| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance 16 RAZMAN BAZAR BC CANT LUCKNOW LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | UTTAR PRADESH | 226001 | L1 | Admitted-Finance | ||
| 2 | L2₹11.6 L+₹5,505.01 (0.48%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11.7 L+₹10,775.76 (0.93%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹11.7 L
EMD Value
₹23,426
Closing Date
26 May 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishd Shamli
Construction work for a road and drainage system in Ward No. 20, Gagan Vihar extending from Praveen Saini house to Rajkumar house.
2026_DOLBU_1144476_52
196/E-T/PWC/2025-26
Open Tender
Civil Works
Percentage
30 days
Construction work for a road and drainage system i
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹23,426
16 Jun 2026
4 May 2026
27 May 2026
4 May 2026
26 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). | 9.45 | Cum | 1,000 | ₹9,450 |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). | 9.08 | Cum | 400 | ₹3,632 |
| 3 | Deduct the cost of old bricks | 627 | Nos | 4.2 | ₹2,633.4 |
| 4 | Ded the cost of old bricks/batts | 1.36 | Cum | 600 | ₹816 |
| 5 | Excavation in foundation in odinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer incharge upto a distance of 30Mfrom the foundation trenches | 33.6 | Cum | 95 | ₹3,192 |
| 6 | Cartage of Ballast, Kankar, Coal, Grit or Sand 1 etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 30.24 | Cum | 230.1 | ₹6,958.22 |
| 7 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc, required for proper completion of the work. | 14.36 | Cum | 4,850 | ₹69,646 |
| 8 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 14.59 | Cum | 5,750 | ₹83,892.5 |
| 9 | Providing, laying, spreading and compacting stone aggregates of 53 mm to 22.4 mm size to water bound macadam specification including spreading in uniform thickness, hand packing. rolling with 3 wheeled steel vibratory roller in stages to proper grade and carnber, applying and hrooming requisite type of screening binding Materials to fill up the interstices of course aggregate, watering and compacting to the required density | 77 | Cum | 3,656.8 | ₹2,81,573.6 |
| 10 | Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in ce pavement (theckness as per design cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel laying and fixing o\f 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrator sand finished in. continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etel & concrete etc. | 92.4 | Cum | 7,300 | ₹6,74,520 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.06 MB
technicaldocuments.pdf
Tender Documents • 6.04 MB
BOQ_2139922.xls
BOQ • 0.26 MB
corrigendum.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .