18 Mar 2026, 5:30 pmClosed
Executive Engineer Central Mumbai Electrical Divis
Executive Engineer Central Mumbai Electrical Division Sadhana House 2nd floor, Pandurang Budhkar marg, Behind Mahindra Tower, Worli, Mumbai -18.Telephone 022 4564 6881
Providing Installation of IOT Device / Smart Optimizer at various Departments in Grant Medical College, Sir J. J. Group of Hospitals compound, Byculla, Mumbai
2026_PWDM_1285992_1
Quatation/23/25-26/02/IOT
Open Tender
Electrical Works
Item Rate
90 days
Hospital Subdivision
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Mar 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
Load Survey, Site preparation, design, supply, testing, installation and commissioning of air cooled 1 Phase 10 KVA: 40 A, IOT Device / Smart Optimizer with in built solid state stabilizer & SPD, wall mounting system not extending more than 120 mm from the wall, length not extending more than 550 mm & height not extending more than 550 mm, With support for reliable wifi network for pre diagnosis of critical electrical events with automated notifications and automating the critical tasks of electrical safety monitoring and management, automatic voltage optimization, cloud based storage and retrieval of 16 types of electrical issues viz. Risk of arcing. Short Circuit, Over current, Earth leakage, Earth to Neutral voltage, Over voltage, Under voltage,Phase Neutral reversal,Voltage harmonics, Voltage variation, Voltage unbalanced, Current harmonics, Loads with low power factor, Loads with high harmonics, Loads with high inrush, Unbalanced or asymmetric loads, Short term Interruptions of supply, Reverse current, Current unbalance meeting the mandate of IOT based automated real time smart audits, in addition over the air configurable optional automatic isolation for 10 types of electrical events, with backlit LCD display, measuring parameters in electrical safety, power quality, energy efficiency audits and display Voltage, current, KW, kVA. PF, earth voltage, carth leakage current for 1 phase 2 wire system complete with internal wiring connections and mounting hardware for provided Smart Optimizer devices along with Remote monitoring and Proactive command centre support for one year that will call electrician to guide them on correction of Faults and Warnings based on a root cause analysis and criticality level and Comprehensive Maintenance Contract (CMC) of IOT Device / Smart Optimizer for first year.
Load Survey, Site preparation, design, supply, testing, installation and commissioning of air cooled 3 Phase 15 KVA: 20 A per phase, IOT Device / Smart Optimizer with in built solid state stabilizer & SPD, wall mounting system not extending more than 180 mm from the wall, length not extending more than 550 mm & height not extending more than 600 mm, With support for reliable wifi network for pre diagnosis of critical electrical events with automated notifications and automating the critical tasks of electrical safety monitoring and management, automatic voltage optimization, cloud based storage and retrieval of 20 types of electrical issues viz. Risk of arcing, Short Circuit, Over current, Earth leakage, Earth to Neutral voltage, Over voltage, Under voltage, Surge, Phase loss, Phase reversal, Loss of supply to neutral, Voltage harmonics, Voltage variation, Voltage unbalanced, Current harmonics, Loads with low power factor, Loads with high harmonics, Loads with high inrush, Unbalanced or asymmetric loads, Short term Interruptions of supply, Reverse current, Current unbalance meeting the mandate of IOT audits, in addition over the air configurable optional automatic isolation for 12 types of electrical events, with backlit LCD display, measuring parameters in electrical safety, power quality, energy efficiency audits and display Voltage, current, KW, kVA, PF, earth voltage, earth leakage current for 3 phase 4 wire system complete with internal wiring connections and mounting hardware for provided Smart Optimizer devices along with Remote monitoring and Proactive command centre support for one year that will call electrician to guide them on correction of Faults and Warnings based on a root cause analysis and criticality level and Comprehensive Maintenance Contract (CMC) of IOT Device / Smart Optimizer for first year.
Load Survey, Site preparation, design, supply, testing, installation and commissioning of air cooled 3 Phase 30 KVA: 40 A per phase, IOT Device / Smart Optimizer with in built solid state stabilizer & SPD, wall mounting system not extending more than 180 mm from the wall, length not extending more than 650 mm & height not extending more than 700 mm, With support for reliable wifi network for pre diagnosis of critical electrical events with automated notifications and automating the critical tasks of electrical safety monitoring and management, automatic voltage optimization, cloud based storage and retrieval of 20 types of electrical issues viz. Risk of arcing, Short Circuit, Over current, Earth leakage, Earth to Neutral voltage, Over voltage, Under voltage, Surge, Phase loss, Phase reversal, Loss of supply to neutral, Voltage harmonics, Voltage variation, Voltage unbalanced, Current harmonics, Loads with low power factor, Loads with high harmonics, Loads with high inrush, Unbalanced or asymmetric loads, Short term Interruptions of supply, Reverse current, Current unbalance meeting the mandate of IOT audits, in addition over the air configurable optional automatic isolation for 12 types of electrical events, with backlit LCD display, measuring parameters in electrical safety, power quality, energy efficiency audits and display Voltage, current, KW, kVA, PF, earth voltage, earth leakage current for 3 phase 4 wire system complete with internal wiring connections and mounting hardware for provided Smart Optimizer devices along with Remote monitoring and Proactive command centre support for one year that will call electrician to guide them on correction of Faults and Warnings based on a root cause analysis and criticality level and Comprehensive Maintenance Contract (CMC) of IOT Device / Smart Optimizer for first year
Supplying, Erecting & Configuring 4G wireless Dongle datacard for Wifi Hotspot with Min. 4 Hrs. battery backup with Sim Card and Sim-card slot supporting all networks duly connected with electric supply flexible cord of min. 1 m length and in-built power adapter to provided plug point duly erected in suitable PVC box complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2211417.xls
BOQ • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .