| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Single Bidder |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
24 Mar 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2026_DOA_158081_5
DSWC/SGR/2025-26/28
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹2.6 L
20 May 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
FINANCIAL BID NO.: DSWC/SGR/2025-26/28
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Chotian (C/o 9037/L), Tehsil Lehra and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 6272.175 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 4595 /Mtrs 76 Rupee Seventy Six Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1838 /Joints 160.82 Rupees One Hundred Sixty and Eighty two Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (350mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 32 /Cut hole 95 Rupees Ninty Five Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 18 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 32 /Riser & Valve 569.29 Rupees Five hundred Sixty Nine and Twenty Nine Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 18 /Air pipe 255.14 Rupees Two Hundred Fifty five and Fourteen Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
1 Earth work in Excavation 9.5 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.71 cum 3659.85 Rupees Three Thousand Six Hundred Fifty nine and Eighty five Paise Only
3 Plain Cement Concrete 1:2:4 0.22 cum 4859.88 Rupees Four Thousand Eight hundred Fifty Nine and Eighty Eight Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.78 cum 4785.12 Rupees Four Thousand Seven Hundred Eighty five and Twelve Paise Only
5 12.5 mm thick cement plaster work 1:4 25.99 cum 375.07 Rupees Three Hundred seventy five Only
Total Cost for ONE Haudi
Total Cost for Four No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
2 Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
3 Fixing of gate valve (350 mm) 10 each 1735.28 Rupees One Thousand Seven Hundred Thirty Four and Nineteen Paise Only
4 Nimar for jointing the pipe 169.096 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 400.464 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Chotian (C/o 5936/L), Tehsil Lehra and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5326.23 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3902 /Mtrs 76 Rupee Seventy Six Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1561 /Joints 160.82 Rupees One Hundred Sixty and Eighty two Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (350mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 40 /Cut hole 95 Rupees Ninty Five Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 16 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 40 /Riser & Valve 569.29 Rupees Five hundred Sixty Nine and Twenty Nine Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 16 /Air pipe 255.14 Rupees Two Hundred Fifty five and Fourteen Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
1 Earth work in Excavation 9.5 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.71 cum 3659.85 Rupees Three Thousand Six Hundred Fifty nine and Eighty five Paise Only
3 Plain Cement Concrete 1:2:4 0.22 cum 4859.88 Rupees Four Thousand Eight hundred Fifty Nine and Eighty Eight Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.78 cum 4785.12 Rupees Four Thousand Seven Hundred Eighty five and Twelve Paise Only
5 12.5 mm thick cement plaster work 1:4 25.99 cum 375.07 Rupees Three Hundred seventy five Only
Total Cost for ONE Haudi
Total Cost for Four No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
2 Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
3 Fixing of gate valve (350 mm) 4 each 1735.28 Rupees One Thousand Seven Hundred Thirty Four and Nineteen Paise Only
4 Nimar for jointing the pipe 143.612 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 341 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Total (C) 74530
Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 0
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
Grand Total (A+B+C) 1301644
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Ballaran (C/o 12020/L), Tehsil Lehra and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 11731.5 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 7900 /Mtrs 71 Rupee Seventy One Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 3160 /Joints 209.47 Rupees Two Hundred Nine and Fouty seven Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 78 /Cut hole 105 Rupees One Hundred Five Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 26 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 78 /Riser & Valve 717.09 Rupees Seven hundred Seventeen and Nine Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 26 /Air pipe Rupees Two Hundred Ninty two and Fifteen Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
1 Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.6 cum 3277.31 Rupees Three Thousand Two Hundred Seventy seven and Thirty One Paise Only
3 Plain Cement Concrete 1:2:4 0.144 cum 3474.2 Rupees Three Thousand Four hundred Seventy four and Twenty Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.75 cum 4267.2 Rupees Four Thousand Two Hundred Sixty seven and Twenty Paise Only
5 12.5 mm thick cement plaster work 1:4 15.32 cum 182.62 Rupees Onw hundred Eighty two and sixty two paisa only
6 R.C.C SLAB 1:2:4 0.21 CUM 6714.52 Rupess Six thousand Seven Hundred Fouteen and Fifty two paisa only
7 FOOTREST 6 NOS 100 Rupees One humdred Only
Total Cost for ONE Haudi
Total Cost for Five No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
2 Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
3 Fixing of gate valve (400 mm) 15 each 2062.09 Rupees Two Thousand Sixty two and Nine Paise Only
4 Nimar for jointing the pipe 436.08 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 780.556 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Moonak, (C/o 34408/L),Moonak Branch, rajwaha-Ladbanjara,Tehsil Moonak and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 7349.625 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of 500 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 4170 /Mtrs 71 Rupee Seventy One Only
3 Jointing of class N.P.2 500 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 301.02 Rupees Three Hundred One and Two Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (500mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 29 /Cut hole 127 Rupees One hundred Twenty Seven Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 18 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500mm) 29 /Riser & Valve 906 Rupees Nine hundred Six Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 18 /Air pipe Rupees Two Hundred Ninty One and Eighty Four Paise Only
Estimate of Charges for Haudi (1.5 X 1.5 X 2.75 m)
1 Earth work in Excavation 9.5 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.71 cum 3659.85 Rupees Three Thousand Six Hundred Fifty nine and Eighty five Paise Only
3 Plain Cement Concrete 1:2:4 0.225 cum 4859.88 Rupees Four Thousand Eight hundred Fifty Nine and Eighty Eight Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.8 cum 4785.12 Rupees Four Thousand Seven Hundred Eighty five and Twelve Paise Only
5 12.5 mm thick cement plaster work 1:4 26.01 cum 375.07 Rupees Three Hundred seventy five Only
Total Cost for ONE Haudi
Total Cost for Three No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
2 Sign Board (5' X 3') 1 each 3000 Rupees Three Thousand Only
3 Fixing of gate valve (500 mm) 10 each 2289.37 Rupees Two Thousand Two Hundred Eighty Nine and Thirty seven Paise Only
4 Nimar for jointing the pipe 352.282 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 642.906 per tonnes 209.86 Rupees Two Hundred Nine and Eighty Six paise only
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Wajidpur & Moonak (C/o 47306/TL),Moonak Branch, Rajwaha-Ladbanjara,Tehsil Lehra and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 10851.4 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of 450 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 6740 /Mtrs 71 Rupee Seventy One Only
3 Jointing of class N.P.2 450 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2696 /Joints 235.78 Rupees Two Hundred Thirty Five and Seventy Eight Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (450mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 51 /Cut hole 116 Rupees One hundred Sixteen Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 27 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 51 /Riser & Valve 771.32 Rupees Seven hundred Seventy One and Thirty Two Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 27 /Air pipe 290.02 Rupees Two Hundred Ninty and Two Paise Only
Estimate of Charges for Haudi (1.5 X 1.5 X 2.75 m)
1 Earth work in Excavation 9.5 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.71 cum 3659.85 Rupees Three Thousand Six Hundred Fifty nine and Eighty five Paise Only
3 Plain Cement Concrete 1:2:4 0.225 cum 4859.88 Rupees Four Thousand Eight hundred Fifty Nine and Eighty Eight Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.78 cum 4785.12 Rupees Four Thousand Seven Hundred Eighty five and Twelve Paise Only
5 12.5 mm thick cement plaster work 1:4 25.99 cum 375.07 Rupees Three Hundred seventy five Only
Total Cost for ONE Haudi
Total Cost for Three No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4500 Rupees Four Thousand Only
2 Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
3 Fixing of gate valve (450 mm) 11 each 1730.18 Rupees One Thousand Seven Hundred thirty and Eighteen Paise Only
4 Nimar for jointing the pipe 413.027 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 811.156 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Moonak & Wajidpur (C/o 43735/R),Moonak Branch, rajwaha-Ladbanjara,Tehsil Lehra and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 10714.275 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of 400 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 7215 /Mtrs 71 Rupee Seventy One Only
3 Jointing of class N.P.2 400 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2886 /Joints 209.19 Rupees Two Hundred Nine and Seventy three Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 76 /Cut hole 105 Rupees One hundred Five Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 35 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 76 /Riser & Valve 714.79 Rupees Seven hundred Fourteen and Seventy Nine Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 35 /Air pipe Rupees Two Hundred Ninty One and Fifteen Paise Only
Estimate of Charges for Haudi (1.5 X 1.5 X 2.75 m)
1 Earth work in Excavation 9.5 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.71 cum 3659.85 Rupees Three Thousand Six Hundred Fifty nine and Eighty five Paise Only
3 Plain Cement Concrete 1:2:4 0.225 cum 4859.88 Rupees Four Thousand Eight hundred Fifty Nine and Eighty Eight Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.8 cum 4785.12 Rupees Four Thousand Seven Hundred Eighty five and Twelve Paise Only
5 12.5 mm thick cement plaster work 1:4 26.01 cum 375.07 Rupees Three Hundred seventy five Only
Total Cost for ONE Haudi
Total Cost for FIve No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
2 Sign Board (5' X 3') 1 each 3000 Rupees Four Thousand Only
3 Fixing of gate valve (400 mm) 14 each 2059.79 Rupees Two Thousand Fifty Nine and Seventy Nine Paise Only
4 Nimar for jointing the pipe 398.268 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 713.456 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Anndana (C/o 8624/L), Tehsil Moonak and District- Sangrur.
S. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1971 /Mtrs 71 Rupee Seventy One Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 789 /Joints 209.19 Rupees Two Hundred Nine and Nineteen Paise Only
4 Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 21 /Cut hole 105 Rupees One Hundred Five Only
6 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 11 /Cut hole 41 Rupees Forty One Only
7 Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 21 /Riser & Valve 714.78 Rupees Seven hundred Fourteen and Ninty three Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 11 /Air pipe Rupees Two Hundred Fifty Nine and Fifteen Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
1 Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
2 B.B.C 1:8:16 0.6 cum 3845.78 Rupees Three Thousand Eight Hundred Fourty Five and SeventyEight Paise Only
3 Plain Cement Concrete 1:2:4 0.144 cum Rupees Four Thousand One hundred Five and Ten Paise Only
4 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.75 cum 4767.2 Rupees Four Thousand Seven Hundred Sixty seven and Twenty Paise Only
5 12.5 mm thick cement plaster work 1:4 15.32 cum 208.7 Rupees Two hundred Eight and seventy paisa only
6 R.C.C SLAB 1:2:4 0.21 CUM 8160.92 Rupess Eight thousand One Hundred Sixty and Ninty two paisa only
7 FOOTREST 6 NOS 100 Rupees One humdred Only
Total Cost for ONE Haudi
Total Cost for TWO No. Haudi's (B)
Cost of Other Items
1 Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
2 Sign Board (5' X 3') 1 each 3000 Rupees Three Thousand Only
3 Fixing of gate valve (400 mm) 9 each 2059.79 Rupees Two Thousand Fifty Nine and Seventy Nine Paise Only
4 Nimar for jointing the pipe 108.882 Per kg 60 Rupees Sixty Only
5 Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 195.2 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (A+B+C)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DNITUGPL252628.pdf
Tender Documents • 1.16 MB
FBUGPL252628.xls
Additional Documents • 0.09 MB
NITUGPL252628.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid