Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC NEAR BALA SCHOOL MOHALLA CHOUTHIYA KONDAL HATHIN DISTT PALWAL 121103 | HATHIN | PALWAL | HARYANA | 121103 | ₹14.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹14.8 L+₹75,208.39 (5.37%)Rejected-Finance PLOT NO 143 MAHAWAL PATTI DEEGHOT HODAL PALWAL 121105 | HODAL | PALWAL | HARYANA | 121105 | ₹14.8 L+₹75,208.39 (5.37%) | L2 | Rejected-Finance Reject due to higher rate quoted |
| 3 | L3₹15.1 L+₹1.1 L (7.59%)Rejected-Finance | ₹15.1 L+₹1.1 L (7.59%) | L3 | Rejected-Finance Reject due to higher rate quoted |
| 4 | L4₹15.4 L+₹1.4 L (10.3%)Rejected-Finance | ₹15.4 L+₹1.4 L (10.3%) | L4 | Rejected-Finance Reject due to higher rate quoted |
| 5 | L5₹16.0 L+₹2.0 L (14.1%)Rejected-Finance WARD NO 3 KRISHNA COLONY TEH AND DISTT PALWAL 121102 | PALWAL | PALWAL | HARYANA | 121102 | ₹16.0 L+₹2.0 L (14.1%) | L5 | Rejected-Finance Reject due to higher rate quoted |
| Sl No | Description | Qty | Unit | The Pawan Coop L&C Society Ltd. L3 | The Lakshay Coop L and C Society Ltd L10 | THE SACHIN COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L1 | THE ALTMAS COOPERATIVE L C SOCIETY LTD ADBAR L11 | THE SOMSHARADARYA COOP L AND C SOCIETY LTD L6 | THE PARI COOP L&C SOCIETY LTD L7 | THE SHREE SHYAM COOP L AND C SOCIETY LTD L2 | THE SHRI SHYAM SARKAR JI COOP L&C SOCIETY LTD L9 | THE MADHAV COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L5 | The Tanwar Coop L&C Society Limited L4 | THE NIDHI COOP L&C SOCIETY LTD L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Recovery of 80mm thick old Interlocking Paver Blocks/Vibrated/Hydraulic Block completed in all respect | 16,300 | NO. | 4.5 ₹-73,350 | 1 ₹-16,300 Lowest | 10 ₹-1,63,000 | 1 ₹-16,300 Lowest | 4.5 ₹-73,350 | 4.6 ₹-74,980 | 6 ₹-97,800 | 1 ₹-16,300 Lowest | 4.5 ₹-73,350 | 4.5 ₹-73,350 | 7 ₹-1,14,100 |
| 2.00 | EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage | 653.43 | cum | 427 ₹2,79,014.61 | 600 ₹3,92,058 | 350 ₹2,28,700.5 Lowest | 650 ₹4,24,729.5 | 427 ₹2,79,014.61 | 450 ₹2,94,043.5 | 370 ₹2,41,769.1 | 500 ₹3,26,715 | 425 ₹2,77,707.75 | 427 ₹2,79,014.61 | 360 ₹2,35,234.8 |
Tender Value
₹17.4 L
EMD Value
₹28,720
Closing Date
14 May 2026, 5:00 pmClosed
MANOJ KUMAR
Municipal Council Palwal
Construction of IPB street along with drain from Behind DG khan school rawat parking to vishnu chakki and vishnu chakki house to naala ward no. 20 MC Palwal
2026_HRY_519309_1
2026BBAC557D 2A76 43FC 87E1 A70519277CA0294ULB
Open Tender
Civil Works
Works
240 days
Palwal
2 documents required · 2 mandatory
₹2,000
₹28,720
Yes
26 Jun 2026
4 May 2026
15 May 2026
4 May 2026
14 May 2026
4 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Recovery of 80mm thick old Interlocking Paver Blocks/Vibrated/Hydraulic Block completed in all respect | 16,300 | NO. | 4.5 | ₹73,350 |
| 2 | EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage | 653.43 | cum | 427 | ₹2,79,014.61 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_598204.xls
BOQ • 0.31 MB
TT.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .