Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.7 LAccepted-AOC C O DHARMENDER GROUND FLOOR MANKAWAS ROAD BACK SIDE OF GOVT GIRL HIGH SCHOOL VPO CHARKHI TEHSIL AND DISTRICT CHARKHI DADRI | CHARKHI DADRI | CHARKHI DADRI | HARYANA | 1 | Accepted-AOC ok | |
| 2 | 2₹42.6 L+₹1.9 L (4.56%)Rejected-AOC NEAR GOVT MIDDLE SCHOOL VILLAGE KHERI SANWAL TEHSIL AND DISTRICT CHARKHI DADRI | CHARKHI DADRI | CHARKHI DADRI | HARYANA | 2 | Rejected-AOC ok | |
| 3 | 3₹43.6 L+₹2.9 L (7.12%)Rejected-AOC WARD NO 2 NEAR ADARSH SCHOOL CHARKHI DADRI 127306 | CHARKHI DADRI | CHARKHI DADRI | HARYANA | 127306 | 3 | Rejected-AOC ok | |
| 4 | 4₹47.9 L+₹7.2 L (17.6%)Rejected-AOC 182 INDRA COLONY VILL DAMODARPURA POST TODABHATA TEA BASSI BASSI JAIPUR JAIPUR RAJASTHAN 303301 | JAIPUR | RAJASTHAN | 303301 | 4 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | PAWAN KUMAR CONTRACTOR L2 | BIJENDER SINGH CONTRACTOR L3 | M/s Balaji Construction Co. L4 | M/S DHARMENDER AND COMPANY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Credit of old Steel | 1,902.7 | Kg. | 30 ₹-57,081.12 Lowest | 30 ₹-57,081.12 Lowest | 50 ₹-95,135.2 | 30 ₹-57,081.12 Lowest |
| 2.00 | CREDIT RATE OF BRICKS RECOVERED FROM DISMENTALING EXISTING STRUCTURE | 109.47 | cum | 880 ₹-96,334.48 Lowest | 880 ₹-96,334.48 Lowest | 1,625 ₹-1,77,890.38 | 880 ₹-96,334.48 Lowest |
| 3.00 | Credit for RS Joists used in diversion | 5,864.96 | Kg. | 104 ₹-6,09,955.84 Lowest | 104 ₹-6,09,955.84 Lowest | 110 ₹-6,45,145.6 | 104 ₹-6,09,955.84 Lowest |
| 4.00 | Suppling and Laying of Wooden Sleeper (size 10`x1`x0.5`) as per satisfaction of Engineer-in-charge. | 6.35 | cum | 8,850 ₹56,232.9 | 12,000 ₹76,248 | 10,000 ₹63,540 | 8,500 ₹54,009 Lowest |
| 5.00 | credit of wooden sleeper used in diversion | 6.35 | cum | 9,600 ₹-60,998.4 Lowest | 9,600 ₹-60,998.4 Lowest | 10,000 ₹-63,540 | 9,600 ₹-60,998.4 Lowest |
Tender Value
₹65.9 L
EMD Value
₹1.3 L
Closing Date
25 Feb 2026, 6:00 pmClosed
SATYENDER KUMAR
L.W.S. Divn. Ch-Dadri
Reconstruction of VR Bridge at RD 63300 of Badhwana disty
2026_HRY_501827_1
20264084B4AB 6320 4C7E 9D97 35E25DA5785F134IRR
Open Tender
Civil Works
Works
120 days
Charkhi Dadri
2 documents required · 2 mandatory
₹5,000
₹1.3 L
Yes
25 Mar 2026
10 Feb 2026
26 Feb 2026
10 Feb 2026
25 Feb 2026
10 Feb 2026
10 Feb 2026 - 12 Feb 2026
Credit of old Steel
CREDIT RATE OF BRICKS RECOVERED FROM DISMENTALING EXISTING STRUCTURE
Credit for RS Joists used in diversion
Suppling and Laying of Wooden Sleeper (size 10`x1`x0.5`) as per satisfaction of Engineer-in-charge.
credit of wooden sleeper used in diversion
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Item Description HSR Item
H.S.R. Items
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_580476.xls
BOQ • 0.34 MB
OT0150678.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .