Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹26.6 LAccepted-AOC LIG 166 MAHARANA PRATAP NAGAR KORBA CG | KORBA | CHHATTISGARH | 495452 | L-1 | Accepted-AOC Accepted as bidder attains L-1 status | |
| 2 | L-2₹23.3 L+₹78,840 (3.50%)Rejected-Finance GAYATRI SADAN PALI ROAD DIPKA DISTT KORBA C G 495452 | DIPKA | KORBA | CHHATTISGARH | 495452 | L-2 | Rejected-Finance Rejected as bidder attains L-2 status | |
| 3 | L-3₹23.7 L+₹1.2 L (5.11%)Rejected-AOC | L-3 | Rejected-AOC Rejected as bidder attains L-3 status | |
| 4 | L-4₹24.4 L+₹1.9 L (8.25%)Rejected-AOC 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | L-4 | Rejected-AOC Rejected as bidder attains L-4 status | |
| 5 | L-5₹26.0 L+₹3.4 L (15.2%)Rejected-AOC 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | L-5 | Rejected-AOC Rejected as bidder attains L-5 status |
Tender Value
₹52.5 L
EMD Value
₹65,700
Closing Date
14 Apr 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Cleaning of spillage coal and clearing of Grizzley during unloading of tippers at Truck receiving station of Silo Section and other places by mechanical means in back shifts for a period of 365 days at Dipka Expansion Project.
2025_SECL_333494_1
SECL/GM/DA/SO(EnM)/ e-tender/24-25/108 dtd-27/03/25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
5 documents required · 5 mandatory
₹65,700
11 Jun 2025
28 Mar 2025
16 Apr 2025
28 Mar 2025
14 Apr 2025
29 Mar 2025
28 Mar 2025 - 7 Apr 2025
Amount
Hiring of Tyre mounted Hydraulic excavator of one cum bucket capacity having back-hoe & front loader bucket i.e. JCB 3DX or equivalent alongwith operators, fuel, POL, etc. for Cleaning of spillage coal and clearing of Grizzley during unloading of tippers at hoppers of Truck receiving station by mechanical means for 12 hrs i.e. in back shifts. Hydraulic excavator is to be made available continously at the working place in shift with one no. operator including staggered rest, fuel, POL in ready condition for trouble free service. However the anticipated engine working hours will be 8 hrs per day i.e. about 244 hours per month. (Max. Working Hrs for 365 days = 8*365=2920 Hrs)
Note: (i). The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 01 no. (ii). All manpower must be VTC trained and must be provided with safety equipment such as safety shoes, fluorescent jackets, helmets, safety belts etc. Providing of these safety equipments will be under the scope of contractor. (iii). The Rate is inclusive of diesel cost, POL, operator wages, Contractor's Profit & other overhead expenses etc. excluding GST, CMPF & Pension of operator wages. (iv). Hydraulic excavator can also be deployed at any other locations as per instructions of Engineer In-charge. (v). For Other terms & conditions including penalty etc for non-availability of Hydraulic Excavator please refer to page no. (32-33) of NIT or Annexure-A in the uploaded tender documents.
Total impact of GST for the purpose of CTC
A. K. Rakesh (Arvind Kumar Rakesh) (BID ID -1147260)
D D ENTERPRISES (BID ID -1148346)
SANTOSH AGRAWAL (BID ID -1148442)
S N Agrawal (BID ID -1147965)
BHAKULAL SAHU (BID ID -1146099)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .