Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.6 L+₹14,115.36 (0.72%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L2 | Rejected-Finance L2 | |
| 3 | L3₹19.7 L+₹20,039.60 (1.03%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
24 Nov 2020, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Water supply and illumination arrangement at Benuban point in connection with Ganga Sagar Mela 2021
2020_PHED_302532_1
WBPHE/EE/SMD/NIeT- 05 of 2020-2021
Open Tender
Electrical Work/ Equipment
Item Rate
45 days
Benuban
Please refer Tender documents.
6 documents required · 6 mandatory
₹40,000
Yes
3 Sept 2021
20 Oct 2020
26 Nov 2020
20 Oct 2020
24 Nov 2020
20 Oct 2020
Amount
Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation at Benuban tube well and back after mela period as per direction of EIC.
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department)
Supply and delivery at site of Calcium Hypoclorite [Ca(OCL)₂] granules with minimum chlorine content 60% to 65% in air tight plastic container. (Make- Shree Rayalaseem Hi Strength Hypo Limited / Hind Pharma / Aquafit / PHE approved) N.B= Test certificate should be submitted at the time of delivery. Riverrine charges included
Running submersible pump sets at tube well by supplying skilled operating staff as per direction From 03-01-2021 to 16-01-2021 = 14 Days x 20 Hrs. X 3 Nos. tube well
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 07-01-2021 to 15-01-2021 [for 3 Nos. Machine]
Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC.
Guarding arrangement of the whole installation of the above item for the entire period round the clock.
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing the same at different places as per direction of EIC for the period from 08-01-2021 to 16-01-2021
Carrying charges of ACSR conductor and LED board etc from Sagar store to work site as per direction of EIC including loading unloading complete
Carrying of 1 No. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.1.2021 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
Redrawing the ACSR conductor and earth wire by single wire run for medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at Benuban areas on the existing MS poles pole and testing complete as per direction of the EIC (Binding wire will be supplied by the agency).
Drawing of 250 watt street light fixture in different place of Road, bus stand, jetty ghat etc. on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 08-01-2021 to 16-01-2021= 9 days x 150 pts.
Drawing and fitting fixing of 1000 Watt halogen fixture with lamp at jetty area from 08-01-2021 to 16-01-2021= 9 days x 20 pts.
Fixing of 18W/21W/36W CFL lamp at different places from the different feeder line to different places as per direction of EIC with supplying on hire basis 7/20 PVC insulated aluminum wire and plastic flexible wire for looping and all other necessary materials required to complete the work [damaged materials will have to be replaced by the agency at their own cost] as per direction of EIC from 08-01-2021 to 16-01-2021= 9 days x 150 pts.
Drawing tube light points from different feeder line to different places on salbollah/ Bamboo post (where necessary)as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 08-01-2021 to 16-01-2021= 9 days x 150 pts.
Supply & fitting fixing of 2 PIN 5 amps plug point at different shed [for mobile chargers] on hire basis
Making earthing arrangement on hire basis by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Supply and fitting fixing of hexagonal type safety device on hire basis 10SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Fitting foxing of LED board for Jetty demarcation on Jetty including hiring of bamboo and all necessary materials to complete the work including interconnection complete.
Supply and drawing of continuous earth wire from pole to pole by supplying 10SWG GI wire with all necessary materials and inter connection to earth electrode as per direction of EIC and IE rules complete
Making stay arrangement on hire basis by necessary materials which will be required i.e. stay wire of required length, stay rod, clamp, chips, sand etc as per IE rules and ISS complete as per direction of EIC
Construction of 12 ft x 14 ft hogla shed by supplying bamboo, polythene sheet, hogla, nail etc as per direction of the EIC only for personnel [not for DG set]
Guarding arrangement of the whole installation for the entire period.
Dismantling the existing ACSR conductor and earth wire by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, insulator, safety device binding wire from the PCC pole in different places at Chemaguri area all complete as per direction of EIC.
Carrying charges of ACSR conductor and LED board from Benuban area at chemahuri to Sagar store and proper staging the materials at departmental store as per direction of EIC.
EMERGENCY ILLUMINATION AT BENUBAN JETTY, CCTV AND OTHER ELECTRICAL GADGETS Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by 50 sq. mm. To 16 sq. mm. PVC single core AL. wire and supply of binding wire insulation connection etc. as per direction of EIC on or before 08.01.2021.
Installation of flood light fixture with 400 watt SV lamp and fixture on hire basis including guarding arrangement as per direction of EIC including withdrawing the same after mela from 12-01-2021 to to 15-01-2021 = 4 days x 24 Pts
Supply of decorative LED chain light for pole decoration a on hire basis for 07-01-2021 to 16-01-2021
Supply of 2 x 2.5 sq. mm. and 1 x 1.5 sq. mm. PVC insulated single core copper wire for connection of chain light on hire basis
Supply of 2 x 4 sq. mm. and 1 x 2.5 sq. mm. PVC insulated single core copper wire for main circuit line on hire basis
Labour charges for installation of chain light arrangement for pole decoration as per direction
Illumination arrangement of jetty no-2 and surrounding areas Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing the same at different places as per direction of EIC for the period from 08.01.2021 to 16.01.2021
Carrying charges of ACSR conductor and LED board etc from Sagar store to work site as per direction of EIC including loading unloading complete
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.01.2021 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including inter connection with earthing arrangement as per IE Rules i.e.generator to elec. Accessories of the temporary Controlling station.
Redrawing the ACSR conductor and earth wire by single wire run for medium pressure line for proper SAG and jumer connection over insulator binding and fitting the safety device as per IE rules in defferent places at Benuban areas on the existing MS poles and testing complete as per direction of EIC (binding wire will be supplied by the agency )
Drawing of 250 watt street light fixture in different plase of Road, bus stand, jetty ghat etc. on hire basis of 250 watt S.V fixture ballast, 250 watt S.V. lamp from 08.01.2021 to 16.01.2021 = 9 days x 100 pts.
Drawing and fitting fixing of 1000 watt halogen fixture with lamp at jetty area from 08.01.2021 to 16.01.2021 = 9 days x 2 pts.
Supply and fitting fixing of hexagonal type safety device on hire basis 10 SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Supply and drawing of continuous earth wire from pole to pole by supplying 10SWG GI wire with all necessary materials and inter connection to earth electrode as per direction of EIC and IE rules complete
Dismantling the existing ACSR conductor and earth wire by single run from end pole after disconnection all jointing materials i.e.jumper, insulator, safety device binding wire from the PCC pole in different placesat Chemaguri area all complete as per direction of EIC.
Supply of decorative LED chain light for pole decoration a on hire basis for 07.01.2021 to 16.01.2021
Supply 2 x 2.5 sq.mm. and 1 x 1.5 sq.mm. PVC insulated single core opper wire for connection of chain light on hire basis
Supply of 2 x 4 sq.mm. and 1 x 2.5 sq.mm. PVC insulated single core copper wire for main circuit line on hire basis
Labour charges for installation of chain light arrangement for pole decoration as per direction.
Temporary installation of the above LED board in front side of the building with proper positioning including supply and laying 7/20 PVC insulated single core Aluminium cable through PVC pipe of required length for power connection including connection.
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing the same at different places as per direction of EIC for the period from 08.01.2021 to 16.01.2021
Carrying charges of ACSR conductor and LED board etc from sagar store to work site as per direction of EIC including loading unloading complete.
Carrying of 1 No. Departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.01.2021 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including inter connection with earthing arrangement as per IE Rules i.e.generator to elec. Accessories of the temporary Controlling station.
Redrawing the ACSR conductor and earth wire by single wire run for medium pressure line for proper SAG and jumer connection over insulator binding and fitting the safety device as per IE rules in defferent places at Benuban areas on the existing MS poles and testing complete as per direction of EIC (binding wire will be supplied by the agency )
Drawing of 250 watt street light fixture in different plase of Road, bus stand, jetty ghat etc. on hire basis of 250 watt S.V fixture ballast, 250 watt S.V. lamp from 08.01.2021 to 16.01.2021 = 9 days x 110 pts.
Making earthing arrangement on hire basis by supplying 5/8 “ dia earth spike of 2 mtr. Long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Supply and fitting fixing of hexagonal type safety device on hire basis 10 SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Supply and drawing of continuous earth wire from pole to pole by supplying 10SWG GI 114.24wire with all necessary materials and inter connection to earth electrode as per direction of EIC and IE rules comlete
Construction of 12 ft x 14 ft hogla shed by supplying bamboo, polythene sheet, hogla, nall etc as per direction of EIC only for personnel [not for DG Set] only for guarding personals.
Hire and labour charges for temporary gate structure as per desighn and direction of EIC. with salbollah / bamboo post of approved size and runner, cross support, vertical support and covering with different coloured cloth and dismantling the same after completion of the mela.
Making temporary decorative lighting arrangement of gate structure on hire basis by fitting fixing at site decorative boards on salbollah / bamboo gate structures including decorative design LED lighting power with different colour LED lights. The board should have in built power circuit board for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of mela. [for Jetty No. 1 & 2]
Guarding arrangement of the whole installation for the entire period.
Dismantling the existing ACSR conductor and earth wire by single run from end pole after disconnection all jointing materials i.e.jumper, insulator, safety device binding wire from the PCC pole in different placesat Chemaguri area all complete as per direction of EIC.
Hiring of Laser and sharfy light for Jetty and information tower Supply, delivery and fitting fixing of the following at site including all electrical connection compete and running maintenance of the same during mela period (from 10-01-2021 to 16-01-2021) including dismantling the same after mela
Supply on hire basis and fitting fixing of 5R 200 / 300W Moving head Beam Light (Sharfy Light) – 7 Nos as per following specification:- a. Input voltage – AC -90-240V 50/60 Hz b. Power consumption- 300W c. Display- LED red / blue dot matrix display or LCD display . d. Control Protocol- DMX 512 e. Channel- 16CH f. Lens- 3 in 1 high precision optical lens g. Horizontal Scanning-540º (160 bit precision scanning) electron error correction. h. Vertical Scanning-270º (16 bit precision scanning) electron error correction. i. Colour Wheel- 14 colour with bidirectional function j. Lamp connection- 3 pin single line input and out put the power input
DMX splitter - 1 No. as per following Specification: Voltage AC-110 / 120V, 60 Hz, 220 / 230 / 240 V 50 Hz. DMX signal isolated electrically, compatible to both 3 pin and 5 pin connectors LED indicators display output data for each channel independently.
1200 W MOOVING Head (Laser) - 7 Nos. as per following specification: a. 2 colour wheel, 7 main colour 7 mixed colour, bi-direction high speed rolling with rainbow effect both sides. b. Gobo 1 has 4 types of fine glass gobas rotating 360º bi-direction with turnable speed against direction. c. LCD liquid crystal display can be switched in Chinese and English display. d. 1-11 times / s ultra high speed strobe effect. e. 0-100% Mechanical Linear dimming can control shading to full open. f. Inside electronics iris with 10-100% linearly adjustable g. 5 rotating Stand Prisms h. 540º Pans with 8 or 16 bit resolution i. 270º tilt with 8 or 16 bit resolution j. Automatic Pan and Tilt repositioning by photoelectric From 10-01-2021 to 16-01-2021= 7 days x 4 sets.
DMX controlling board pilot – 2000 1 No. as per following specificatiom a. Con Control up to 40 Computer Lights b. Each Lamp maximum number of channel -36 c. Functional channel reel type designs which can simultaneously control 6 channel to moving part can be provided two kinds of control mode relative and absolute in order to obtain the best effect. d. SMPTE Syncronization e. Preset and memory independent time setting. f. 40 computer lights programs running lighting lights procedures a preset and scenes can be connected with PC data transmission From 10-01-2021 to 16-01-2021= 7 days x 2 sets.
Considering present pandemic situation actual quantity of work may differ from BOQ which shall be finalized by the EIC / competent authority in due course..
ADD GST @ 12%
H.K.DAS AND CO.
ORIENTAL ENGINEERING CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .