Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-Finance | ₹12.4 L | L1 | Accepted-Finance Due to L1 Bidder |
| 2 | L2₹12.5 LRejected-Finance | ₹12.5 L | L2 | Rejected-Finance Due to L2 Bidder |
| 3 | L3₹14.8 LRejected-Finance AT BHOKANJI PO BADAMUNDILO PS DIST JAGATSINGHPUR | ₹14.8 L | L3 | Rejected-Finance Due to L3 Bidder |
| 4 | L3₹14.8 LRejected-Finance AT KULASAMANTARAPUR PO SAMANTARAPUR PS TIRTOL DISTRICT JAGATSINGHPUR | KULASAMANTARAPUR | JAGATSINGHPUR | ODISHA | ₹14.8 L | L3 | Rejected-Finance Due to L3 Bidder |
| 5 | L3₹14.8 LRejected-Finance | ₹14.8 L | L3 | Rejected-Finance Due to L3 Bidder |
Tender Value
₹14.8 L
EMD Value
₹14,900
Closing Date
28 Jan 2026, 5:30 pmClosed
Block Development Officer
Block Development Officer, O/o the Panchayat Samiti, Tirtol
Construction of Additional Class Building of Bhagabati UP Govt. School, Bijipur of Gopalpur (S) G.P. of Tirtol Block
2026_PRBTO_124556_1
NOTICE NO.BDO-TPS-03 OF 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Tirtol
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,900
Yes
12 Mar 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
14 Jan 2026 - 22 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority : BLOCK DEVELOPMENT OFFICER, O/O THE PANCHAYAT SAMITI, TIRTOL, JAGATSINGHPUR
Name of Work : Construction of Additional Class Building of Bhagabati UP Govt. School, Bijipur of Gopalpur (S) G.P. of Tirtol Block
Contract No : BDO-BKD/PS-03 of 2025-26
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
0_) Earth work excavation hard soil or gravelly soil including dressing and leveling the bed and depositing the soil within initial lead of 50m and initial lift of 1.50m and breaking the clods 5cm to 7cm size and laying in layer not exceeding 0.30m depth complete as per specification and direction of the Engineer-in-Charge. 0.00_) One Cum 0.99_) Excess(+) Full Conversion INR INR Fourteen Thousand Two Hundred & Forty Eight and Paise Seventy Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
0_) Filling in foundation & plinth with sand well watered to saturated condition and rammed including all cost, carriage, royalty, taxes of materials with all labour charges cess etc. complete as per the direction of the Engineer-in-Charge. 0.99_) One Cum 0.99_) Excess(+) Full Conversion INR INR Thirty Five Thousand Nine Hundred & Seventeen and Paise Four Only
0_) Cement Concrete (1:3:6) with 40mm size hard granite crusher broken metal confirming to relevant BIS specifications with all cost, conveyance, royalty of all materials T&P, cess including scaffolding, walkways & properly mixing, hoisting & placing concrete to desired workability & curing for recommended period etc. complete as per the direction of the Engineer-in-Charge. 0.99_) One Cum 0.00_) Excess(+) Full Conversion INR INR Fifty Thousand Six Hundred & Eighteen and Paise Fifteen Only
0_) Brick work with Fly ash Bricks 25cmx 12cm x 8cm size having crushing strength not less than 75kg / sqcm with dimensional tolerance ±8 percent in cement motar (1.6) in foundation including all cost of materials conveyance, royalty and all other taxes including watering and curring etc. complete as per the direction of the Engineer-in-Charge. 0.00_) One Cum 0.00_) Excess(+) Full Conversion INR INR Seventy Five Thousand Nine Hundred & Twenty Eight and Paise Twenty Four Only
0_) Brick work with Fly ash Bricks 25cmx 12cm x 8cm size having crushing strength not less than 75kg / sqcm with dimensional tolerance ±8 percent in cement motar (1.6) in Superstructure including all cost of materials conveyance, royalty and all other taxes including watering and curring etc. complete as per the direction of the Engineer-in-Charge. 0.99_) One Cum 0.00_) Excess(+) Full Conversion INR INR One Lakh Forty Five Thousand Six Hundred & Forty Eight and Paise Seventy One Only
0_) Cement Concrete M-20 with 20mm and downgraded size hard granite crusher broken chips for PCC / RCC work confirming to relevant BIS specifications for all materials including scaffolding, walkways & properly mixing, hoisting & laying with desired workability with all cost, conveyance, royalty of all materials, T&P labour charges, cess etc. complete including curring for recommended period as per the direction of the Engineer-in-Charge. (Column Base & footing) 0.00_) One Cum 0.99_) Excess(+) Full Conversion INR INR Eighty Five Thousand Eight Hundred & Ninety Two and Paise Ninety Three Only
0.9_) Plinth beam 0.00_) One Cum 0.99_) Excess(+) Full Conversion INR INR Twenty Three Thousand &Ninety Nine and Paise Eighty Six Only
0.0_) Lintels 0.99_) One Cum 0.99_) Excess(+) Full Conversion INR INR Thirty Six Thousand Three Hundred & Seventeen and Paise Fifty Two Only
0.9_) Chajja 0.00_) One Cum 0.00_) Excess(+) Full Conversion INR INR Twenty Two Thousand One Hundred & Eighty Nine and Paise Fifty Four Only
0.0_) Columns and Beams 0.99_) One Cum 0.00_) Excess(+) Full Conversion INR INR One Lakh Twenty Five Thousand Three Hundred & Seventy Two and Paise Sixty Three Only
0.0_) Roof Slab 0.00_) One Cum 0.99_) Excess(+) Full Conversion INR INR One Lakh Thirty Two Thousand Four Hundred & Fifty Two and Paise One Only
0.9_) Stair 0.00_) One Cum 0.00_) Excess(+) Full Conversion INR INR Twenty Nine Thousand Two Hundred & Thirty One and Paise Four Only
0_) Supplying, fitting, fixing of HYSD including labour charges for straightening, cutting, bending and binding the H.Y.S.D. Bar or tor steel and tying the grills and placing in position (confirming to I.S.I specification) including jointing if necessary by lapping, welding as required for R.C.C work as per approved drawing and design & binding with binding wire 18 to 20 gauge including cost carriage and other taxes of all materials with all leads, lifts & delifts of reinforcement bars etc. complete as per the direction of the Engineer-in-charge 0.99_) One Qntl. 0.99_) Excess(+) Full Conversion INR INR Three Lakh Seven Thousand Five Hundred & Ninety and Paise Fifty Two Only
0_) 20mm thick cement plaster in cement mortar (1:4) as grading plaster in roof and slab confirming to BIS specifications with all cost, conveyance, royalty and labour charges, cess including scaffolding and curring for recommended period etc complete as per the direction of the Engineer-in-Charge. 0.99_) One Sqm 0.99_) Excess(+) Full Conversion INR INR Eighteen Thousand Five Hundred & Twenty Eight and Paise Fourteen Only
0_) Cement Concrete (1:4:8) with 40mm size and downgraded hard granite crusher broken metal confirming to relevant BIS specifications with all cost, conveyance, royalty of all materials T&P, cess including scaffolding, walkways & properly mixing, hoisting & placing concrete to desired workability & curing for recommended period etc. complete as per the direction of the Engineer-in-Charge. 0.00_) One Cum 0.00_) Excess(+) Full Conversion INR INR Forty Six Thousand Nine Hundred & Seventy One and Paise Ninety Nine Only
0_) Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm thick bed of cement mortar (1:4) (1 cement:4 sand) jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge 0.99_) One Sqm 0.00_) Excess(+) Full Conversion INR INR Eighty One Thousand Eight Hundred & Three and Paise Twenty One Only
0_) Supplying fittting and fixing Cemamec wall tiles intrades, riserss and dadoos floors of size 200mm x 300 mm of approved make confirming to IS : 13755 laid on 12 mm thgick cement mortar (1:3) and filling the joints with white cement of approved qualitty including cost of all materials, royalty, labour, T&P etc. required for the work all complete as per the direction of the Engineer-In-Charge. 0.00_) One Sqm 0.99_) Excess(+) Full Conversion INR INR Four Thousand Nine Hundred & Twenty Three and Paise Sixty Four Only
0_) Supplying fittting and fixing industrial floors, treads or steps and landing of approved make confirming to IS : 13755 laid on 20 mm thgick cement mortar (1:4) and filling the joints with white cement of approved qualitty including cost of all materials, royalty, labour, T&P etc. required for the work all complete as per the direction of the Engineer-In-Charge. 0.99_) One Sqm 0.00_) Excess(+) Full Conversion INR INR Fifteen Thousand Three Hundred & Sixty Four and Paise Ninety One Only
0_) Providing 6mm thick cement plastering (1:4) to RCC surfaces finished smooth including closed chipping, cleaning, adding adhesive to slurry treatment etc. all cost, carriage, royalty of materials, labour and all other taxes of materials with watering, curing etc complete as per the direction of the Engineer-in-Charge 0.99_) One Sqm 0.00_) Excess(+) Full Conversion INR INR Twelve Thousand Two Hundred & Seventy Two and Paise Sixty Six Only
0_) Providing 16 mm thick cement plaster with cement mortar (1:6) over brick masonry including mixing of mortar and curing with cost, carriage, royalty of all materials & all labour charge, T&P etc. complete as per direction of the Engineer-in-Charge. 0.00_) One Sqm 0.99_) Excess(+) Full Conversion INR INR Thirty Four Thousand Two Hundred & Fifty Two and Paise Eighty Five Only
0_) Providing 12 mm thick cement plaster with cement mortar (1:6) over brick masonry including mixing of mortar and curing with cost, carriage, royality of all materials & all labour charge, T&P etc. complete as per direction of the Engineer-in-Charge. 0.00_) One Sqm 0.99_) Excess(+) Full Conversion INR INR Thirty One Thousand Eight Hundred & Sixty Five and Paise Forty Six Only
0_) Finishing walls with water proofing weather coat of approved shade on new work two coats, over a coat of priming, to give an even shade with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. 0.00_) One Sqm 0.00_) Excess(+) Full Conversion INR INR Twenty One Thousand Five Hundred & Seventy Three and Paise Thirty Four Only
0_) Finishing walls with plastic emulsion paint of approved colour to approved shade two coats over a coat of primer to give an even shade including cost, conveyance, taxes of all materials, labour, T&P etc. complete as per direction of Engineer-in-Charge. 0.99_) One Sqm 0.00_) Excess(+) Full Conversion INR INR Forty Five Thousand Four Hundred & Forty Six and Paise Seventy Seven Only
0_) Supply, fitting & fixing of G.I. made gates, doors & windows frame with shutters as per approved design including cost of all ornamental materilas & all other taxes etc. complete as per the direction of the Engineer-in-charge. 0.00_) One Kg. 0.00_) Excess(+) Full Conversion INR INR Fifty Thousand Eight Hundred & Twenty Only
0_) Painting two coats over a coat of primer with any approved paint with brush to GI door including cost, conveyance, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. 0.00_) One Sqm 0.00_) Excess(+) Full Conversion INR INR Six Thousand Five Hundred & Twenty Two and Paise Fifty Four Only
0_) Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx 32mm x 2mm @ 0.90Mtr corner to corner and stainless square pipe bracing of size 32mmx 32mm x 2mm in three rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P with all leads, lifts & delifts etc. complete as per direction of Engineer-in-Chief. 0.00_) One Mtr. 0.00_) Excess(+) Full Conversion INR INR Twenty Six Thousand Three Hundred & Twenty Two and Paise Twenty Eight Only
Total in Figures INR Fourteen Lakh Eighty One Thousand One Hundred & Seventy Four and Paise Seventy Three Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BID1.pdf
Tender Documents • 19.72 MB
BOQ_575700.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].