Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | L1 | Accepted-AOC Low Rate | |
| 2 | L2₹30.4 L+₹5.5 L (22.1%)Accepted-AOC | L2 | Accepted-AOC High Rate | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
5 Sept 2019, 12:00 pmClosed
Superintending Engineer Electricity Work Circle Mi
Superintending Engineer Electricity Work Circle Mirzapur
Shifting of 11 KV Line/LT Line Due to Widening Of The Road From Ghorawal To Bardiya Link Road On Demand of EE, PMGSY, Sonebhadra. Jama Yojana Scheme year-2019-20
2019_PVVNV_376664_1
01/EWC(M)/2019-20
Open Tender
Construction Works
Lump-sum
120 days
Superintending Engineer Electricity Work Circle Mi
Please Refer Tender Document
2 documents required · 2 mandatory
₹725
Superintending Engineer Electricity Work Circle
₹36,000
Yes
6 Sept 2019
29 Aug 2019
6 Sept 2019
29 Aug 2019
5 Sept 2019
29 Aug 2019
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .