Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.5 L+₹92,705.47 (5.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹19.9 L+₹1.3 L (7.10%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L3 | Rejected-Finance L3 |
Tender Value
₹18.5 L
EMD Value
₹23,200
Closing Date
3 Jan 2025, 11:00 amClosed
AREA ENGINEER EnM, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Extension of 1400mm 3rd belt thrice for 70 mtr and 45 mtr length twice , Dismantling Transportation, Installation, Commissioning Trial run including necessary fabrication jobs Extension of 1400mm 3rd belt thrice for 70 mtr and 45 mtr length twice ,
2024_ECL_323823_1
ECL/GM/JNR/EnM/A2/24-25/101 dated 17.12.2024
Open Tender
Miscellaneous Works
Item Rate
30 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,200
12 Jun 2025
23 Dec 2024
4 Jan 2025
23 Dec 2024
3 Jan 2025
24 Dec 2024
23 Dec 2024 - 30 Dec 2024
Amount
Transportation and Installation of 160 mtr of belt structure, after loading it on MUV from surface
Transporting, laying, lapping & jointing of 320 mtr of belting
Dismantling of Tail-end Unit Complete with dust collector
Transportation and Installation of Tail-end Unit Complete with dust collector
Extension of pull cord,signalling and lock out devices.
Supply of M.S. Nut & Bolt (M16x40)
Supply of GI Wire 8 SWG
Supply of Bobin insulator
Supply of M.S. Nut & Bolt (3/8" x 3")
Transportation and placement of Starter, VCB, laying cables and lock out devices for 500 metre length
Dismantaling of 2x150KW, 6.6 KV, Dual Drive unit Complete with Drive Drum, Driven Drum, Two Gear Boxes, Two Motors, Couplings, Bearing Blocks, Dust Collector, Fenchings etc. at 9L/23Dip and loading it on MUV
Dismantaling of Discharge Unit Complete with Cleaner at 9L/23ADip and loading it on MUV
Dismantaling of Loop Take-up Unit Complete at 9L/23Dip and loading it on MUV
188 mtr of belt structure dismantling, and loading it on MUV from 9L/23Dip to 18Dip
Dismantaling of tail end Unit Complete with Cleaner at 9L/10Dip and loading it on MUV
Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc to 48Dip/+1L from 9L/23Dip with the help of MUV
Transportation and installation of Discharge Unit Complete with Cleaner at 48Dip/0L from 7L/23ADip with the help of MUV
Transportation and installation of Loop Take-up Unit Complete with fencing at 48 dip in between +1L & +2L from 9L/23dip with the help of MUV
Transportation and installation of Tail-end Unit Complete at 48Dip/+5L after loading it on MUV from 9L/10Dip with the help of MUV
Transportation and installation of 188 mtr of belt structure after loading it on MUV from 9L/23Dip to 18 Dip
Transporting,laying,lapping &jointing of 396 mtr of belting
Supply of M.S. Nut & Bolt (M16x40)
Supply of GI Wire 8 SWG
Supply of Bobin insulator
Supply of M.S. Nut & Bolt (3/8" x 3") with Washer
Civil works
Total impact of GST for the purpose of CTC
K R ENTERPRISE (BID ID -1113875)
F.R. ENTERPRISE (BID ID -1113879)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .