| 1 | ₹4.5 CrAWARDED | ₹4.5 Cr | AWARDED |
Tender Value
₹4.0 Cr
EMD Value
₹6.0 L
Closing Date
27 May 2025, 10:30 pmClosed
Public Works Department
WIDENING AND IMPROVEMENTS TO ARALIMATTI-VENKATAPUR MDR ROAD KM 0.00 TO 2.40 IN MUDALAGI TALUKA OF BELAGAVI DISTRICT UNDER 5054-04-337-0-01-154 MDR ROAD IMPROVEMENTS (APPENDIX-E) FOR 2024-25
PWD/2025-26/RD/WORK_INDENT21630
PWD/2025-26/RD/WORK_INDENT21630
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Chikkodi
₹5,000
₹6.0 L
12 May 2025
12 May 2025
29 May 2025
23 May 2025
22 May 2025
WIDENING AND IMPROVEMENTS TO ARALIMATTI-VENKATAPUR MDR ROAD KM 0.00 TO 2.40 IN MUDALAGI TALUKA OF BELAGAVI DISTRICT UNDER 5054-04-337-0-01-154 MDR ROAD IMPROVEMENTS (APPENDIX-E) FOR 2024-25
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying ...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total int...
Direction and Place Identification Signs with size more than 0.9 m2 size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 mad...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer ston...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading prem...
Tack coat on Granular surface treated with primer - Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. R...
Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading pre...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Road Delineators - Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fit...
Construction of 3 CDs of 1 row 1000 dia NP 3 Pipes at Chainage at selected Chainages 0.25 km, 0.6 km, 1.5 km, 1.7 km
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
ADD 8% For Form Work
---- including cost of all materials, labor ,HOM,l
Construction of 1 CDs of 3 row 1000 dia NP 3 Pipes at Chainages 2.1 km
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
ADD 8% For Form Work
---- including cost of all materials, labor ,HOM,l
MEASUREMENT SHEET FOR ROAD MAINTENANCE
Road Maintenance for 3rd year for road with BM+SDBC as wearing coat
Maintenance of Road for 3rd year by Cleaning and Uprooting Vegetation on either sides of the road Maintenance of surface drains by c...
Road Maintenance for 4th year for road with BM-SDBC as wearing coat
Maintenance of Road for 4th year by Clearing and Uprooting Vegetation on either sides of the road. Maintenance of surface drains by ...
Road Maintenance for 5th year with BM+SDBC coat as wearing coat
Maintenance of Road for 5th year by Clearing and Uprooting Vegetation on either sides of the road.Maintenance of surface drains by clear...
ELECTRICAL ESTIMATE
PSC Pole - 9 Mtrs Long, 200 kg WL (As per HESCOM SR2023-24.Page No 347 Sl No6 I No.1.06, Rs 4199,)
---- including cost of all materials, labor ,HOM,l
PSC Pole - 9 Mtrs Long, 200 kg WL (LabourCharges Rs 1113+629=1472 As per HESCOM SR 2023-24. Page No 388 Sl No.30,I No2.02 &Page No 387 Sl No1, I No 1.1.1.)
---- including cost of all materials, labor...
Relising & Re-fixing PSC Pole - 9 Mtrs Long, 200 kg WL (As per HESCOM SR 2023-24. Labour Charges Rs 1113+629=1472*1.9 As per HESCOM SR 2023-24. Page No 388 Sl No.30,I No2.02 &Page No 387 Sl No1, I No ...
Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for PSC poles,( As per HESCOM SR 2023-24. Page No 341 Sl No 9, Rs 643.00,)
---- including cost of all materials, labor ,HOM,l
Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for PSC poles,( Labour Charges Rs 272 As per HESCOM SR 2023-24. Page No 341 Sl No 9)
---- including cost of all materials, la...
HT Hight Angle (3*Horizontal) ( As per HESCOM SR 2023-24. Page No 341 Sl No 9, Rs 643.00*3=1929, )
---- including cost of all materials, labor ,HOM,l
HT Hight Angle (3*Horizontal) ( As per HESCOM SR 2023-24. Labour Charges Rs 272*3=816 As per HESCOM SR 2023-24. Page No 341 Sl No 9)
---- including cost of all materials, labor ,HOM,l
DP Structure with 9 Mtrs RCC Poles,(As per HESCOM SR 2023-24. Page No 339 Sl Ni 4(a), Rs 20928.00,)
---- including cost of all materials, labor ,HOM,l
DP Structure with 9 Mtrs RCC Poles,(Labour Charges Rs 5392.00 As per HESCOM SR 2023-24.Page No 339 Sl ni 4(a))
---- including cost of all materials, labor ,HOM,l
Releasing & refixing of DP Structure without Poles Labour Charges Rs 5392.00-1742.00-1742.00=1908*1.9=3625 As per HESCOM SR 2023-24.Page No 339 Sl ni 4(a))
---- including cost of all materials, labor...
11 kV Pin Insulators (Polymeric type),As per HESCOM SR 2023-24. Page No 349 Sl No 52 I No 6.06, RS 205.00)
---- including cost of all materials, labor ,HOM,l
45 kN Disc Insulators (Polymeric type),( As per HESCOM SR 2023-24. Page No 349 Sl No 56 I No 6.10, RS 186.00)
---- including cost of all materials, labor ,HOM,l
HT Guy Set Complete,(As per HESCOM SR 2023-24. Page No 344 Sl No24(a), RS 1170.00,) ---- including cost of all materials, labor ,HOM,l
HT Guy Set Complete,(Labour Charges RS 593.00 As per HESCOM SR 2023-24. Page No 344 Sl No.24(a))
---- including cost of all materials, labor ,HOM,l
Rabbit ACSR Conductor, (As per HESCOM SR 2023-24.Page No 359 Sl No 59, I No 7.02 RS 58573.00, ) ---- including cost of all materials, labor ,HOM,l
Rabbit ACSR Conductor, (Labour Charges RS 4361.00 As per HESCOM SR 2023-24.Page No 390 Sl No. 65, I No 6.02)
---- including cost of all materials, labor ,HOM,l
Releasing & Restringing of Rabbit ACSR Conductor, (Labour Charges RS 4361*1.90=8285.90.00 As per HESCOM SR 2023-24 Page No 390 Dl No.65, I No 6.02))
---- including cost of all materials, labor ,HOM,l
Releasing & Restringing of Rabbit ACSR Conductor, (Labour Charges RS 4361*1.90=8285.90.00 As per HESCOM SR 2023-24 Page No 390 Dl No.65, I No 6.02))
---- including cost of all materials, labor ,HOM,l
Releasing and re-erection of 25kVA & 63KVA Distribution Transformer.(Laboure Charges RS1193*1.90=2266.70 As per HESCOM SR 2023-24.page no.390,SI No.72.I NO.8.01)
---- including cost of all materials,...
Releasing & refixing of H Frame for mounting 11KVA, 200Amps, Single Break GOS.(As per HESCOM SR 2023-24,page No 355 si No.166,I No24.01,RS 9450.00.Labour Charges RS 1104.00 As HESCOM SR 2023-24 Page N...
PSC Pole - 9 Mtrs Long, 200 kg WL (for Intermediate Poles) (As Per HESCOM SR 2023-24 Page No:399 Sl No.2 )
---- including cost of all materials, labor ,HOM,l
PSC Pole - 9 Mtrs Long, 200 kg WL (for Intermediate Poles) (As Per HESCOM SR 2023-24 Page No:399 Sl No.2 (b) Labour Charge RS 1742.00)
---- including cost of all materials, labor ,HOM,l
Release & Re-Fixing PSC Pole - 8 Mtrs Long, 200 kg WL. (As Per HESCOM SR 2023-24 Page No:399 Sl No.2 (e) Labour Charge RS 1425.00)
---- including cost of all materials, labor ,HOM,l
Weasel ACSR Conductor,(As per HESCOM SR 2023-24. Page No 349 Sl No.58 I No 7.01 , )
---- including cost of all materials, labor ,HOM,l
Weasel ACSR Conductor,(Labour Charges RS 3180.00 As Per HESCOM SR 2023-24. Page NO 390 Sl No64, I No 6.01)
---- including cost of all materials, labor ,HOM,l
Releasing & Restringing of Weasel ACSR Conductor, ( Labour Charges Rs 3180*1.90=6042 As per HESCOM SR 2023-24. Page No 390 Sl No. 64, I No 6.01)
---- including cost of all materials, labor ,HOM,l
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .