| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical technically disqualified |
| 3 | Rejected-Technical WARD NO 06 VILLAGE SATWAS DISTRICT DEWAS MADHYA PRADESH | DEWAS | MADHYA PRADESH | 455001 | - | - | Rejected-Technical technically disqualified |
| Sl No | Description | Qty | Unit | S K ELECTRICAL WORKS L1 |
|---|---|---|---|---|
| 1.00 | 1.Design and build sewage treatment plant of installed capacity 0.50 MLD and all appurtenant structures and allied works;
2.Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about DI-K-7 class pipe of 200, 150 mm diameter having total length of 1771 m from Sump well to STP for 1nos intermediate pumping stations
3.Construction of Interception Diversion Structure.
4.Reuse plan: - 1.0 RCC Sump Capacity-50Kl with Pump And 100 mm Dia DI-K7 Pipe Length-150 with Allied Work
5.Plantation work both side of nalla And STP Campus with allied works.
6.Establishment of Providing and laying of HT Feeder Connection up to Sewerage Treatment Plant/ Pumping Station (For 1.0 KM)
7.Establishment of Online Control Monitoring System OCMS. | 1 | Lump-Sum | 2,30,62,587 ₹2,30,62,587 Lowest |
| 2.00 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 6,00,000 ₹6,00,000 Lowest |
| 3.00 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 6,89,000 ₹6,89,000 Lowest |
| 4.00 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 7,30,340 ₹7,30,340 Lowest |
| 5.00 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 7,74,181 ₹7,74,181 Lowest |
| 6.00 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 8,20,632 ₹8,20,632 Lowest |
| 7.00 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 8,69,870 ₹8,69,870 Lowest |
| 8.00 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 9,22,063 ₹9,22,063 Lowest |
| 9.00 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 9,77,387 ₹9,77,387 Lowest |
| 10.00 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 10,36,031 ₹10,36,031 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹1.3 L
Closing Date
25 Mar 2026, 5:30 pmClosed
cmo kantaphod
nagar parishad kantaphod
Interception And Diversion Work for tapping Nallahs and setup STP for Used Water management for KANTAPHOD Town under SBM 2.0
2026_UAD_484560_1
347
Open Tender
Civil Works - Others
Lump-sum
365 days
kantaphod
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹1.3 L
15 Apr 2026
23 Feb 2026
28 Mar 2026
23 Feb 2026
25 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | INTERCEPTION & DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR KANTAPHOD TOWN under SBM 2.0 | 1 | LUMP SUM | 2,59,48,000 | ₹2,59,48,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
484560.pdf
Tender Documents • 1.92 MB
Specifications.pdf
Other Document • 2.34 MB
BOQ_569612.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .