| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC Lowly quoted rate than estimate rate | |
| 2 | L2₹3.1 L+₹26,290.08 (9.22%)Rejected-Finance | L2 | Rejected-Finance Highest Quoted Rate Than Estimate Rate |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
2 May 2023, 3:00 pmClosed
Block development officer
Block development officer, Ammapettai
Renovation of West Face PUM School Building at Railady in Ammapettai in Ammapet Block under 15Th FINANCE COMMISSION B.Pt. UNTIED FUND - 2022-23
2023_RDTN_306334_12
Rc.No.1202/2022/A3 dated.21.04.2023
Open Tender
Civil Works - Buildings
Item Rate
180 days
Union office Ammapettai
As per Tender document
9 documents required · 9 mandatory
₹0
₹3,000
Yes
18 Jul 2023
25 Apr 2023
2 May 2023
25 Apr 2023
2 May 2023
25 Apr 2023
Amount
Renovation of West Face PUM School Building at Railady in Ammapettai
Dismantling the Damaged Flooring including cost & conveyance, labour charges etc.,
Dismantling the damaged jolly including cost and conveyance, labour chargesetc.,
Dismantling the damaged cement plastering including cost and conveyance, labour chargesetc.,
Providing granolethic floor finishISS metal to 25mm thick including cost and conveyance of all materials to siteand all labour charges for mixing, laying, curing etc complete for 10 cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Provision for new window size of 1.2 x 1.50 m including cost and conveyance of all materials to site and al labour charges egtc., complete.,
Pressed tiles of 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Black board painting two coats using ready mixed enamel paint inculding cost & conveyance of all materials and all labour charges for etc, Complete
Providing Rainwater Harvesting Structure
Earth work excavation and depositing initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and fixing P.V.C. rainwater down fall pipe of 110mm dia with necessary shoes, bends & clamps, etc.,
Supply and filling 40mm, 20mm and fixing rings and charges
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RATHINAM TAMILSELVAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .