| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.0 LAccepted-AOC | ₹22.0 L | L-1 | Accepted-AOC responsive |
| 2 | L-2₹22.2 LRejected-Finance MORADABAD CIRCLE PWD MORADABAD PROVINCIAL DIVISION PWD SAMBHAL | SAMBHAL | UTTAR PRADESH | 242021 | ₹22.2 L | L-2 | Rejected-Finance NON RESPONSIVE |
Tender Value
₹23 L
EMD Value
₹2.3 L
Closing Date
28 Apr 2026, 12:00 pmClosed
EE PD PWD SAMBHAL
EE PD PWD SAMBHAL
Year 2025-26 Construction of Aanganwari Kendra in village Saijna Block Pawansa Distt Sambhal
2026_CEMBD_1140077_3
987/E-Nivida/25-26 DT 29-03-2026
Open Tender
Civil Works - Buildings
180 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹2.3 L
Yes
20 May 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF ANGANWADI CENTRE | - | - | - | - | BI01010001010000000000000515BI0100001124 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. DSR-2.8.1
and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | cum | - | - | BI01010001010000000000000515BI0100001125 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR-2.25A and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | cum | - | - | BI01010001010000000000000515BI0100001126 |
| 4 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation DSR-4.1.8 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | cum | - | - | BI01010001010000000000000515BI0100001127 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR.-2.27 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | cum | - | - | BI01010001010000000000000515BI0100001128 |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration DSR-2.35.3 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | sqm | - | - | BI01010001010000000000000515BI0100001129 |
| 7 | Providing and laying in position specfied grade of reinforcement cement concrete, excluding the cost of centering,shuttering,finishing & reinforcement. All work up to plinth level. 1:1.5:3 (1 cement,1.2 coarse sand zone-iii,3 graded stone aggregate 20mm. (Nominal size) DSR.-5.1.2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | cum | - | - | BI01010001010000000000000515BI0100001130 |
| 8 | Reinforcement cement concrete work in beam,suspended floors,roof having slope up to 5% andings,balconies,shelves,chajjas,lintels,bands,plain windows sills,stair case & sprial stair case above plinth up to floor five level excluding the cost of centering,shuttering,finishing & reinforcement with 1:1.5:3 (1 cement,1.2 coarse sand zone-iii,3 graded stone aggregate 20mm. (Nominal size) DSR.-5.3 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | cum | - | - | BI01010001010000000000000515BI0100001131 |
| 9 | Centering,shuttering inluding strutting,proping etc. & removal of form for Foundations, footings, bases of columns, etc. for mass concrete. DSR.-5.9.1 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | sqm | - | - | BI01010001010000000000000515BI0100001132 |
| 10 | Centering,shuttering inluding strutting,proping etc. & removal of form for Suspended floors, roofs, landings, balconies and access platform. DSR.-5.9.3 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | sqm | - | - | BI01010001010000000000000515BI0100001133 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.92 MB
Tendernotice_2.pdf
PDF • 6.78 MB
BOQ_2128844.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid