & Inverter- 1Cx6 Sqmm tinned copper cables,UV resistant,Solar Cable,TUV certified1800Vdc. (ii) AC Cables(Inverter to AC distribution Box):-4/3.5 C Sqmm power cables Cu conductor,XLPE insulation,unarmoured PVC outer sheath 1100V(Flexible Type) as per required capacity. (a) All cables and connectors for use of installation shall be of Solar grade which can withstand harsh enviromnetal conditions including high temperature, UV radiations, rain, dirt, burial and attack by moss and microbes for 25 years and voltage as per latest IEC/ IS. (b) All the cables / wires shall be provided with UV resistant printed ferrules for DC side. (c) The size of the cable shall be such that avarage voltage drop at full power from PV module to inverter shall be less than 1.5%. (e) The wiring of the module interconnection shall be in HDPE DWC pipe of suitable sizeor as per OEM recommended. (f) The cost of interconnecting DC Copper cable (not less than 6 sqmm of size) , MS cable trays, and earth work for trenches/ MS cable trays suitable to accommodate Solar grade cables from SPV module upto inverters are included in the item. | |||||
| 1.05(D) Module Mounting Structure (MMS) : Design, procure, fixing, support structure made of hot dipped galvanised with min 85 micron thickness including necessary PCC foundation and associated work (cutting, grouting, PCC filling, dispoing waste material, etc., complete) and fixing mounting arrangement suitable for SPV modules so as it can withstand wind speed of 200 km per hour. The mounting structure is to be installed at RCC Roofs and the array structure has to be so designed that maximum load is directly on roof beams and columns. It shall also occupy minimum space without sacrificing the output of SPV panels & adequate space between the arrays shall be available for easy cleaning and maintenance. Nuts, bolts, mounting structure including module mounting structure shall have to be adequately protected from the atmosphere and weather prevailing in the area. All the fastners shall be of Stainless Steel of grade SS316. Notes : (a) Two numbers of anti theft fastners of Stainless Steel on two diagonally opposite corners of each module shall be provided. (b) The modue mounting structure shall be of fixed to provide maximum generation. (c) MMS design shall be vetted by Gov engg college /Institute and approval by CWE/GE(I). (d) The height of Roof top MMS shall be as per latest MNRE & IREDA guidelines. | |||||
| 1.06(E) Lightning Protection for PV Array : Design, procure and fix lighting arrestor system cofirming to IS15086/ IEC-62305 (Part 1 - 4) on the roofs. The air terminal shall be fixed at the top of GI elevation pole with base so as per IEC speciffication/IS, the structure to be protected. Its height above roof level shall be depend upon the level of protection and protection radii required as per IEC speciffication. Notes : (a) The cost of all equipments, Copper strip upto earth test point,LA, etc., shall be deemed to be included in this item. (b) The cost of sufficient earthing for lightning protection is also included in this item as directed by engr-in-charge and no extra payement will be made to the contractor on this account. (c) Provision of earthing, numbers of earthing and earth strip / cable etc for earth of solar PV module, arra,inverter,dc & ac boxes and for LA etc as per latest IS/MNRE & IREDA norms to be provided and cost of the same is deemed to be included in the item and no extra amount will be paid to the contractor on this account in case of any dispute decesion of AO will be final and binding to contractor. (The earthing shall be of copper earth plate and having specification as per SSR Item Sr 19474). (F) Power Conditioning Unit : Procure, fixing, testing and commissioning of 40 KW AC (nominal power), Solar power inverter suitable to convert DC power of Solar PV module/ array to AC for further feeding to grid confirming to IEC : 61683 for efficiency, IEC : 62109-1 or equivalent for safety and IEC : 62093 for reliability. The input DC & output AC technical specification of Inverter as speciffication in PS. Input (DC) and Output AC | |||||
| 1.07Solar Grid Tie Inverter (Output AC) (a) AC grid connection type : 3Phase (4W + PE) (b) Nominal Power at unity PF : 40 kW (c) Max AC output power : 40KW (d) Max AC output Apperant power : 40KVA (e) Max AC output Current : 200 A (f) Max AC fault current : 217 A (g) Nominal Output Voltage : 415 V (h) Output voltage range : 415 V ± 20% (j) Output Frequency : 50 Hz ± 3Hz (k) Power factor : > 0.995 (l) Harmonic Distortion Current : < 3% (m) Efficiency : > 98% (n) Standby operation consumption : < 1.5 W | |||||
| 1.08Solar Grid Tie Inverter (Output AC) all paramiter for output of Inverter specified in PS (p) Operating temperature upto 85 degree centigrade (q) The inverter shall have minimum IP-67 protection, ground fault monitoring, grid monitoring, protection for anti-islanding, DC reverse polarity, AC and DC short circuit current and over current, AC and DC over voltage and over temperature. (r) The inverter shall adjust voltage and frequency levels to suit the grid. (s) The inverter shall be self commulated with Pulse Width Modulation (PWM) technology and shall be capable of synchronise maximum with in one min. (t) Maximum Power Point Tracker (MPPT) confirming to IEC 62093 shall be integrated in the inverter to maximise the energy drawn from the PV array. (u) Monolithic design of inverter is not permitted. (v) The inverter shall have suitble nos of protected inputs (asper design) and outgoing shall be protected by ACB/MCCB. (w) The Inverter monitoring portal should be on company's website and mobile based application with their logo on portal.Remote Monitoring system (RMS) should be provided free of cost for a period of 25 years. | |||||
| 1.09(x) The inverter should have MODBUS, PROFIBUS, ETHERNET common ports. (y) The inverter shall include appropriate self protection and self diagnostic feature to protect itself and the PV array from the damage in the event of inverter componant failure or from parameters beyond the inverters safe operating due to internal and/ or external causes. Inverter shall have protection arrangement against ground leakage faults, over voltage, (SPD) & over current. Inverter shall have arrangement for adjustment for adjusting DC input current and shall trip against sustainable fault down stream and shall not restart till fault is rectified. (z) The inverter should have provisions of Galvanic isolation, anti-islanding protection (IEEE 1547/UL 1741) equivant IS and lightening. (aa) PCU must have the feature to work in tandem with other similar PCUs and be able to be successively switched ON and OFF automatically based on solar radiation variations during the day. (bb)Inverter generated harmonics, flicker, DC injection limits, Volt range, frequency range and antiislanding measures should follow latest IEC 62116 / BIS Code. (G) Net Metering : Quoted rates inclusive of installtion of Net meter. | |||||
Updated dates
Tender Value
₹41.8 L
EMD Value
₹83,600
Closing Date
25 Oct 2025, 6:00 pmClosed
LT COL VISHAL BHURIA
GE I Kanpur Cariappa Road Cantt Kanpur 208004
PROVN OF ROOF TOP SOLAR POWER PLANT AT GE (I) KANPUR
2025_MES_732959_1
GE(I)/KAN/T-24 OF 2025-26
Open Tender
Electrical and Maintenance Works
180 days
KANPUR
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(I) KANPUR
₹83,600
Yes
20 Mar 2026
27 Sept 2025
1 Nov 2025
27 Sept 2025
25 Oct 2025
11 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TenderdocumentsT24.pdf
Tender Documents • 1.03 MB
BOQ_820674.xls
BOQ • 0.65 MB
Download all tender documents and submit your bid