Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.9 LAccepted-AOC | ₹42.9 L | L1 | Accepted-AOC Lowest Rate. So Accepted |
| 2 | L2₹42.9 L+₹4,291.21 (0.10%)Rejected-Finance | ₹42.9 L+₹4,291.21 (0.10%) | L2 | Rejected-Finance Highest Rate. So Rejected |
| 3 | L3₹43.3 L+₹47,203.33 (1.10%)Rejected-Finance | ₹43.3 L+₹47,203.33 (1.10%) | L3 | Rejected-Finance Highest Rate. So Rejected |
Tender Value
₹42.9 L
EMD Value
₹43,000
Closing Date
3 Dec 2025, 5:00 pmClosed
Add. Chief Executive Officer
Z P Works Division Buldana
CONSTRUCTION OF ISLAMPUR TO KARANWADI ROAD.VR- 43( CH. NO 0/00 TO 2/00 KM ) TQ JALGAON JA. DIST BULDANA
2025_BULDH_1252572_7
14/2025-26
Open Tender
Civil Works
Percentage
180 days
CONSTRUCTION OF ISLAMPUR TO KARANWADI ROAD.VR- 4
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹43,000
5 Aug 2026
27 Nov 2025
5 Dec 2025
27 Nov 2025
3 Dec 2025
27 Nov 2025
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . Item No.2.07
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. Item No 2.18
Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with Power roller. Item no.2.24
Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). Item No.50.56
Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Item no. 50.58
Supplying hard murum/ kankar at the road site, including conveying and stacking complete. Item no. 2.29a
Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. Item no. 2.30
Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. Item no. 50.59
Compacting the hard murum / kankar for all widths (200mm loose) with static roller including necessary artificial watering etc. complete.
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. Item no. 2.31
Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 1000mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.Item no.11.12
Royalty for all other materials including 2% Surcharge
Add for material testing charges for crusher Metal - Crushing Value, Comp. Strength, Water absorption,Specific Gravity
Add for Material testing charges for Sieve Analysis
Add for Material testing charges for Flakiness Index
Add for Material testing charges for Liquid limit & Plastic Limit of Murrum
Add for Material testing charges for Sieve Analysis of Murrum
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
7_ISLAMPUR.pdf
Tender Documents • 0.95 MB
BOQ_2159487.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .