Loading…
Loading…
Tender Value
₹32.3 L
EMD Value
₹3.2 L
Closing Date
15 Jul 2026, 11:00 am
E.O.
N.P. Ekdil
Construction R.C.C coverd Nala Manoj shop to manish to transformer puliya and crossing culvert on pwd road
2026_DOLBU_1163470_1
272/EN/NPE/2026-27 /10
Open Tender
Civil Works
90 days
N.P. Ekdil
Construction R.C.C coverd Nala Manoj shop to manish to transformer puliya and crossing culvert on pwd road
2 documents required · 2 mandatory
₹3,850
Yes
E.O.
₹3.2 L
Yes
N.P. Ekdil
25 Jun 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | demolishing brick work manually /by mechanical means including stacking of serviceable material and disposal all complete as per dar no15.7.4 | 28.98 | Cum | 768 | ₹22,256.64 |
| 2 | earth work in excavation in foundation in ordinary soil (loam, clay or sand )including lift up to 1.5 meter and lead up to 30 meter all as per sor 251 | 469.2 | Cum | 145 | ₹68,034 |
| 3 | making bandha with empty cement bags filled with earth or local sand for diversion of water all complete as per sor chapter 1 si no 15 | 600 | Nos | 20 | ₹12,000 |
| 4 | providing cast of dewatring with pumping set ,deisel charges including all as per si no 109 chapter 20 313 | 192 | hrs | 313 | ₹60,096 |
| 5 | cement concrete in 1:4:8 cement and coarse sand with approved stone ballast all as per sor no 281 | 49.92 | Cum | 6,000 | ₹2,99,520 |
| 6 | first class brick work in 1:4 cement and coarse sand including supply of all materials ,labour and t&p all as per 303 N.S | 1.68 | Cum | 6,300 | ₹10,584 |
| 7 | 12 mm cement plaster of mix 1:6 cement and c sand asper dsr 13.4.2 | 4.8 | Sqm | 250 | ₹1,200 |
| 8 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).as per dsr 5.3 | 148.29 | Cum | 8,377 | ₹12,42,225.33 |
| 9 | cement concrete with 2cm gauge approved stone ballast approved coarse sand cement in the proportion of 1:2:4 including supply of all material t&petc all as per sor no 279a | 9.12 | Cum | 7,250 | ₹66,120 |
| 10 | supply and fixing of sign board with granite stone | 1 | Nos | 8,000 | ₹8,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_2181133.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid