| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 LAccepted-Finance | ₹7.8 L | 1 | Accepted-Finance Price Bid is evaluated |
| 2 | 2₹8.1 LAccepted-Finance | ₹8.1 L | 2 | Accepted-Finance Price Bid is evaluated |
| Sl No | Description | Qty | Unit | KUMAR ENGINEERING CONTRACTOR L1 | M K ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for transportation of new ESP hopper lower part from store including the charges towards T&Ps etc. | 8 | No. | 52,800 ₹62,304 | 53,600 ₹63,248 |
| 2.00 | Charges for cutting and dismantling the existing wornout hopper lower part and wornout portion of hopper upper part, transporting the same to stores and devolution. | 2,500 | Kg | 35,000 ₹41,300 | 37,500 ₹44,250 |
| 3.00 | Renewal of hopper upper part wornout portion by 6 mm thick MS plates, angles and channels | 40 | m² | 52,000 ₹61,360 | 56,000 ₹66,080 |
| 4.00 | Replacement of corroded hopper bottom assembly with heating chamber by new one in ESP hopper: Work involves cutting and removal of corroded hopper bottom assembly with heating chamber, edge preparation by gauching & grinding in the existing hopper wall. Leading, lifting, positioning, aligning the new hopper assembly with the existing hopper portion and provide jointing plate, welding both top, bottom & inside and grinding the flux. Paint one coat of red oxide and two coat of enamel paint. | 8 | No. | 3,68,000 ₹4.3 L | 3,76,000 ₹4.4 L |
| 5.00 | Charges for transportation of scaffolding materials and all other required materials from pocket stores/central stores, leading and lifting the materials and providing temporary platforms wherever required dismantling temporary platform after completion of work and handing over the materials to boiler maintenance stores including all T&Ps and consumables. | 16 | No. | 1,76,000 ₹2.1 L | 1,92,000 ₹2.3 L |
| 6.00 | Charges for removal & relaying of single layer insulation wool mattress with new wool mattress after cutting to the required contour shape. | 100 | m² | 40,500 ₹47,790 | 42,000 ₹49,560 |
| 7.00 | Charges for removal of deteriorated G.I sheets and re fixing the new G.I. Sheets after fabricating to the required contour shape, making grooves and tightening with lock screws (1/4”). | 100 | m² | 40,500 ₹47,790 | 42,000 ₹49,560 |
| 8.00 | Charges for removing the GI strips and retainer plates and providing back with new strips and retainer plates. | 100 | m² | 12,000 ₹14,160 | 13,000 ₹15,340 |
Tender Value
Refer Docs
EMD Value
₹7,100
Closing Date
18 May 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit II Replacement of wornout ESP hopper lower part with hopper door renewal of wornout ESP hopper upper part and providing insulation
2026_EB_676970_1
CE/TTPS/SE/M-II/No.75/2026-27
Open Tender
Miscellaneous Works
30 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹7,100
Yes
20 May 2026
13 May 2026
19 May 2026
13 May 2026
18 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Charges for transportation of new ESP hopper lower part from store including the charges towards T&Ps etc. | 8 | No. | 55 | ₹440 | item1 |
| 2 | Charges for cutting and dismantling the existing wornout hopper lower part and wornout portion of hopper upper part, transporting the same to stores and devolution. | 2,500 | Kg | 55 | ₹1,37,500 | item2 |
| 3 | Renewal of hopper upper part wornout portion by 6 mm thick MS plates, angles and channels | 40 | m² | 55 | ₹2,200 | item3 |
| 4 | Replacement of corroded hopper bottom assembly with heating chamber by new one in ESP hopper: Work involves cutting and removal of corroded hopper bottom assembly with heating chamber, edge preparation by gauching & grinding in the existing hopper wall. Leading, lifting, positioning, aligning the new hopper assembly with the existing hopper portion and provide jointing plate, welding both top, bottom & inside and grinding the flux. Paint one coat of red oxide and two coat of enamel paint. | 8 | No. | 55 | ₹440 | item4 |
| 5 | Charges for transportation of scaffolding materials and all other required materials from pocket stores/central stores, leading and lifting the materials and providing temporary platforms wherever required dismantling temporary platform after completion of work and handing over the materials to boiler maintenance stores including all T&Ps and consumables. | 16 | No. | 55 | ₹880 | item5 |
| 6 | Charges for removal & relaying of single layer insulation wool mattress with new wool mattress after cutting to the required contour shape. | 100 | m² | 55 | ₹5,500 | item6 |
| 7 | Charges for removal of deteriorated G.I sheets and re fixing the new G.I. Sheets after fabricating to the required contour shape, making grooves and tightening with lock screws (1/4”). | 100 | m² | 55 | ₹5,500 | item7 |
| 8 | Charges for removing the GI strips and retainer plates and providing back with new strips and retainer plates. | 100 | m² | 55 | ₹5,500 | item8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_813426.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid