Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -35.86% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 LAdmitted-Finance | -15.01% | ₹7.7 L | L2 | Admitted-Finance |
Tender Value
₹9.1 L
EMD Value
₹18,234
Closing Date
11 Feb 2026, 4:00 pmClosed
Executive Engineer (R-II)
R-II Division, Tilak Lane, New Delhi
Garden, parks and fountain. SH - Repairing and maintenance of fountains at Lodhi Garden under Humayun Road service center in R-II division.
2026_NDMC_286095_1
89/EE(R-II)/2025-26 (200643)
Open Tender
Civil Works
365 days
NDMC Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,234
14 Feb 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
Repair/Maintenance of all electrical and mechanical system (including repair/rewinding of motors) and mechanical faults of pump sets, electrical panels and fitting/fixtures/waterline etc. The fountain shall be run invariably and contractor has to arranged all necessary resources required(all the fountains shall be handed over to contractor in running condition and no payment shall be made for any fault and the same shall be rectified/repaired by the contractor at their own cost) and also includes watch & ward of all the accessories i.e Nozzles, Motors ,valve, starter, panel & cable etc. & complete fountain in all regards including security theft, maintenance repair etc.complete as per direction and entire satisfaction of Engineer-in-charge. Conditions:- 1. Agency will be responsible for the security of the entire fountain systems at said locations and any loss/ vandalism will be restored to the original shape by the agency. In case of non-compliance, the same will be recovered at the market rate or as decided by the engineer in charge. The decision of the Engineer in charge will be binding on the contractor. 2. The fountains will be run through departmental labour in each shift. 3. Water & electricity will be supplied free of cost by the deptt. 4. In case of a minor fault of any nature same shall be rectified by agency within 24 hour after getting the complaint thereafter recovery/penalty @ Rs. 500/- per fountain system per day will be made from the bill. 5.In case of a major fault no payment shall be deducted for Non-operation of the fountain for the first 03 days and thereafter recovery/penalty @ Rs. 1000/- per fountain per day will be made from the bill. Mini Lake bridge Side, Mini Lake Lotus Pond, Duck House, Athpulla side, Glass House (05 water body), Gate No 3
(O & M for 0 6 set of Fountains) Repairing overhauling and rewinding of 10 HP open well submersible pump set three phase 50 Hz AC supply complete as existing at site of work as per following details 1. rewinding of three phase open well submersible pump set with suitable size copper wiring as required and old unserviceable copper wire will be handed over to agency - 1 job 2. sundries and various materials like grease, dhoti, nut, bolt, oil etc for servicing of pump set - 1 Job 3. carriage from site to factory and return to site, dismantling, reinstallation of pump set after repair including testing, commissioning etc complete as per direction, instruction and entire satisfaction of engineer-in-charge.
Providing and fixing 63 Amp TPN MCB (miniature circuit breaker) of make Schneider/Halonix/L&T / Havells or equivalent including purchase & taken away of old unserviceable part to the agency all as per direction and entire satisfaction of Engineer in charge.
Providing and fixing 4 pole MCB upto 100 ampere (miniature circuit breaker) of make Schneider/Halonix/L&T / Havells or equivalent including purchase & taken away of old unserviceable part to the agency all as per direction and entire satisfaction of Engineer in charge.
Supply & fixing water proof high power LED lights 18 watts, color changing/RGB Pipe made out of San top with ABS base suitable protection glass of IP-68 (Color Design India/Huma/RGB or equivalent) with required small fittings,connection thimbles, male female connectors, protective tape and cable etc.complete as per the direction & entire satisfaction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_378685.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid