Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹4,805.94 (2.70%)Admitted-Finance 68 SREERAMPUR GARIA KOLKATA 700084 | KOLKATA | KOLKATA | WEST BENGAL | 700084 | L2 | Admitted-Finance | ||
| 3 | L3₹1.8 L+₹5,695.93 (3.20%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
11 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (civil HQ)
The Executive Engineer (C )/ HQ at 48, Market Street, Kolkata - 700087
NECESSARY REPAIRING AND PAINTING WORKS AT BAJAKADAMTALA GHAT RELATED WITH DEV-DIPABOLI FESTIVAL
2026_KMC_1048004_1
KMC/DG(C)/EEC/HQ/26-27
Open Tender
CIVIL WORKS
Percentage
7 days
KMC AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,600
23 Nov 2026
2 Nov 2026
13 Nov 2026
2 Nov 2026
11 Nov 2026
2 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018) | 12.03 | SQUARE METER. | 194 | ₹2,334.21 |
| 2 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) One Coat [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C | 1,029.07 | PER 100 SQUARE METERS. | 31.4 | ₹32,312.74 |
| 3 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 17 Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) b) Premium 100% Acrylic Emulsion N.B. The items [17 (b) & 17(c)] of subhead A are to be selected only with written permission of Superintending Engineer for very resticted and small areas of a building. | 1,029.07 | SQUARE METER. | 84 | ₹86,441.71 |
| 4 | SECTION 1. ------------BUILDING WORKS (K) PAINTING,
VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original
surface has been exposed by removal of old paint.) | 149.41 | SQUARE METER. | 29 | ₹4,332.77 |
| 5 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by
sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white) | 149.41 | SQUARE METER. | 79 | ₹11,803.07 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 45 | each | 269.5 | ₹12,127.5 |
| 7 | Sub Total | - | - | - | - |
| 8 | GST 18% | 1 | Nos. | - | - |
| 9 | CESS 1% | 1 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
form_049.pdf
Tender Documents • 1.17 MB
C1.pdf
Additional Documents • 4.88 MB
BOQ_2566530.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .