Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
3 Sept 2026, 3:00 pm6d left
Commissioner,Chidambaram Municipality
Chidambaram Municipality
Repair and Maintenance of mini power pump motors and toilet motors at 33 Municipal wards in chidambaram municipality
2026_MAWS_695096_1
2483/2026/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
365 days
Chidambaram Municipality
As per tender condition
2 documents required · 2 mandatory
₹0
₹15,000
Yes
18 Aug 2026
18 Aug 2026
3 Sept 2026
18 Aug 2026
3 Sept 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15 HP to 20 HP Submersible Motor
Coil Rewinding repairing and servicing of 15HP to 20 H.P Submersible motor and replacement of wernout parts of G. M.bush 4 Nos, Thrust bearing one set, water seal 2Nos,6sqr.mm Submersible cable 6Rm ,Refitting and Painting etc and Repairs and replacement of Pump Bushes,sleeives,Neck ring etc complete set make in good working Condition etc.(including cost of existing winding wire) | 6 | 1 No. | - | - |
| 2 | 25 HP Submersible Motor
Coil Rewinding repairing and servicing of 25HP Submersible motor and replacement of wernout parts of G. M.bush 4 Nos, Thrust bearing one set, water seal 2Nos,6sqr.mm Submersible cable 6Rm ,Refitting and Painting etc and Repairs and replacement of Pump Bushes,sleeives,Neck ring etc complete set make in good working Condition etc.(including cost of existing winding wire) | 8 | 1 No. | - | - |
| 3 | Coil Rewinding repairing and servicing of 30 HP to 40HP Centrifugal Pumpset and replacement of wernout parts of ball bearing set, Bearing housing Refitting and Painting etc make in good working Condition etc.(including cost of existing winding wire) | 5 | 1 No. | - | - |
| 4 | Repairing and servicing of 30HP to 40HP Split casing Centrifugal Pumpset and replacement of wernout parts of ball bearing set, Bushes, Shaft Recondioning, Packing Materials Refitting and Painting etc make in good working Condition etc.(including cost of existing wornout parts) | 4 | 1 No. | - | - |
| 5 | Labour charges for Removal of upto 10 H.P to 20 H.P submersible pump set and its accessories from bore well for attending repair including disjointing of submersible cable with proper clamps up to the starter and riser pipes to the required depth etc. complete | 7 | 1 No. | - | - |
| 6 | Labour charges for errection of upto 10 H.P to 20 H.P submersible pump set and its accessories from bore well for attending repair including disjointing of submersible cable with proper clamps up to the starter and riser pipes to the required depth etc. complete | 5 | 1 No. | - | - |
| 7 | Labour charges for Removal of upto 20 H.P to 30 H.P submersible pump set and its accessories from bore well for attending repair including disjointing of submersible cable with proper clamps up to the starter and riser pipes to the required depth etc. complete | 4 | 1 No. | - | - |
| 8 | Labour charges for the Erection 20 H.P to 30 H.P submersible pump set in bore well including fixing and jointing and submersible cable with proper clamps up to the starter to the required depth and also fixing of riser pipes to the required depth valves erection clamps etc. complete and testing pump sets and trial run for 7 days. | 6 | 1 No. | - | - |
| 9 | Labour charges for Removal of 30 H.P to 40 H.P Horizontal shaft, centrifugal pumpset (Coupled/Monoblock) in bore well/Open well and its accessories from bore well for attending repair including disjointing of submersible cable with proper clamps up to the starter and riser pipes to the required depth etc. complete | 5 | 1 No. | - | - |
| 10 | Labour Charges for erection of 30 H.P to 40 H.P Horizontal shaft, centrifugal pumpset (Coupled/Monoblock) in bore well/Open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure gauges upto the exterior wall of pump room and erection ofpanel board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by EB authorities | 6 | 1 No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_835833.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].