Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.6 L
EMD Value
₹28,700
Closing Date
17 Nov 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Chief Officer
Municipal Council Barshi
Asphalting of internal roads in Block No. 146, Ward No. 6, Barshi City
2026_DMA_1351887_1
202627_BNP_CED_Notice_16_08
Open Tender
Civil Works
Percentage
180 days
Barshi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹28,700
5 Nov 2026
5 Nov 2026
18 Nov 2026
5 Nov 2026
17 Nov 2026
5 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 m and spreading for embankment or stacking as directed. | 578.7 | Cubic Metre | 124.85 | ₹72,250.7 |
| 2 | Disposal of excavated material including loading,unloading,stacking the material as directed by Engineer-in-charge or otherwise contractor do its own arrangement for disposal etc complete for all leads and lifts etc. complete.(PWD SSR 2022-23 Lead 2Km. Page no.559). | 578.7 | Cubic Metre | 213.3 | ₹1,23,436.71 |
| 3 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50 metre including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97% of standard proctor density etc. complete (Material obtained from Other sources). | 434.01 | Cubic Metre | 997.4 | ₹4,32,881.57 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means Grading-I (Using Screening Type B (11.2 mm) Aggregate) | 2 | Cubic Metre | 2,718.45 | ₹5,436.9 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) | 2 | Cubic Metre | 2,718.45 | ₹5,436.9 |
| 6 | Providing and applying primer coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/Square Metre using mechanical means. | 964.53 | Square Metre | 34.6 | ₹33,372.74 |
| 7 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 100% crusher broken metal with conical crusher plant, heating and spraying the bitumen of VG-30 grade @ 2 Kg/sqm, spreading 12 mm. size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete including picking of existing WBM surface. | 964.53 | Square Metre | 336.2 | ₹3,24,274.99 |
| 8 | Providing and applying tack coat on the prepared surface heating by flames in boiler and spraying bitumen with sprayer on dry/hungry B.T. surface at 3.00 Kg /10 Square Metre using VG-30 grade bulk bitumen. | 964.53 | Square Metre | 22.05 | ₹21,267.89 |
| 9 | Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with Vehicle Tracking System, laid over a previously prepared surface, finished to the required grade, level, alignment and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.3% VG-30 Bitumen using Batch mix type hot mix plant with SCADA, Sensor Paver, vibratory roller. | 62.67 | Cubic Metre | 8,437 | ₹5,28,746.79 |
| 10 | Providing and laying Bituminious Concrete using crushed aggregate of grading 1, premixed with bituminious binder of dose 5.40 percent by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment and rolling to achieve the desired density for 50 mm compacted thickness with Drum Mix type hot mix plant with SCADA, Sensor Paver and Vibratory Roller excluding prime/Tack coat etc. complete with Bitumen VG-30 grade with stone dust filler. | 28.91 | Cubic Metre | 11,614.25 | ₹3,35,767.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
AffidavitAndParishishtaA.pdf
Other Document • 0.29 MB
TCTarRoad.PDF
Additional Documents • 0.56 MB
BOQ_2307883.xls
BOQ • 0.32 MB
B8.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .