Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC | ₹22.7 L Quoted ₹19.4 L | L1 | Accepted-AOC LOWEST TENDERER |
| 2 | L2₹21.4 LRejected-AOC 1 90 VADASIRUVALUR VALLIMEDUPETTAI POST TINDIVANAM TALUK VILUPPURAM 604207 | VILLUPURAM | TAMIL NADU | 604207 | ₹21.4 L | L2 | Rejected-AOC SECOND LOWEST TENDERER |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | dharani constructions L2 | Sree Velan & Co L1 |
|---|---|---|---|---|---|
| 1.00ELECTRICALWORK | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150 mm layers well watered, rammed and consolidated including depositing surplus earth within the godown or inside compound in places shown with initial lead of 10 mts and initial lift of 2 mts. Clearing, leveling the site, shoring, strutting, bailing of water wherever necessary etc., complete complying with standard specification and as directed. | 62 | M3 | 200 ₹12,400 Lowest | 235.27 ₹14,586.74 |
| 1.02 | CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including mixing by mechanical means de-watering side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed. | 11.2 | M3 | 4,500 ₹50,400 Lowest | 5,811.7 ₹65,091.04 |
| 1.03 | Supplying and filling in foundation and basement with clean M.SAND in layers of 150mm thick, well watered, rammed and consolidated including watering etc., complete complying with standard specifications and as directed. | 6.5 | M3 | 2,756 ₹17,914 | 2,122.21 ₹13,794.37 Lowest |
| 1.04 | Supplying and filling in foundation with Gravel in layers of not exceeding 150mm thick well watered, rammed and consolidated including watering etc., complete complying with standard specification and as directed. | 233 | M3 | 350 ₹81,550 Lowest | 718.44 ₹1,67,396.52 |
| 1.05 | Supplying and filling in basement with wetmix 250mm thick in layers of not exceeding 250mm thick, well watered, rammed and consolidated including machineries for hire and running charges leader 5 Cum capacity, hire charges for tipper, water sprinkler,` vibratory roller all labour charges etc., complete complying with standard specification and as directed by the departmental officers. | 34.5 | M3 | 2,000 ₹69,000 Lowest | 2,903.87 ₹1,00,183.52 |
| 1.06 | BRICK WORK in cement mortor 1:5(one cement, five sand) using best quality Country bricks of size 8” ¾”x4 ¼ x 2 ¾ “ for walls including cost of scaffolding curing, finishing etc., complete complying with standard specification and as directed by the departmental officers.
In foundation and basement
. | 10.5 | M3 | 7,300 ₹76,650 | 7,132.75 ₹74,893.88 Lowest |
| 1.07 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed. | 11.76 | QTL | 9,200 ₹1,08,192 Lowest | 9,204.23 ₹1,08,241.74 |
| 1.08 | Reinforcement Cement Concrete 1:2:4 ( one cement, two sand, four aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed.
In Foundation and basement
. | 39.25 | M3 | 6,000 ₹2,35,500 Lowest | 9,124.19 ₹3,58,124.46 |
| 1.09 | PLASTERING with cement mortor 1:5 (one cement and five sand) 12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed by the departmental officers. | 353 | M2 | 270 ₹95,310 Lowest | 287.69 ₹1,01,554.57 |
Tender Value
Refer Docs
EMD Value
₹23,100
Closing Date
27 May 2026, 2:00 pmClosed
MANAGING DIRECTOR
Head Office, Koyambedu, Chennai-107
Carrying out Renovation works to TNCSC godown campus at Vanur in Villupuram District
2026_TCSC_677102_1
1/CED6/003253 /2025.
Open Tender
Civil Works
Lump-sum
90 days
VANUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹23,100
13 Jul 2026
14 May 2026
27 May 2026
14 May 2026
27 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ELECTRICALWORK | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150 mm layers well watered, rammed and consolidated including depositing surplus earth within the godown or inside compound in places shown with initial lead of 10 mts and initial lift of 2 mts. Clearing, leveling the site, shoring, strutting, bailing of water wherever necessary etc., complete complying with standard specification and as directed. | 62 | M3 | - | - |
| 1.02 | CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including mixing by mechanical means de-watering side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed. | 11.2 | M3 | - | - |
| 1.03 | Supplying and filling in foundation and basement with clean M.SAND in layers of 150mm thick, well watered, rammed and consolidated including watering etc., complete complying with standard specifications and as directed. | 6.5 | M3 | - | - |
| 1.04 | Supplying and filling in foundation with Gravel in layers of not exceeding 150mm thick well watered, rammed and consolidated including watering etc., complete complying with standard specification and as directed. | 233 | M3 | - | - |
| 1.05 | Supplying and filling in basement with wetmix 250mm thick in layers of not exceeding 250mm thick, well watered, rammed and consolidated including machineries for hire and running charges leader 5 Cum capacity, hire charges for tipper, water sprinkler,` vibratory roller all labour charges etc., complete complying with standard specification and as directed by the departmental officers. | 34.5 | M3 | - | - |
| 1.06 | BRICK WORK in cement mortor 1:5(one cement, five sand) using best quality Country bricks of size 8” ¾”x4 ¼ x 2 ¾ “ for walls including cost of scaffolding curing, finishing etc., complete complying with standard specification and as directed by the departmental officers.
In foundation and basement
. | 10.5 | M3 | - | - |
| 1.07 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed. | 11.76 | QTL | - | - |
| 1.08 | Reinforcement Cement Concrete 1:2:4 ( one cement, two sand, four aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed.
In Foundation and basement
. | 39.25 | M3 | - | - |
| 1.09 | PLASTERING with cement mortor 1:5 (one cement and five sand) 12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed by the departmental officers. | 353 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_813597.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_813597.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].