Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.9 Cr
EMD Value
₹7.3 L
Closing Date
7 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
the Executive Engineer NH Dn Hubli
Office of the Executive Engineer NH Dn Vishveshvar Nagar Hubli-32
Improvement and resurfacing of MDR Sangapur Mallapur Rampur km 3.80 to km 9.00 in Gangavati taluk of Koppal district Job No CRF-KNT-2026-27-248
2026_MoRTH_933641_1
EE/NH/HBL/PB3/2026/27/1509-2 Dt07/11/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Sangapur
As per Tender Doc
6 documents required · 6 mandatory
₹12,250
the Executive Engineer NH Dn Hubli
₹7.3 L
the Executive Engineer NH Dn Hubli
7 Nov 2026
7 Nov 2026
8 Dec 2026
7 Nov 2026
7 Dec 2026
7 Nov 2026
21 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete with all lead and lifts and as per direction of Engineer-In Charge ii) In the area of light Jungle by Mechanical means using Dozer. | 0.68 | Ha | 32,646 | ₹22,199.28 |
| - | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for subgrade construction , loading, unloading, all labour, usage charges of all machinery etc., complete with all lead and lifts and as per direction of Engineer-In Charge . | 670.5 | Cum | 93 | ₹62,356.5 |
| - | Earthwork excavation for road work in soil by mechanical means with hydraulic excavator of including cutting and loading in tippers, trimming bottom and sidesslopes, inaccordance with requirements of lines,grades, and cross sections and transporting to the embankment location, unloading, including all labour, hire charges of all machineries etc., complete with all lead and lifts and as per direction of Engineer-In Charge | 1,357.77 | Cum | 105 | ₹1,42,565.85 |
| - | Construction of Embankment with Material obtained from Borrow pits: Construction of embankment with approved material obtained from borrow pits laid in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross section including watering, consolidation by roller to the desired field density not less than 95% of maximum dry density , loading, unloading, all labour, usage charges of all machinery etc., complete with all lead and lifts and as per direction of Engineer-In Charge. as per table 300-2. | 3,672.33 | Cum | 472 | ₹17,33,339.52 |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.laid in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross section including watering, spreading, grading by motor grader and consolidation by roller with desired field density not less than 95% of maximum dry density, loading, unloading, all labour, usage charges of all machinery etc.,complete with all lead and lifts and as per direction of Engineer-In Charge . | 882.55 | Cum | 60 | ₹52,953 |
| - | Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller, loading, unloading, all labour, usage charges of machinery etc., complete complete with all lead and lifts and as per direction of Engineer-In Charge (New road formation) | 8,561.9 | Cum | 475 | ₹40,66,902.5 |
| - | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material, including all labour, usage charges of all machinery etc., complete with all lead and lifts and as per direction of Engineer-In Charge .By Mechanical Means using Hydraulic excavator | 5,447.81 | Sqmt | 8.1 | ₹44,127.28 |
| - | Granular Sub-Base with Close /Coarse Graded Material
(Table:- 400-1)By Mix in Place Method : Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, complete with all lead and lifts and as per direction of Engineer-In Charge . (Compacted thickness) Grading V material(Loose Graded). | 3,596.48 | Cum | 2,246 | ₹80,77,694.08 |
| - | construction of wet mix macadam by providing laying, spreading and compacting of graded stone aggregates as per table 400-12&13, including premixing the materail with water at OMC in mechanical mix plant carriage of mixed material tipper to site paver, laying in uniform layers in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, hire charges of machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all etc., complete with all lead and lifts and as per direction of Engineer-In Charge . ( compacted thickness) B) laying using grader | 3,568.13 | Cum | 2,440 | ₹87,06,237.2 |
| - | Providing and applying primer coat with slow setting (SS1) bitumen emulsion complying with IS 8887 on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per table -500-3, including cost of all materials, labour, hire charges of machinery, loading, unloading etc., complete with all lead and lifts and as per direction of Engineer-In Charge . | 12,292.5 | Sqm | 101.25 | ₹12,44,615.63 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_981125.xls
BOQ • 0.33 MB
248KW4.pdf
Tender Documents • 1.10 MB
Generalconditions.pdf
Additional Documents • 0.23 MB
Documentssubmit.pdf
Additional Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .