| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹61.5 LAccepted-AOC NO 5 6 ERI KODI STREET SANJEEVIRAYANPETTAI IST STREET TINDIVANAM | VILLUPURAM | TAMIL NADU | 604001 | ₹61.5 L | 1 | Accepted-AOC Accepted-Finance |
| 2 | 2₹64.2 L+₹2.7 L (4.45%)Rejected-Finance | ₹64.2 L+₹2.7 L (4.45%) | 2 | Rejected-Finance highest rate |
| Sl No | Description | Qty | Unit | SAIRAM CONSTRUCTIONS L1 | SVSK and Co L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney eafth and eafth mixed with small size boulders SS.20B | 699 | 1 cum (One cubic meter) | 100 ₹69,900 Lowest | 150 ₹1,04,850 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 699 | 1 cum (One cubic meter) | 2,323.83 ₹16,24,357.17 Lowest | 2,500 ₹17,47,500 |
| 3.00 | Providing and laying of prime coat using bitumen emulsion (SSI RC Drum) at the rate of 7 kg per 10sqm over the WMM surface preparatory to another construction over it. as per as per standar specification MORTH V | 4,658.5 | 1 Sqm (One square meter) | 75.16 ₹3,50,132.86 Lowest | 100 ₹4,65,850 |
| 4.00 | Providing and laying of tack coat using Bitumen Emulsion (RS1) at the rate of 2.5 kg per 10sqm over the WMM primed surface preparatory to another construction over it.as per as per standar specification MORTH V | 4,658.5 | 1 Sqm (One square meter) | 17.49 ₹81,477.16 Lowest | 17.49 ₹81,477.16 Lowest |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 233 | 1 cum (One cubic meter) | 10,344.14 ₹24,10,184.62 Lowest | 10,344.14 ₹24,10,184.62 Lowest |
| 6.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs 5.03 shedule of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 140 | 1 cum (One cubic meter) | 10,933.68 ₹15,30,715.2 Lowest | 10,933.68 ₹15,30,715.2 Lowest |
| 7.00 | Providing and Laying of Hot applied Thermoplastic Compound of 2.5mm thick including refllectorising glass beads @ 250grams per sqm area thickness of 2.5mm is exclusive of surface applied glass beads per IRC:35 the Finished surface to be level,uniform and free from steaks and holes etc, Complete as per MORTH Specification NO.803 (ROAD EDGE PAINTING) | 92 | 1 Sqm (One square meter) | 891 ₹81,972 Lowest | 891 ₹81,972 Lowest |
Tender Value
₹74.5 L
EMD Value
₹74,500
Closing Date
22 Feb 2023, 3:00 pmClosed
Executive Officer, Gingee Town Panchayat
Executive Officer, Gingee Town Panchayat
Strengthening of B.T Road at Sakkarapuram Kulakkarai street, Muthu Barathi street and VPN Nagar in Gingee Town Panchayat.
2023_DTP_288494_1
384/2022/A1
Open Tender
Civil Works - Roads
Works
180 days
Gingee Town Panchayat
As Per Tender Notice
3 documents required · 3 mandatory
₹16,875
Yes
Executive Officer, Town Panchayat, Gingee
₹74,500
18 Aug 2025
14 Feb 2023
23 Feb 2023
14 Feb 2023
22 Feb 2023
14 Feb 2023
14 Feb 2023 - 22 Feb 2023
Amount
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney eafth and eafth mixed with small size boulders SS.20B
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying of prime coat using bitumen emulsion (SSI RC Drum) at the rate of 7 kg per 10sqm over the WMM surface preparatory to another construction over it. as per as per standar specification MORTH V
Providing and laying of tack coat using Bitumen Emulsion (RS1) at the rate of 2.5 kg per 10sqm over the WMM primed surface preparatory to another construction over it.as per as per standar specification MORTH V
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs 5.03 shedule of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and Laying of Hot applied Thermoplastic Compound of 2.5mm thick including refllectorising glass beads @ 250grams per sqm area thickness of 2.5mm is exclusive of surface applied glass beads per IRC:35 the Finished surface to be level,uniform and free from steaks and holes etc, Complete as per MORTH Specification NO.803 (ROAD EDGE PAINTING)
SVSK and Co
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .