Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.1 LRejected-AOC | ₹4.1 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Selva Construction L1 | Sabareesan L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for Dismantling Exisitng Mini Mast system having mast structure should have head frame, winch set, with steel wire rope of 4/6 MM dia, single drum and provided with galvanized lantern carriage suitable for 1x6x200W Luminaries with Hoisting arrangements etc; including the cost of crane arrangements for removing of locked rope mast system with rec structure etc complete | 17.83 | M3 | 4,610 ₹82,196.30 | 4,620 ₹82,374.60 |
| 2.00 | Earth work excavation for foundation in all type of soils as may be directed except in hard rock requiring blasting and also including refilling the sides of foundations with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial leads and lifts and clearing and leveling the site etc., complete complying with the standard specification, drawing and as directed by departmental Engineers, with initial lead of 10m and lift of 2mts. for ordinary soil. | 5.83 | M3 | 263.5 ₹1,536.73 | 265 ₹1,545.48 |
| 3.00 | Supplying and Filling in foundation and basement with Filling M-Sand in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25).ding into consolidation etc., complete. | 0.49 | M3 | 2,428 ₹1,180.01 | 2,432 ₹1,181.95 |
| 4.00 | Plain cement concrete in mix 1:4:8 ( One cement , four sand and eight aggregate) using 40 mm ISS HBG metal including cost and conveyence of all meterials to work site and labour charges for mixing, laying, curing etc complete as per the standard specification. | 0.81 | M3 | 6,394 ₹5,179.14 | 6,400 ₹5,184 |
| 5.00 | Supplying, fabricating & placing in position MS or deformed steel bars (upto 16 mm dia) for RCC items of work including cost of steel, transporting, straightening, cutting, bending, cranking, binding etc, including cost of binding wire chairs, laps to fix the reinforcement in all positions, all labour & materials including Providing Fusion Bonded Epoxy coating not less than 175microns thickness and upto 300 microns to reinforcement of all diameters as per IS 13620/1993 including testing of coating at plant.The cost is inclusive of cost on account of careful handling, PVC coated binding wires, touchup material supplied by coating agency, repair work, loading, unloading and strengthening of bent rods etc., complete as per specification and as directed by the Engineer in charge. | 600 | kg | 92.9 ₹55,740 | 95 ₹57,000 |
| 6.00 | Supplying errecting centering for sides and soffits including necessary supports for height(as mentioned below) using mild steel angles of size 25mm x 25mm x 3mm laid over country wood joists of size 10 cm x 6.50cm spaced at 90cm center to center and supported by casurina props of 10cm to 13 cm dia( spaced at 90cm center to center) as directed for column, beam, slab cantilever beam, cantilever slab, waist slab and slop surface etc., complete as per standard specification | 12.96 | m2 | 623 ₹8,074.08 | 625 ₹8,100 |
| 7.00 | Reinforced plain cement concrete of mix 1:11/2:3 (one cement two sand and four course aggregate ) using hard broken granite stone jelly of 20mm gauge for foundation levelling course including shuttering dewatering wherever necessary and laid in layers of not more than 15cm thick complete complying with standard specification and drawing and as directed by the departmental Engineers. | 2.97 | M3 | 8,980 ₹26,670.60 | 8,990 ₹26,700.30 |
| 8.00 | Supply and Delivery of M30 x 850mm Length foundation bolts (EN8 Grade) - 4 sets. With necessary nuts & Washers including Base plate &Template arrangements. PWD SOR P-379 | 69 | Nos | 234.5 ₹16,180.50 | 236 ₹16,284 |
| 9.00 | Supply and laying of. U.G. cable:
Supply and laying of 4core x 16 sqmm PVC armoured (Aluminium) L.T.U.G. cable in a trench to be excavated at a depth of 0.75meter putting 0.15mtr. layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good. as per standard specification. SD 667 | 20 | RM | 396.5 ₹7,930 | 398 ₹7,960 |
| 10.00 | Supply and providing of cable termination:
Supply and providing of cable termination of 4core x 16sqmm PVC LT UG (Aluminium) armoured cable with necessary aluminium socket by crimping with electrical connection etc. complete. SD 197 | 4 | Nos | 331.5 ₹1,326 | 333 ₹1,332 |
Tender Value
₹4.3 L
EMD Value
₹4,300
Closing Date
13 Feb 2026, 3:00 pmClosed
Commissioner kumbakonam city Municipal Corporation
Commissioner kumbakonam city Municipal Corporation
Shifting and Fixing of street Lights from thaikkal kulam to mottagoburam in Kumbakonam City Municipall Corporation
2026_MAWS_655299_1
001278/2026/E2
Open Tender
Civil Works
90 days
kumbakonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,300
Yes
18 Mar 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
Charges for Dismantling Exisitng Mini Mast system having mast structure should have head frame, winch set, with steel wire rope of 4/6 MM dia, single drum and provided with galvanized lantern carriage suitable for 1x6x200W Luminaries with Hoisting arrangements etc; including the cost of crane arrangements for removing of locked rope mast system with rec structure etc complete
Earth work excavation for foundation in all type of soils as may be directed except in hard rock requiring blasting and also including refilling the sides of foundations with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial leads and lifts and clearing and leveling the site etc., complete complying with the standard specification, drawing and as directed by departmental Engineers, with initial lead of 10m and lift of 2mts. for ordinary soil.
Supplying and Filling in foundation and basement with Filling M-Sand in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25).ding into consolidation etc., complete.
Plain cement concrete in mix 1:4:8 ( One cement , four sand and eight aggregate) using 40 mm ISS HBG metal including cost and conveyence of all meterials to work site and labour charges for mixing, laying, curing etc complete as per the standard specification.
Supplying, fabricating & placing in position MS or deformed steel bars (upto 16 mm dia) for RCC items of work including cost of steel, transporting, straightening, cutting, bending, cranking, binding etc, including cost of binding wire chairs, laps to fix the reinforcement in all positions, all labour & materials including Providing Fusion Bonded Epoxy coating not less than 175microns thickness and upto 300 microns to reinforcement of all diameters as per IS 13620/1993 including testing of coating at plant.The cost is inclusive of cost on account of careful handling, PVC coated binding wires, touchup material supplied by coating agency, repair work, loading, unloading and strengthening of bent rods etc., complete as per specification and as directed by the Engineer in charge.
Supplying errecting centering for sides and soffits including necessary supports for height(as mentioned below) using mild steel angles of size 25mm x 25mm x 3mm laid over country wood joists of size 10 cm x 6.50cm spaced at 90cm center to center and supported by casurina props of 10cm to 13 cm dia( spaced at 90cm center to center) as directed for column, beam, slab cantilever beam, cantilever slab, waist slab and slop surface etc., complete as per standard specification
Reinforced plain cement concrete of mix 1:11/2:3 (one cement two sand and four course aggregate ) using hard broken granite stone jelly of 20mm gauge for foundation levelling course including shuttering dewatering wherever necessary and laid in layers of not more than 15cm thick complete complying with standard specification and drawing and as directed by the departmental Engineers.
Supply and Delivery of M30 x 850mm Length foundation bolts (EN8 Grade) - 4 sets. With necessary nuts & Washers including Base plate &Template arrangements. PWD SOR P-379
Supply and laying of. U.G. cable: Supply and laying of 4core x 16 sqmm PVC armoured (Aluminium) L.T.U.G. cable in a trench to be excavated at a depth of 0.75meter putting 0.15mtr. layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good. as per standard specification. SD 667
Supply and providing of cable termination: Supply and providing of cable termination of 4core x 16sqmm PVC LT UG (Aluminium) armoured cable with necessary aluminium socket by crimping with electrical connection etc. complete. SD 197
50mm dia G.I pipe: Supply and Laying of 50mm dia G.I pipe( Road Crossing) and clamping for EB service connection and cable covering. (Excluding GST)
Supply and deliver of 150W led for streetlight fitting including all labour charges etc. complete as directed by departmental engineering incharge SD 461
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_785712.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_785712.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid