| 1 | L1₹75.7 LAccepted-AOC | ₹75.7 L Quoted ₹89.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 CrRejected-Finance | ₹1.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.0 CrRejected-Finance | ₹1.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.0 CrRejected-Finance | ₹1.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.0 CrRejected-Finance D NO 50 41 ALAGAR NAGAR 5TH STREET K PUDUR MADURAI 625007 | MADURAI | MADURAI | TAMIL NADU | 625007 | ₹1.0 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M.NATARAJAN L5 | N.CHITRA L3 | S CHELLADURAI CONTRACTOR L7 | V.Balasubramanian L6 | ALAGAPPA CONSTRUCTIONS L2 | A KALIPPAN L4 | S.VIGNESH L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle including cost of clearing away the site with all labour, lead, lift , T&P etc complete. | 250 | M2 | 3.6 ₹900 | 3.6 ₹900 | 5 ₹1,250 | 0.1 ₹25 | 1 ₹250 | 7 ₹1,750 | 2 ₹500 |
| 2.00 | Conducting detailed survey,fixing of location with GPS for coordinates survey, preparation of route map and profile optimising tower spotting using soft ware including all labour cost of survey equipment tools & plants including cutting of small trees whereever necessary as directed by engineer and furnishing required number of soft and hard copies for approval including all crossing drawing etc .(profile role in duplicate and soft copy 2 nos.) | 0.15 | Km | 9,000 ₹1,350 | 9,000 ₹1,350 | 21,000 ₹3,150 | 10,000 ₹1,500 | 21,000 ₹3,150 | 20,000 ₹3,000 | 75,000 ₹11,250 |
| 3.00 | Preparation of route map and supplying of 10 No Ammonia print copies including cost of all materials labour, lead, lift etc., complte. | 10 | Nos | 9,000 ₹90,000 | 9,000 ₹90,000 | 5,000 ₹50,000 | 10,000 ₹1 L | 4,500 ₹45,000 | 4,000 ₹40,000 | 1,500 ₹15,000 |
| 4.00 | Preparing crossing drawing for the telecom line, National Highway, Railways, EHT lines and supplying of 10 Nos Ammonia print for each line crossing including cost of alla material, lead, lift, etc., complte.. | 4 | Nos | 4,500 ₹18,000 | 4,500 ₹18,000 | 5,000 ₹20,000 | 6,000 ₹24,000 | 4,500 ₹18,000 | 4,000 ₹16,000 | 1,500 ₹6,000 |
| 5.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 4 | Loc | 900 ₹3,600 | 900 ₹3,600 | 900 ₹3,600 | 1,300 ₹5,200 | 1,000 ₹4,000 | 1,000 ₹4,000 | 1,500 ₹6,000 |
| 6.00 | Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil . | 671 | M3 | 90 ₹60,390 | 90 ₹60,390 | 210 ₹1.4 L | 956 ₹6.4 L | 250 ₹1.7 L | 200 ₹1.3 L | 200 ₹1.3 L |
| 7.00 | Earthwork excavation in In Soft disintegrated rock not requiring blasting with intial of 10m and lift of 2m | 671 | M3 | 90 ₹60,390 | 90 ₹60,390 | 300 ₹2.0 L | 200 ₹1.3 L | 1 ₹671 | 300 ₹2.0 L | 300 ₹2.0 L |
| 8.00 | Transport of stub and clead,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. DD tower | 1 | Loc | 1,08,000 ₹1.1 L | 1,08,000 ₹1.1 L | 50,000 ₹50,000 | 40,000 ₹40,000 | 20,000 ₹20,000 | 30,000 ₹30,000 | 25,000 ₹25,000 |
| 9.00 | Transport of stub and clead,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. CZ tower | 3 | Loc | 90,000 ₹2.7 L | 90,000 ₹2.7 L | 42,000 ₹1.3 L | 35,000 ₹1.1 L | 20,000 ₹60,000 | 20,000 ₹60,000 | 20,000 ₹60,000 |
| 10.00 | PCC 1:3:6 using 40mm metal for foundation for tower concrete with out form work including cost of all materials, lead, lift , etc complete . | 35 | M3 | 4,500 ₹1.6 L | 4,500 ₹1.6 L | 6,000 ₹2.1 L | 5,000 ₹1.8 L | 3,000 ₹1.1 L | 4,000 ₹1.4 L | 5,000 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
28 Jan 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
DCW Supply all materials providing tower foundation 110KV Karaikudi Sivagangai SC feeder Loc 148 149
2026_EB_643879_1
CE/TP SO/MDU Specn.No.012/2025-26
Open Tender
Construction Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
21 May 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
Clearing scrub jungle including cost of clearing away the site with all labour, lead, lift , T&P etc complete.
Conducting detailed survey,fixing of location with GPS for coordinates survey, preparation of route map and profile optimising tower spotting using soft ware including all labour cost of survey equipment tools & plants including cutting of small trees whereever necessary as directed by engineer and furnishing required number of soft and hard copies for approval including all crossing drawing etc .(profile role in duplicate and soft copy 2 nos.)
Preparation of route map and supplying of 10 No Ammonia print copies including cost of all materials labour, lead, lift etc., complte.
Preparing crossing drawing for the telecom line, National Highway, Railways, EHT lines and supplying of 10 Nos Ammonia print for each line crossing including cost of alla material, lead, lift, etc., complte..
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil .
Earthwork excavation in In Soft disintegrated rock not requiring blasting with intial of 10m and lift of 2m
Transport of stub and clead,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. DD tower
Transport of stub and clead,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. CZ tower
PCC 1:3:6 using 40mm metal for foundation for tower concrete with out form work including cost of all materials, lead, lift , etc complete .
PCC 1:2:4 using 20mm metal for foundation for tower concrete with out form work including cost of all materials, lead, lift , etc complete .
RCC 1:1.5:3 using 12-20mm metal for foundation & chimney for tower concrete with form work including cost of all materials, lead, lift , etc complete .
Supplying & Providing MS/RTS steel reinforcement including cost of steel rod reinforcement , binding wire including cost of all materials,labour, lead and lift etc., complete.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Providing pipe type earthing for each tower location including extra excavation in foundation pits of towers for fixing 3m long 25mm dia GI "B" class earthpipe and GI wire 2.40m long with legs on both terminals for connecting the GI pipe with tower leg ,refilling with excavated earth mixed with solt and charcoal as per standard specification including all cost of 25 mm GI B class pipe as per IS fabrication of legs for connection arrangement materials,transport, all labours, leads, lifts etc complete.
Erection of GI tower angles including cost of T &P,labour, lead, lift etc complete.as per approved drawing and specification .
Labour charges for hoisting of 7 units of 90 KN single suspension Disc insulators with necessary hardware fittings for panther and U bolt without PA Rod including all cost of labour,lead, lift, T & P etc complete.
Labour charges for hoisting of 8 units of 120 KN single Tension Disc insulators with necessary hardware fittings for panther including all cost of labour,lead, lift, T & P etc complete.
Labour charges for stringing of 3 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects .
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45 cm including all cost of materials,labour, lead lift etc complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Supplying and fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete.
Supplying and fixing of Bird Flappers including all cost of materials,labour transport,lead, lift,etc complete
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete .
Providing temporary guys wherever necessary including excavation, burying out of anchor for stay wire, tightening, dismantling the same after completion of works including cost of all materials,lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Labour charges for removal Large tree
Labour charges for removal Small tree
Releasing and lowering of existing 3 nos panther conductor and restringing the conductor with required sag into the newly erected tower including all labour lead, lift T & P etc complete (under LC )
Releasing and lowering of existing 1 no opgw and restringing with required sag into the newly erected tower including all labour lead, lift T & P etc complete.(under LC )
Providing trussels for major and minor road crossing including cost of all materials, labour, lead lift etc. Complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load including cost of labour, lead lift etc. Complete.
Supply of MS Tower Parts with Stub & Cleat for various type of normal, extension tower parts and tower body/leg extensions (complete excluding bolts and nuts) and including fabrication, Galvanising, transport charges, all taxes etc.
Supply of Hot dipped GI bolts & nuts including step bolts and electro-galvanised spring Washers as per relevant latest IS for towers, extensions, stubs including transport charges and all Taxes etc complete
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. ACSR Panther Conductor
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. OPGW - 48 Fibre with all allied accesseries including Erection charges, testing and commissioning
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. 90 KN ordinary disc insulators
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. 120 KN ordinary Disc insulators
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Single Suspension fitting for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Single Tension fitting for Panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. SB damber for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Number Plate
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Phase plate ( Set of Three )
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. DANGER BOARD
Supply of Bird Flappers as following Technical Specification and all accessotries etc, Complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_771539.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid