| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-Finance | ₹31.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹31.6 LAccepted-Finance 5 642 NETHAJI NAGAR 4TH STREET MELUR TUTICORIN 628 002 | TUTICORIN | TUTICORIN | TAMIL NADU | 628002 | ₹31.6 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | MK Anbuchezhiyan&co., L1 | NAGARAJ L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 2,949 | Sqm | 25 ₹73,725 | 27 ₹79,623 |
| 2.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 148 | Cum | 10,938 ₹16.2 L | 10,938 ₹16.2 L |
| 3.00 | Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 89 | Cum | 11,027 ₹9.8 L | 11,028 ₹9.8 L |
| 4.00 | GST. 18% (CGST-9%, SGST-9%) | 1 | Nos | 4,81,311.36 ₹4.8 L | 4,82,389.02 ₹4.8 L |
Tender Value
₹32 L
EMD Value
₹32,000
Closing Date
5 Aug 2025, 3:00 pmClosed
COMMISSIONER VILLUPURAM MUNICIPALITY
VILLUPURAM MUNICIPALITY
Providing Renewal of B.T. Road at Periyar street - 044006R1383 Ramoorthi street - 044028R629 Ramoorthi street - 044028R630 in Villupuram Municipality
2025_MAWS_587843_3
5477/2025/E1
Open Tender
Civil Works
90 days
Villupuram Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,000
31 May 2026
2 Aug 2025
5 Aug 2025
2 Aug 2025
5 Aug 2025
2 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf