Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 7 3 PUDUMARAPPANUR ARIYUR POST NAMAKKAL 637 015 TAMIL NADU | NAMAKKAL | TAMIL NADU | 637015 | ₹1.4 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC Lowest Tenderer |
| 2 | L2₹1.6 CrRejected-AOC NEW NO 3 19 CHANDRAGIRI ARASANATHAM POST VALAYAPATTI NAMAKKAL 637020 | NAMAKKAL | TAMIL NADU | 637020 | ₹1.6 Cr | L2 | Rejected-AOC Second Lowest Tenderer |
| Sl No | Description | Qty | Unit | SRI NAACHIMAAR ENGINEERING CONSTRUCTIONS L1 | MMR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Brick masonry Cement Mortar 1:4 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram | |||||
| 1.01 | Kalkaram up to 15' 0" | 1,765.41 | Cft | 332 ₹5.9 L | 350 ₹6.2 L |
| 1.02 | Vimanam / Gopuram of height up to 25' 0" (Excluding Kalkaram) | 790.6 | Cft | 440 ₹3.5 L | 460 ₹3.6 L |
| 2.00Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Cement Mortar1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram | |||||
| 2.01 | For Kalkaram (0'0''-15' 0" ) | 10,437.52 | Sft | 303 ₹31.6 L | 320 ₹33.4 L |
| 2.02 | (C) Vimanam / gopuram of ht. Up to 25'0" excluding Kalkaram | 10,304.18 | Sft | 506 ₹52.1 L | 530 ₹54.6 L |
| 3.00Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. | |||||
| 3.01 | Up to 15' ht. | 8,977.95 | Sqm | 296 ₹26.6 L | 310 ₹27.8 L |
| 4.00Providing Single Nosing to the 18mm to 20mm thick Granite Slab (One edge erased) at required location such as steps, Table top edges, wash basin recaused portin and sitting benches, The rate includes all labour, Tools involved etc complete in all Floors. | |||||
| 4.01 | Single Nosing | 4,000 | Rm | 205 ₹8.2 L | 215 ₹8.6 L |
Tender Value
₹1.4 Cr
EMD Value
₹82,000
Closing Date
1 Jul 2025, 3:00 pmClosed
Joint Commissioner /Executive officer
Arulmigu Subramaniya Swamy Thirukoil Tiruchendur
Proposal for ornamental Traditional Temple Type Elevation works additionally required for the work Redevelopment of Infrastructure Phase II around Arulmigu Subramaniya swamy Temple Tiruchendur
2025_HRCE_567259_1
2433/2025/A3
Open Tender
Civil Works
180 days
Subramaniya Swamy Temple Tiruchendur
Please refer Tender documents.
12 documents required · 12 mandatory
₹17,700
Yes
₹82,000
16 Mar 2026
12 Jun 2025
1 Jul 2025
13 Jun 2025
1 Jul 2025
13 Jun 2025
Amount
Brick masonry Cement Mortar 1:4 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Kalkaram up to 15' 0"
Vimanam / Gopuram of height up to 25' 0" (Excluding Kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Cement Mortar1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
For Kalkaram (0'0''-15' 0" )
(C) Vimanam / gopuram of ht. Up to 25'0" excluding Kalkaram
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
Up to 15' ht.
Providing Single Nosing to the 18mm to 20mm thick Granite Slab (One edge erased) at required location such as steps, Table top edges, wash basin recaused portin and sitting benches, The rate includes all labour, Tools involved etc complete in all Floors.
Single Nosing
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MMR CONSTRUCTION (BID ID -1380988)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_677282.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid