| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-Finance | ₹10.7 L | L1 | Accepted-Finance Least Bidder |
| 2 | L2₹10.8 LRejected-Finance 3 56A 4TH MAIN ROAD RAMAKRISHNA NAGAR ERNAVOOR CHENNAI 57 | CHENNAI | TAMIL NADU | 600001 | ₹10.8 L | L2 | Rejected-Finance Higher Value |
| Sl No | Description | Qty | Unit | THANGAMMA ERECTORS L2 | KARTHIK ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling of condenser water pumps (209M3/Hr, 30 HP) / chilled water pumps (110M3/Hr,20HP) : This work involves isolating the pump by closing the suction & discharge valves, removing the coupling guard , decoupling the pump & motor, removing all the bolts and freeing the inlet and outlet flanges so that the pump can be moved from the bed.and providing the dummy at inlet and outlet flanges to arrest the water leakage. | 5 | nos | 41,700 ₹2.1 L | 41,500 ₹2.1 L |
| 2.00 | Charges for dismantling of eroded base frame of condenser water pumps (209M3/Hr, 30 HP) / chilled water pumps (110M3/Hr,20HP): This work involves cutting of wornout pipe supporting materials, and cutting of wornout pump base frame ,removing the existing foundation grouting and foundation bolt from bed, etc., | 5 | nos | 41,800 ₹2.1 L | 41,600 ₹2.1 L |
| 3.00 | Charges for fabrication of MS base frame , this work involves cutting & welding of structurals materials, machining the base plate, marking, drilling & tapping the required size in pump and motor bed, cleaning and painting the base frame and structures.(Required MS materials will be supplied by board) | 5 | nos | 53,500 ₹2.7 L | 53,200 ₹2.7 L |
| 4.00 | Charges for Fixing of base frames of chilled water pump: This work involves fixing and grouting of foundation bolts, fixing of pump & motor in base frame, grouting of base fame, placing the pump and motor on bed, alignment with pump and motor, replacing the existing spider type love joy coupling with the flexible tyre coupling, then coupling the motor and pump, removing the inlet and outlet dummy, assembling the inlet and outlet flanges, trial run and commissioning of chilled water pump as per the direction of engineer incharge. | 5 | nos | 78,800 ₹3.9 L | 78,500 ₹3.9 L |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
20 Feb 2026, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle MPM Rectification of base frame of Condenser water pumps chilled water
2026_EB_650480_1
CE NCTPS II SE M I O M 207 2025 26
Open Tender
Miscellaneous Works
45 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
19 May 2026
5 Feb 2026
21 Feb 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
Charges for dismantling of condenser water pumps (209M3/Hr, 30 HP) / chilled water pumps (110M3/Hr,20HP) : This work involves isolating the pump by closing the suction & discharge valves, removing the coupling guard , decoupling the pump & motor, removing all the bolts and freeing the inlet and outlet flanges so that the pump can be moved from the bed.and providing the dummy at inlet and outlet flanges to arrest the water leakage.
Charges for dismantling of eroded base frame of condenser water pumps (209M3/Hr, 30 HP) / chilled water pumps (110M3/Hr,20HP): This work involves cutting of wornout pipe supporting materials, and cutting of wornout pump base frame ,removing the existing foundation grouting and foundation bolt from bed, etc.,
Charges for fabrication of MS base frame , this work involves cutting & welding of structurals materials, machining the base plate, marking, drilling & tapping the required size in pump and motor bed, cleaning and painting the base frame and structures.(Required MS materials will be supplied by board)
Charges for Fixing of base frames of chilled water pump: This work involves fixing and grouting of foundation bolts, fixing of pump & motor in base frame, grouting of base fame, placing the pump and motor on bed, alignment with pump and motor, replacing the existing spider type love joy coupling with the flexible tyre coupling, then coupling the motor and pump, removing the inlet and outlet dummy, assembling the inlet and outlet flanges, trial run and commissioning of chilled water pump as per the direction of engineer incharge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_781630.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid