Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC URBAN ESTATE URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | ₹2.4 Cr | L1 | Accepted-AOC Lowest 1 |
| 2 | L2₹2.6 Cr+₹18.9 L (7.94%)Rejected-AOC | ₹2.6 Cr+₹18.9 L (7.94%) | L2 | Rejected-AOC higher |
| 3 | L3₹2.5 Cr+₹13.9 L (5.85%)Rejected-AOC NA | NA | NA | 121004 | ₹2.5 Cr+₹13.9 L (5.85%) | L3 | Rejected-AOC higher |
| 4 | L4₹2.7 Cr+₹36.1 L (15.2%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹2.7 Cr+₹36.1 L (15.2%) | L4 | Rejected-AOC higher |
| 5 | L5₹2.9 Cr+₹51.1 L (21.5%)Rejected-AOC FLAT NO 2450 KRISHNA COLONY JIND 126102 | JIND | HARYANA | 126102 | ₹2.9 Cr+₹51.1 L (21.5%) | L5 | Rejected-AOC higher |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
12 Oct 2023, 4:00 pmClosed
ROHIT KUMAR
EE PHE Division Hansi
Const. of RCC NP2 Pipe Channel, Const. of 2 No. S/S Tank Brick lining, RCC S/S Well for Raw water and Clear water, 2 No. High level tank, 3 No. RCC Filter beds, 2 No. Clear water tank, Pump Chamber, B/wall, C.Conc. path etc.
2023_HRY_314774_1
2023D0C2E6D6 0BF3 4FD1 ADAF BF1ED7E1B94C567PUH
Open Tender
Civil Works
Works
500 days
RAJTHAL
6 documents required · 6 mandatory
₹15,000
₹5.6 L
Yes
6 Mar 2024
25 Sept 2023
12 Oct 2023
25 Sept 2023
12 Oct 2023
25 Sept 2023
25 Sept 2023 - 11 Oct 2023
Amount
Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 12.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked Discharge Capacity (LPM) 1500 Power Capacity (BHP) 12.5
Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 2) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
SURENDER CONT(GSTN-NA)
SANJAY KHARB CONTRCATOR(GSTN-NA)
SANDEEP KUMAR CONTRACTOR(GSTN-NA)
RAM PHAL SINGH CONT(GSTN-NA)
VINAY KUMAR CONTRACTOR(GSTN-NA)
M/S AAR PEE CONSTRUCTION COMPANY JIND(GSTN-NA)
SURENDER CONT
M/S AAR PEE CONSTRUCTION COMPANY JIND
ROHTASH KUMAR CONTRACTOR
RAM PHAL SINGH CONT
SANDEEP KUMAR CONTRACTOR
VINAY KUMAR CONTRACTOR
RAM PHAL SINGH CONT
SURENDER CONT
ROHTASH KUMAR CONTRACTOR
M/S AAR PEE CONSTRUCTION COMPANY JIND
SANDEEP KUMAR CONTRACTOR
VINAY KUMAR CONTRACTOR
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .