| Sl No | Description | Qty | Unit | M/S. S B ENTERPRISES L1 | M/S. BALAJI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
From 0.00 to 1.50 m depth from Average Ground Level | 150 | CuM | 380 ₹57,000 Lowest | 485 ₹72,750 |
| 2.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from Average Ground Level | 50 | CuM | 760 ₹38,000 | 490 ₹24,500 Lowest |
| 3.00Lead charges for lead exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc. Note: The rates are applicable for NET Quantities arrived at after making deduction for voids @ 20% in respect of soil and @ 30% in respect of debris from corresponding STACK / TRUCK Measurement. | |||||
| 3.10 | Soil | 150 | CuM | 159 ₹23,850 Lowest | 480 ₹72,000 |
| 3.20 | Debris | 100 | CuM | 240 ₹24,000 Lowest | 490 ₹49,000 |
| 4.00 | Demolishing C.C / R.C.C works by mechanical means and stock piling at designated locations carefully with out damaging adjacent structures and disposal of dismantled materials up to a lead of 100 m, stacking serviceable and unserviceable materials separately including cutting reinforcement bars all as directed at site. | 5 | CuM | 2,800 ₹14,000 | 1,900 ₹9,500 Lowest |
| 5.00 | Providing and laying non pressure 250 mm Dia NP2 class RCC Hume pipes of approved make, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2, laying to the levels, slopes and as per the drawings and specifications and as directed by the Engineer-in-charge including testing of joints etc. complete. | 20 | M | 1,797 ₹35,940 | 900 ₹18,000 Lowest |
| 6.00 | Providing and fixing PVC rain water pipes conforming to relevant IS type B and PVC SWR fittings & specials conforming to relevant IS including jointing with seal ring / With PVC solvent adhesive including fixing in walls using clamps etc complete all as per drawings, specifications and as directed by the Engineer-in-charge SWR PIPE 110 mm O/D | 10 | RM | 630 ₹6,300 | 300 ₹3,000 Lowest |
| 7.00 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead | 2 | MT | 10,030 ₹20,060 Lowest | 18,000 ₹36,000 |
| 8.00 | Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead | 30 | CuM | 2,047 ₹61,410 | 1,600 ₹48,000 Lowest |
Tender Value
₹27.2 L
EMD Value
₹64,239
Closing Date
5 Aug 2026, 3:00 pmClosed
Chief Engineer,Civil Engineering Division
Civil Engineering Division, Bhabha Atomic Research Centre, Trombay, Mumbai-400 085
Civil works for parking shed and Other Miscellaneous works at Old fire station, North site, BARC, Trombay, Mumbai
2026_BARC_915811_1
BARC/CED/ET/29/2026-2027 DATE 01/07/2026
Open Tender
Civil Works
Item Rate
180 days
North Site, BARC, Trombay, Mumbai
Please refer Tender Documents
8 documents required · 8 mandatory
₹0
₹64,239
Civil Engineering Division, BARC, Trombay, Mumbai
19 Aug 2026
8 Jul 2026
10 Aug 2026
8 Jul 2026
5 Aug 2026
22 Jul 2026
8 Jul 2026 - 15 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
From 0.00 to 1.50 m depth from Average Ground Level | 150 | CuM | - | - |
| 2 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from Average Ground Level | 50 | CuM | - | - |
| 3Lead charges for lead exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc. Note: The rates are applicable for NET Quantities arrived at after making deduction for voids @ 20% in respect of soil and @ 30% in respect of debris from corresponding STACK / TRUCK Measurement. | |||||
| 3.1 | Soil | 150 | CuM | - | - |
| 3.2 | Debris | 100 | CuM | - | - |
| 4 | Demolishing C.C / R.C.C works by mechanical means and stock piling at designated locations carefully with out damaging adjacent structures and disposal of dismantled materials up to a lead of 100 m, stacking serviceable and unserviceable materials separately including cutting reinforcement bars all as directed at site. | 5 | CuM | - | - |
| 5 | Providing and laying non pressure 250 mm Dia NP2 class RCC Hume pipes of approved make, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2, laying to the levels, slopes and as per the drawings and specifications and as directed by the Engineer-in-charge including testing of joints etc. complete. | 20 | M | - | - |
| 6 | Providing and fixing PVC rain water pipes conforming to relevant IS type B and PVC SWR fittings & specials conforming to relevant IS including jointing with seal ring / With PVC solvent adhesive including fixing in walls using clamps etc complete all as per drawings, specifications and as directed by the Engineer-in-charge SWR PIPE 110 mm O/D | 10 | RM | - | - |
| 7 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead | 2 | MT | - | - |
| 8 | Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead | 30 | CuM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Tendernotice_2.pdf
PDF • 6.02 MB
BOQ_962458.xls
BOQ • 0.28 MB
ProformaofSchedulesET29.pdf
Tender Documents • 0.77 MB
ScheduleAET29.pdf
Tender Documents • 0.76 MB
TechnicalbidET29.xls
Tender Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .