Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Fee/PreQual/Technical/Finance | +3.00% | ₹13.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.9 L+₹76,258.13 (5.83%)Admitted-Fee/PreQual/Technical/Finance | +9.00% | ₹13.9 L+₹76,258.13 (5.83%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,710
Closing Date
23 Jul 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
BRAHMAPUR, ODISHA, 760002
Const of Badminton court near Beda Bandha in ward no - 26 under MSBY scheme
2026_ORULB_134208_31
BeMC(BAM)/328/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹12,710
Yes
27 Jul 2026
9 Jul 2026
24 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
9 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling in foundation and plinth with
sand watered and rammed including
cost of sand & labour | 45.11 | cum | 1,553.39 | ₹70,067.21 |
| 2 | Cement concrete (1:4:8) with 4cm. Size
crusher broken hard Granite metal
including cost of all labour, materials
with all taxes, lead,T & P etc all
complete . | 48.11 | cum | 5,748.17 | ₹2,76,561.7 |
| 3 | RCC work M20 with 20 mm and down
graded size black hard grinite ( crusher
broken ) stone chips including
hoisting,lowering & laying concrete &
compacting by using vibrator watering &
curing for 4 weeks including cost &
conveyance, royalties & taxes of all
materials & labour required for the work
etc complete with all T & P in all respect
but excluding cost & conveyance of M.S
rods & binding wires & tying the grills &
placing in proper position.(including
centering & shuttering etc complete) | 46.82 | cum | 6,274.6 | ₹2,93,751.05 |
| 4 | Supplying, fitting, fixing of green
badminton court synthetic flooring
whose thickness 3.5 mm to 8 mm | 1,617.8 | sqm | 100 | ₹1,61,780 |
| 5 | Fly ash brick masonary in
SUPERSTRUCTURE using cement
mortar (1:6) | 24.28 | cum | 5,544.86 | ₹1,34,640.29 |
| 6 | Supplying, fitting and placing
uncoated HYSD bar reinforcement
complete as per drawing and technical
specification. | 7.02 | qtl | 9,253.15 | ₹64,979.32 |
| 7 | 16mm thick CP(1:6) over the wall | 136.11 | sqm | 283.72 | ₹38,616.56 |
| 8 | 12 mm thick CP(1:6) over the wall | 136.11 | sqm | 198.85 | ₹27,064.88 |
| 9 | Painting two coats with weather seal coat over a coat of water bound wall
primer | 272.21 | sqm | 167 | ₹45,459.07 |
| 10 | Supplying, fitting, fixing of MS Grill over
the wall | 793.12 | kg | 70.5 | ₹55,914.96 |
stage.html
html • 0.02 MB
finance_600114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCN1.pdf
Tender Documents • 1.60 MB
BOQ_600114.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .