| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.4 CrAdmitted-Finance | ₹61.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹61.7 CrAdmitted-Finance | ₹61.7 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JK Electric Engineers Pvt. Ltd. L2 | Ali Mohammad Baba and Sons L1 |
|---|---|---|---|---|---|
| 1.00Schedule of Rates for Supply Works pertaining to GAS INSULATED SUBSTATION at Sumbal | |||||
| 2.00Part-A : EMPLOYER ASSESSED QUANTITIES | |||||
| 3.00POWER TRANSFORMER | |||||
| 4.00POWER TRANSFORMER | |||||
| 5.00 | 10MVA , 132/33 KV, 3-phase transformer (Excluding insulating oil) | 2 | Nos. | 3,10,43,425 ₹6.2 Cr | 2,43,89,234.9 ₹4.9 Cr |
| 6.00 | Insulating oil for 10MVA , 132/33 KV, 3-phase transformer (* 1Lot = Oil for one transformer ) | 2 | Lot* | 20,87,250 ₹41.7 L | 20,90,505.8 ₹41.8 L |
| 7.00 | Nitrogen Injection Fire Fighting System | 2 | Nos. | 16,69,800 ₹33.4 L | 16,30,594.6 ₹32.6 L |
| 8.00 | On line Insulating oil drying system | 2 | Nos. | 6,95,750 ₹13.9 L | 8,71,044.1 ₹17.4 L |
| 9.00 | On line Dissolved Gas & Moisture Analyser | 2 | Nos. | 29,91,725 ₹59.8 L | 42,50,695.2 ₹85.0 L |
| 10.00Testing & Maintenance Equipments | |||||
Tender Value
₹65 Cr
EMD Value
₹1.3 Cr
Closing Date
23 Aug 2023, 4:00 pmClosed
executive engineer tlmd 8
PDD Copmplex Bemina Srinagar JK
Design, Manufacturing, Supply, Erection, Testing and Commissioning of 20 MVA, 132/33kV GIS at Sumbal, District Ganderbal Including 33k 300mm XLPE Power Cable from GIS Sumbal to Gagangeer (Z- Morh Tunnel) in Kashmir Valley
2023_PDD_223514_1
TLMD-VIII /TS/ 09 of 2023 Dated 25-07-2023
Open Tender
Electrical Works
183 days
kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
executive engineer tlmd 8
₹1.3 Cr
Office of CE JKTPCL Kashmir
18 Sept 2023
27 Jul 2023
24 Aug 2023
27 Jul 2023
23 Aug 2023
28 Jul 2023
27 Jul 2023 - 11 Aug 2023
10 Aug 2023
Amount
Schedule of Rates for Supply Works pertaining to GAS INSULATED SUBSTATION at Sumbal
Part-A : EMPLOYER ASSESSED QUANTITIES
POWER TRANSFORMER
POWER TRANSFORMER
10MVA , 132/33 KV, 3-phase transformer (Excluding insulating oil)
Insulating oil for 10MVA , 132/33 KV, 3-phase transformer (* 1Lot = Oil for one transformer )
Nitrogen Injection Fire Fighting System
On line Insulating oil drying system
On line Dissolved Gas & Moisture Analyser
Testing & Maintenance Equipments
Oil Storage Tank (10KL)
Transformer Oil Filtration plant (6KLPH)
BDV TEST KIT
OIL SAMPLING BOTTLE
LT AUXILIARY TRANSFORMER
250 kVA, 33/0.433kV
250KVA, 3 Phase, Automatic voltage Stablizer
145KV Equipment
145KV GIS Equipment
145kV, SF6 GIS Bus Bars Module (double main scheme) [ Module description as per Section Project, Technical specification]
145kV, SF6 GIS Transformer bay Module [ Module description as per Section Project, Technical specification]
145kV, SF6 GIS Line Bay Module [ Module description as per Section Project, Technical specification] including provisions for connecting Transmission Line with GIS Line Bay Module (Using SF6 to Air Bushing etc.) as per OEM Design Standards
145kV, SF6 GIS Bus Coupler bay Module [ Module description as per Section Project, Technical specification]
145kV, 800A,31.5kA SF6/Air Bushing (3 phase) for Connecting GIS to AIS alongwith support structure and required Bus duct as per OEM design standards
145KV Outdoor Equipment
120KV Surge Arrester (1-phase)
145kV BPI
36KV Equipment
36KV, 2500Amps, 25KA for 3 Sec GIS Equipment
36kV, SF6 GIS Bus Bar Enclosure Module including, Bus PT's, Bus riser etc as per Single Bus Scheme with Sectionaliser [ Module description as per Section Project, Technical specification]
36kV, SF6 GIS Line bay Module [ Module description as per Section Project, Technical specification]
36kV, SF6 GIS Transformer bay Module [ Module description as per Section Project, Technical specification]
36kV, SF6 GIS Auxiliary transformer bay Module [ Module description as per Section Project, Technical specification]
Forconnecting36KVGIStoAIS,SupplyofTouchProof 36 KV cable termination kits shall be needed as per latest OEM Practices.
3 Phase - 33KV Copper XLPE cable for connecting power Transformer LV from the gantry structure with 33KV GIS panel
36kV Outdoor Equipments
33 kV Isolators with earth switch
30 kV Surge Arrestors (1-phase)
33 kV BPI
Testing & Maintenance Equipment for GIS
SF6 Gas filling & evacuating plant
For 145kV & 36kV GIS
Partial Discharge Monitoring System for GIS as per Technical Specification
For 145kV GIS
For 36kV GIS
Dew Point meter
For 145kV & 36kV GIS
SF6 Gas Leak Detector
For 145kV & 36kV GIS
EOT crane for 145kV GIS Hall
SF6 Gas Analyser
RELAY PANELS (WITH AUTOMATION)
145kV Simplex Panels
Line Protection Panel
Transformer Protection Panel (For both HV & LV side)
Bus Bar Protection Panel
Bus Coupler Pannel
33 KV Simplex Panels
Line Protection Panel
Transformer Protection Panel (For both HV & LV side)
Bus Bar Protection Panel
Bus sectionaliser Pannel
station auxillary pannel
COMMON EQUIPMENTS
Relay Test kit
Time synchronisation equipment with digital Clock
SUBSTATION AUTOMATION
Complete Substation Automation System (SAS) for substation including hardware and software for the substation & remote control stations alongwith associated equipments for the following bays as per Technical Specification
Main bays to be automated
132 kV system
33 kV system
BCU for controlling & monitoring of Auxilary System
LT Switchgear (As per Technical specification)
415V Main switchboard
415V ACDB
415V MLDB
415V Emergency LDB
110V DCDB
48V DCDB
Batteries
Float Cum Boost Battery Charger
110V Float Cum Boost Battery Charger
48V Float Cum Boost Battery Charger
Diesel Generator with control Panel
Fire Protection System
Portable /Trolley/Wheel mounted extinguishers
9 litre water type
50 litre foam type
4.5 kg CO2 type
4.5 kg Dry Chemical Power (DCP) type
Cables along with clamps, glands, lugs and straight joints etc.
Power Cables - (36kV grade)
36kV Single Core H.T cable suitable for 1000Amps rating along with all accessories including termination kit as per specification ( for Power transformer application ). Number of runs and size of the cable per Phase to be decided by contractor
36kV H.T cable of suitable size along with all accessories including termination kit as per specification ( for Auxiliary transformer application )
36kV Single core H.T cable suitable for 500Amps rating along with all accessories including termination kit as per specification ( for Feeder Bay application )
Power cables - (1.1kV grade)
3.5Cx300 sqmm (XLPE) cable for filter Machine along with termination arrangement as per TS
Air conditioning System for Control room cum administrative building
High wall type split AC unit of 2 TR capacity ( Hot and Cold Type)
Fabrication, galvanising and supply of following Steel Structures including nuts, bolts, all types of washers, packplates, step bolts and gusset plates including foundation bolts.
Lattice Structure (Towers, Beams, LM and Equipment/support structure) including Foundation Bolts
Fastners and step bolts.(Nuts,Bolts & Washers)
Providing and designing of Telecommunication equipment as per specifications in SBD
Part-B: VENDOR ASSESSED QUANTITIES
Erection Hardware
Hardware, conductor, Al tube, bus-bar materials, cable trays, clamps, spacers, connectors including equipment connectors, Junction box, earthwire, buried cable trenches/pipe equipment & lighting, 36kV Cable Termination kit alongwith all accessories etc. for 145kV GIS to AIS Termination Arrangement at Transformer and and termination of 36kV cables from Cable box of Transformers to GIS cable teminal enclosure to line feeders, LT Transformer:
Earthing material including main Earth mat, Equipment earthing, structures etc. inside and outside GIS Hall for complete Grid Premises for complete scope of work as per technical specifications and as per design
Fire detection & Alarm System for all buildings
145KV GIS hall
36KV GIS hall/Room
Panel room of 145kV
Control room cum administrative building
Illumination System
Control room cum administrative building illumination
Switchyard lighting
Street lighting
145KV GIS hall
36KV GIS hall/room
Panel room of 145kV
Store
Security room
Parking Shed
Air conditioning & ventilation System
Air conditioning system
Panel room of 145kV GIS Hall
Ventilation system
145KV GIS hall (AHU as per Annexure)
36KV GIS hall (Exhaust fans)
POWER & CONTROL CABLES
Power Cables(PVC)- (1.1kV grade)
Power Cables (XLPE) (excluding 3.5Cx300 sqmm (XLPE) cable for filter Machine)- (1.1kV grade)
Control Cable (PVC)- (1.1kV grade)
Cable glands, lugs & straight through joints for Power & Control cables
Mandatory Spares as per list in SBD for GIS Substation
Schedule of Rates for Erection, Testing & Commissioning Works pertaining to GAS INSULATED SUBSTATION at Sumbal
Part-A : EMPLOYER ASSESSED QUANTITIES
POWER TRANSFORMER
POWER TRANSFORMER
10MVA , 132/33 KV, 3-phase transformer (Excluding insulating oil)
Insulating oil for 10MVA , 132/33 KV, 3-phase transformer (* 1Lot = Oil for one transformer )
Nitrogen Injection Fire Fighting System
On line Insulating oil drying system
On line Dissoved Gas & Moisture Analyser
LT AUXILIARY TRANSFORMER
250 kVA, 33/0.433kV
250KVA, 3 Phase, Automatic voltage Stablizer
145KV Equipment
145KV GIS Equipment
145kV, SF6 GIS Bus Bars Module (double main scheme) [ Module description as per Section Project, Technical specification]
145kV, SF6 GIS Transformer bay Module [ Module description as per Section Project, Technical specification]
145kV, SF6 GIS Line Bay Module [ Module description as per Section Project, Technical specification] including provisions for connecting Transmission Line with GIS Line Bay Module (Using SF6 to Air Bushing etc.) as per OEM Design Standards
145kV, SF6 GIS Bus Coupler bay Module [ Module description as per Section Project, Technical specification]
145kV, 800A,31.5kA SF6/Air Bushing (3 phase) for Connecting GIS to AIS alongwith support structure and required bus duct as per OEM design standards
145KV Outdoor Equipment
120KV Surge Arrester (1-phase)
145kV BPI
36KV Equipment
36KV, 2500Amps, 25KA for 3 Sec GIS Equipment
36kV, SF6 GIS Bus Bar Enclosure Module including, Bus PT's, Bus riser etc as per Single Bus Scheme with Sectionaliser [ Module description as per Section Project, Technical specification]
36kV, SF6 GIS Line bay Module [ Module description as per Section Project, Technical specification]
36kV, SF6 GIS Transformer bay Module [ Module description as per Section Project, Technical specification]
36kV, SF6 GIS Auxiliary transformer bay Module [ Module description as per Section Project, Technical specification]
Forconnecting36KVGIStoAIS,SupplyofTouchProof 36 KV cable termination kits shall be needed as per latest OEM Practices.
3 Phase - 33KV Copper XLPE cable for connecting power Transformer LV from the gantry structure with 33KV GIS panel
36kV Outdoor Equipments
33 kV Isolators with earth switch
30 kV Surge Arrestors (1-phase)
33 kV BPI
EOT crane for 145kV GIS Hall
RELAY PANELS (WITH AUTOMATION)
145kV Simplex Panels
Line Protection Panel
Transformer Protection Panel (For both HV & LV side)
Bus Bar Protection Panel
Bus Coupler Pannel
33 KV Simplex Panels
Line Protection Panel
Transformer Protection Panel (For both HV & LV side)
Bus Bar Protection Panel
Bus sectionaliser Pannel
station auxillary pannel
COMMON EQUIPMENTS
Time synchronisation equipment with digital Clock
SUBSTATION AUTOMATION
Complete Substation Automation System (SAS) for substation including hardware and software for the substation & remote control stations alongwith associated equipments for the following bays as per Technical Specification
Main bays to be automated
132 kV system
33 kV system
BCU for controlling & monitoring of Auxilary System
LT Switchgear (As per Technical specification)
415V Main switchboard
415V ACDB
415V MLDB
415V Emergency LDB
110V DCDB
48V DCDB
Batteries
Float Cum Boost Battery Charger
110V Float Cum Boost Battery Charger
48V Float Cum Boost Battery Charger
Diesel Generator with control Panel
Fire Protection System
Portable /Trolley/Wheel mounted extinguishers
9 litre water type
50 litre foam type
4.5 kg CO2 type
4.5 kg Dry Chemical Power (DCP) type
Cables along with clamps, glands, lugs and straight joints etc.
Power Cables - (36kV grade)
36kV Single Core H.T cable suitable for 1000Amps rating along with all accessories including termination kit as per specification ( for Power transformer application ). Number of runs and size of the cable per Phase to be decided by contractor
36kV H.T cable of suitable size along with all accessories including termination kit as per specification ( for Auxiliary transformer application )
36kV Single core H.T cable suitable for 500Amps rating along with all accessories including termination kit as per specification ( for Feeder Bay application )
Power cables - (1.1kV grade)
3.5Cx300 sqmm (XLPE) cable for filter Machine along with termination arrangement as per TS
Air conditioning System for Control room cum administrative building
High wall type split AC unit of 2 TR capacity ( Hot and Cold Type)
Fabrication, galvanising and supply of following Steel Structures including nuts, bolts, all types of washers, packplates, step bolts and gusset plates including foundation bolts.
Lattice Structure (Towers, Beams, LM and Equipment/support structure) including Foundation Bolts
Fastners and step bolts.(Nuts,Bolts & Washers)
Providing and designing of Telecommunication equipment as per specifications in SBD
Part-B: VENDOR ASSESSED QUANTITIES
Erection Hardware
Hardware, conductor, Al tube, bus-bar materials, cable trays, clamps, spacers, connectors including equipment connectors, Junction box, earthwire, buried cable trenches/pipe equipment & lighting, 36kV Cable Termination kit alongwith all accessories etc. for 145kV GIS to AIS Termination Arrangement at Transformer and and termination of 36kV cables from Cable box of Transformers to GIS cable teminal enclosure to line feeders, LT Transformer:
Earthing material including main Earth mat, Equipment earthing, structures etc. inside and outside GIS Hall for complete scope of work as per technical specifications
Fire detection & Alarm System for all buildings
145KV GIS hall
36KV GIS hall/Room
Panel room of 145kV
Control room cum administrative building
Illumination System
Control room cum administrative building illumination
Switchyard lighting
Street lighting
145KV GIS hall
36KV GIS hall/room
Panel room of 145kV
Store
Security room
Parking Shed
Air conditioning & ventilation System
Air conditioning system
Panel room of 145kV GIS Hall
Ventilation system
145KV GIS hall (AHU as per Annexure)
36KV GIS hall (Exhaust fans)
POWER & CONTROL CABLES
Power Cables(PVC)- (1.1kV grade)
Power Cables (XLPE) (excluding 3.5Cx300 sqmm (XLPE) cable for filter Machine)- (1.1kV grade)
Control Cable (PVC)- (1.1kV grade)
Cable glands, lugs & straight through joints for Power & Control cables
Part-C: Civil Works (As per Technical Specifications)
Soil Investigation as per TS
Contouring and levelling of plot including excavation / filling to be carried out where ever necessary in order to attain the required area as per layout.
Design, Engineering and Construction of foundation for following equipments/Structures
10 MVA Power Transformer
250KVA LT Transformer
100 KVA D.G.Set
Tower Structure, Support structure for GIS 132 duct, Lightning Mast etc.
Equipments such as L.A, BPI
Fire wall (Foundation and protection wall of 7M height approximately) for Power transformer
Cable Trench of various sizes as per drg. given in specs.,Including crossings of various sizes as per design
Buried Cable Trench for Auxiliary Power Supply arrangement, Power Transformer and Line feeders
Design, Engineering and Construction of following buildings inclusive of PCC, RCC, reinforcement, internal cable trench (if required) internal and external finish, internal water supply, internal and external sanitation, septic tank and soak pit etc complete in all respects
CONTROL ROOM & Administation Building (Double storey)
Resedential Quarters
Electrification of resedential colony , installing of energy meters, ST Poles etc complete job including illumination of road and yard area
132 KV GIS HALL
GIS Hall
AHU/ Panel Room
Relay Panel Room
33 KV GIS HALL
GIS Hall
Security room
Design, Engineering and Construction of parking shed, store etc. inclusive of PCC,RCC, reinforcement, internal and External finishs etc. complete in all respects
Parking shed for 5 No. vehicles
Store ( 15Mx6M)
Construction of Concrete ( RCC) road
Road 3.75m wide
Road 5.5m wide
All civil works for Boundary wall including excavation, concrete, reinforcement steel ,structural steel, plaster, painting, barbed wire and concertina coil etc all complete as per technical specification as per design
Main boundary wall Gate (Steel ) including all works complete as per technical specification
Chain link fencing as per technical sepcification and drawing
Fencing Gates
Design and Construction of Drainage system
Antiweed Treatment
75mm thick P.C.C (1:5:10) in switchyard area
Gravel Filling
Supplying & laying RCC hume pipe of grade (NP-3) for culverts and cable trench crossings of following dia.
250mm dia
300mm dia
450mm dia
Supplying and erecting dewatering pumps
Providing and Laying of G.I. pipe (Medium Duty) for water supply from borewell/water source to Fire water Tank, control room building, Transit camp and security room.
Random rubble Masonary Retaining Wall where ever required
Random rubble Masonary with hard stone in foundation and plinth including levelling up with cement conctrete 1:6:12(1 cement: 6 coarse sand and 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 cement : 6 coarse sand)
Miscellaneous Steel
Complete Operation and Maintainance of GIS Station ( including grid premises) and 33 KV Cable from GIS Sumbal to Gagangeer for a period of 5 Years
Schedule of Rates for Supply Works pertaining to 33kv 3 core, 300 sqmm Aluminium XLPE Cable from GIS at Sumbal to Gagangeer Sonmarag
PART - I: MAIN EQUIPMENT
Supply of 33kV, Three core 300 mm2 Aluminium flat wire Armoured XLPE Cable , FRLS one spare cable
Cable joints suitable for cable above for entire route for both circuits including the spare
Underground Fibre Optic (FO) cable of 12cores for real time thermal monitoring co-operated with DTS (distributed Temperature Sensor) including DTS system as per technical Specification
DTS system to measure cable temperature along with detection of hotspots for 2 circuits of 3 core XLPE cable as per approved design
Underground Fibre Optic (FO) armoured cable of 12cores along with joints etc. for real time thermal monitoring co-operated with DTS (distributed Temperature Sensor)/ DAS as per approved design
Cable end termination(s) on Overhead line tower-structure as per technical specification
Cable termination for 33 kV Cable at Gas insulated substations (suitable for terminations in GIS) as per technical specification
30 kV Lightning Arrestor along with terminal connectors on Owners Overhead line tower-structure as per technical specification
Supply of galvanized Steel Structures including nuts, bolts, all types of washers, pack plates, step bolts etc.
Miscellaneous installation materials for Cable laying, Jointing and bonding including link boxes , earth continuity cable, earthing material , ground mat, cable markers, warning tapes and all other materials etc. required as per techanical specifications and as per statutory requirements
Underground Fibre Optic Cable & Accessories
Unarmoured Underground FO cable (24 Fibre DWSM)
Joint Box (24 Fibres) for entire length
GI pipe 150 mm (Nominal bore), medium class (incl. accessories)
FODP: 19" rack mounted with 48 FCPC couplings & 48 pigtails (5mtrs).
RCC hume pipe (NP3), 100 mm dia. (inside) incl. accessories
Supply of PLB HDPE Pipe O.D 40mm including accessories – to be used for 12 core and 24 core Fiber Optic Cable
Supply of HDPE Pipes as per specifications suitable for 33 KV 3 core, 300 sqmm Aluminium XLPE Cable
PART - II: MANDATORY SPARES for 33kv 3 core, 300 sqmm Aluminium XLPE Cable from GIS at Sumbal to Gagangeer Sonmarag
33kV, Three core 300 mm2 Aluminium flat wire Armoured XLPE Cable , FRLS
Cable joint each type
Link Box
Cable termination each type
Unarmoured Underground FO cable (24 Fibre DWSM)
Joint Box (24 Fibres)
Schedule of Rates for Erection, Testing & Commissioning Works pertaining to 33kv 3 core, 300 sqmm Aluminium XLPE Cable from GIS at Sumbal to Gagangeer Sonmarag
PART - I: MAIN EQUIPMENT
Detailed route survey for the entire route length Sumbal Power House GIS Substation to Gagangeer & coordination for statutory Clearances from relevant authorities for laying of cables on behalf of Owner.
Laying of 33kV, Three core 300 mm2 Aluminium flat wire Armoured XLPE Cable , FRLS one spare cable
Cable joints suitable for cable above for entire route for both circuits including the spare
Underground Fibre Optic (FO) cable of 12cores for real time thermal monitoring co-operated with DTS (distributed Temperature Sensor) including DTS system as per technical Specification
DTS System to measure cable temperature along with detection of hotspots for 2 circuits of 3 core XLPE cable as per approved design
Underground Fibre Optic (FO) armoured cable of 12cores along with joints etc. for real time thermal monitoring co-operated with DTS (distributed Temperature Sensor)/ DAS as per approved design
Cable end termination(s) on Overhead line tower-structure as per technical specification
Cable termination for 33 kV Cable at Gas insulated substations (suitable for terminations in GIS) as per technical specification
30 kV Lightning Arrestor along with terminal connectors on Owners Overhead line tower-structure as per technical specification
Erection of galvanized Steel Structures including nuts, bolts, all types of washers, pack plates, step bolts etc.
Miscellaneous installation materials for Cable laying, Jointing and bonding including link boxes ,sheath Voltage limiters, earth continuity cable, earthing material , ground mat, cable makers, warning tapes and all other materials etc. required as per technical specifications and as per statutory requirements
Construction of sand buried cable trench along with excavation, PCC, RCC, back filling, restoration and construction of jointing bays (as per requirement) etc. as per technical specification including suply of sand etc as per design and route survey including use of pre cast RCC covers as per site requirment.
Laying and installation complete Job for HDPE Pipes including trenchless digging etc as per design and restoration of road as per specification.
Laying and installation of Underground Fibre Optic Cable & Accessories including Laying of PLB HDPE pipe in Open Trench or trenchless digging and installation of GI pipe 100 mm (Nominal bore), medium class (incl. accessories) and RCC hume pipe (NP3), 100 mm dia (inside) incl. accessories as needed including installtion of Unarmoured Underground FO cable (24 Fibre DWSM),Joint Box (24 Fibres) (including splicing & testing),FODP (including splicing & testing) for joint locations,for providing service loops at crossing,for joint locations,for providing service loops at crossing and Installation of PLB HDPE pipe on wall in building premises including routing of OFC through it complete Job all along the route
Change over arrangement of spare Cable Circuit at both ends i.e at GIS Sumbal and at Gagangeer near Z-Mohr Tunnel including supply of material like lattice / pipe structure, conductor etc including necessary civil works complete job for 33 KV XLPE 3 core 300 sqmm Cable.
JK Electric Engineers Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
gnrl.pdf
Tender Documents • 8.47 MB
gistech.pdf
Tender Documents • 10.17 MB
BOQ_631081.xls
BOQ • 0.47 MB
cabletech.pdf
Tender Documents • 9.02 MB
Download all tender documents and submit your bid