Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance | ₹4.8 L | L1 | Accepted-Finance Lowest rate Quoted Financially qualified |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance Financially Disqualified |
| 3 | L3₹4.9 LRejected-Finance | ₹4.9 L | L3 | Rejected-Finance Financially Disqualified |
Tender Value
₹4.9 L
EMD Value
₹9,711
Closing Date
17 Jan 2026, 1:00 pmClosed
Executive Engineer, K.C.D.No-II, Khatra, Bankura
Executive Engineer, K.C.D.No-II, Khatra, Bankura.
MR to Inspection Path from Ch.-48.50 to Ch. 66.500 of Right Bank of SMC under K.C. Sub Division No-V of K.C. Division No.-II under State Development Scheme in Block Khatra during the Year 2025-26
2026_IWD_982597_28
WBIW/EE/KCD2/eNIT-06/2025-26.
Open Tender
CIVIL WORKS
120 days
Khatra
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,711
Yes
17 Feb 2026
8 Jan 2026
19 Jan 2026
8 Jan 2026
17 Jan 2026
8 Jan 2026
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30cm. Girth including removing as directed by Engineer-in-charge.
Water Bound Macadam Sub Base Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary arthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by ecessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm): NOTE:-Add cost at site of 1.45 m³ of materials to arrive at the complete rate.
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Note: Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67. (The payment is to be made on the basis of the finished compacted volume of moorum.)
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
BOQ_2397471.xls
BOQ • 0.27 MB
WB_2911_28.pdf
Tender Documents • 1.27 MB
Download all tender documents and submit your bid