| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAccepted-Finance | ₹7.6 Cr | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹8.4 CrRejected-Finance 124 A NSC BOSE ROAD KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹8.4 Cr | L2 | Rejected-Finance L2 Bidder |
| 3 | Rejected-Technical B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | - | - | Rejected-Technical Not meeting PQ Criteria. |
| 4 | Not Admitted-Fee/PreQual/Technical OFFICE NO 1301 TO 1310 ZION PLOT 273 SECTOR 10 KHARGHAR NAVI MUMBAI RAIGAD MAHARASHTRA 410210 INDIA UDYAM MH 27 0019887 | RAIGAD | MAHARASHTRA | 410210 | - | - | Not Admitted-Fee/PreQual/Technical Others-As per NIT Gerneral Details Sr. no. 5 and Schedule A Sr. No. 31. EMD / Bid Security not submitted by the bidder. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-As per NIT Gerneral Details Sr. no. 5 and Schedule A Sr. No. 31. EMD / Bid Security not submitted by the bidder. |
| Sl No | Description | Qty | Unit | C E TestingCompany Pvt Ltd L2 | Cengrs Geotechnica Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 1.00 | Rotary boring/ drilling of ‘SX’ size holes vertically to log and collect samples through all kinds of soils with adequate and suitable equipment for depths below existing ground level as per specifications, drawings and as directed by the Engineer.
Note : The quoted rate shall include the following:
1. Mobilization and Demobilization of adequate numbers of suitable boring and drilling rigs of hydraulic type, including necessary drilling rods, pumps, miscellaneous equipment, tools, spares, consumables etc. adequate for each set of plant, survey equipment, etc. Additional rigs and equipment shall be mobilized by contractor, if needed, for timely completion of the work at his own cost.
2. Deployment of technical, skilled, semi skilled & unskilled man power required for carrying out the complete work as per specifications & drawings.
3. Providing suitable temporary removable casing for ensuring stability of boreholes in soil/ weathered rock.
4. Measurement of ground water level as per specifications & drawings.
5. Maintenance of drilling records and submission of final geological logs in hardcopy as well as soft copy. | 1,250 | RM | 1,770 ₹22.1 L | 1,298 ₹16.2 L |
| 1.01 | Conducting Standard Penetration Test (SPT) in the bore holes in soil as per IS-2131 | 350 | each | 177 ₹61,950 | 118 ₹41,300 |
| 1.02 | Providing and installing permanent new PVC casing of HX size dia in the already drilled SX size holes including filling the annular space by Bentonite / other suitable material as directed by EIC along with necessary coupling, cutting, threading etc. complete, in the above specified drilled holes, wherever asked for by the Engineer. Note: These PVC cased holes will be used for carrying out cross hole tests to find shear wave velocities in the foundation strata. The casing is required only for soil portion of the hole. | 400 | RM | 590 ₹2.4 L | 295 ₹1.2 L |
| 2.00 | Obtaining Undisturbed tube / piston soil samples, 90 mm diameter & 450 mm long from all depths of the drilled boreholes, necessary sealing and transporting the same to testing laboratory as per specifications and as directed by the engineer. Collection of undisturbed samples may require deployment of special samplers depending on the soil type encountered. | 250 | Nos. | 295 ₹73,750 | 118 ₹29,500 |
| 3.00Same as item no.1 but with NX size holes in rock formations (excluding carrying out SPT) below existing ground level, including collection, numeration and logging of cores, supply of wooden core sample boxes, painting, labeling of boxes, putting core samples in the core boxes, labeling of cores samples, colour photographs (100mm x 150 mm) of boxes with cores samples placed inside the boxes and transporting and storing in core samples library at location indicated by engineer, measurement of ground water level etc. complete as per specifications & drawings.The core boxes shall be paid in separate item.The diameter of rock cores to be extracted will be 54.7 mm (Nx size). Wire line drilling will not be permitted. Rotary drilling for following depths: | |||||
| 3.01 | From GL up to a depth of 20 M below GL | 5,000 | RM | 2,950 ₹1.5 Cr | 2,950 ₹1.5 Cr |
| 3.02 | From >20 M below GL to 40 M below GL | 4,460 | RM | 3,304 ₹1.5 Cr | 2,950 ₹1.3 Cr |
| 3.03 | From >40 M below GL to 60 M below GL | 2,545 | RM | 3,658 ₹93.1 L | 3,350 ₹85.3 L |
| 3.04 | From >60 M below GL to 80 M below GL | 1,135 | RM | 4,425 ₹50.2 L | 3,540 ₹40.2 L |
| 3.05 | From >80 M below GL to 100 M below GL | 780 | RM | 5,015 ₹39.1 L | 4,130 ₹32.2 L |
Tender Value
₹6.6 Cr
EMD Value
₹13.2 L
Closing Date
1 Jul 2025, 10:00 amClosed
Chief Construction Engineer, CMPAPP
Chutka Madhya Pradesh Atomic Power Project, 5 th Floor Sanchar Vikas Bhawan, Residency Road, Near Head Post Office, Civil Line, Jabalpur (MP) - 482001
Carrying out detailed Geo-Technical, Geo-physical investigations and Hydrogeological studies at CMPAPP-1and2.
2025_NPCIL_234313_1
NPCIL/CMPAPP/2025/CIVIL/PT-80
Open Tender
Civil Works - Others
457 days
Village Chutka Teh Narayanganj, Dist. Mandla
As per tender document
5 documents required · 5 mandatory
₹0
₹13.2 L
Yes
JABALPUR, MADHYA PRADESH
15 May 2026
10 Jun 2025
2 Jul 2025
10 Jun 2025
1 Jul 2025
23 Jun 2025
10 Jun 2025 - 18 Jun 2025
20 Jun 2025
Amount
Conducting Standard Penetration Test (SPT) in the bore holes in soil as per IS-2131
Providing and installing permanent new PVC casing of HX size dia in the already drilled SX size holes including filling the annular space by Bentonite / other suitable material as directed by EIC along with necessary coupling, cutting, threading etc. complete, in the above specified drilled holes, wherever asked for by the Engineer. Note: These PVC cased holes will be used for carrying out cross hole tests to find shear wave velocities in the foundation strata. The casing is required only for soil portion of the hole.
Obtaining Undisturbed tube / piston soil samples, 90 mm diameter & 450 mm long from all depths of the drilled boreholes, necessary sealing and transporting the same to testing laboratory as per specifications and as directed by the engineer. Collection of undisturbed samples may require deployment of special samplers depending on the soil type encountered.
Same as item no.1 but with NX size holes in rock formations (excluding carrying out SPT) below existing ground level, including collection, numeration and logging of cores, supply of wooden core sample boxes, painting, labeling of boxes, putting core samples in the core boxes, labeling of cores samples, colour photographs (100mm x 150 mm) of boxes with cores samples placed inside the boxes and transporting and storing in core samples library at location indicated by engineer, measurement of ground water level etc. complete as per specifications & drawings.The core boxes shall be paid in separate item.The diameter of rock cores to be extracted will be 54.7 mm (Nx size). Wire line drilling will not be permitted. Rotary drilling for following depths:
From GL up to a depth of 20 M below GL
From >20 M below GL to 40 M below GL
From >40 M below GL to 60 M below GL
From >60 M below GL to 80 M below GL
From >80 M below GL to 100 M below GL
From >100 M below GL to 120 M below GL
Providing core boxes as per IS (i.e IS 4078 -1980 , reaffirmed in 2004 ). Each core box shall hold 6.0 m length of sample
Locating bore hole, shifting & Setting up of drilling equipment at each of the drill locations including following activities: 1. Conducting survey and locating the borehole as per the drawing or as directed by engineer in charge by using total station with all accessories. The location of the borehole to be identified based on the coordinates provided in the drawing by transferring the coordinates from the marked up points given in the drawing/ shown by Engineer along with grid / bench mark. The distance of survey traverse will not be more than 2 KM. Use of GPS instruments for locating bore holes will not be acceptable, however it may be used as a confirmatory system only. 2. Making temporary access roads as required to the boring/ drilling locations from existing approach roads to site. 3. Arranging water supply for the drilling and testing. 4. This item shall be operated only once for each bore hole. Any replacement or change of equipment needed due to any reasons, contractor shall carry out at his own cost. 5. Required Site clearance, earthwork etc. suiting for mounting of the equipment and creating working environment. 6. No extra payment shall be made for any criss-cross or back and forth movement of the rig after setting, required for proper positioning, including marking the drill hole location on ground by actual survey, as per the drawing or instructions of the Engineer in charge.
Plugging of bore holes as per specifications and as directed by Engineer-In-Charge using 1:2 cement-sand grout. Note: 1. The grouting of the hole shall be done using a tremie extending upto bottom of the hole and raising the same as the grouting proceeds. 2. The payment will be made in running metre for the depth of bore hole plugged.
Conducting Grain size analysis, particle size & percent fines distribution of soil and soil classification (IS 1498), (Sieve analysis & Hydrometer or Pipette analysis ) including Grain Size Distribution curve as per drawings, specifications, IS 2720 (part-4) and as directed by the Engineer.
Conducting index properties of soil such as Liquid limit, plastic limit and plasticity index etc as per drawings, specification, IS 2720 (Part 5), IS 9259 and direction of the Engineer. Three tests of each soil sample will be considered as one set.
Conducting Specific gravity as per specification, drawings, IS 2720 (Part 3) and as directed by the Engineer. Three tests of each soil sample will be considered as one set.
Conducting chemical analysis of undisturbed soil samples or disturbed SPT soil samples including total soluble solids, organic matter, Calcium carbonate, cation exchange capacity, silica sesquioxide ratio, sulphates (expressed as SO3), Chlorides and PH as per drawing, specification, IS 2720 ( Part 21,22,23,24, 25, 26, & 27) and as directed by the Engineer.
Conducting Consolidation test on undisturbed soil samples, giving full test results including e - log p curve, virgin curves, Cv, e, av, Cc, etc as per drawing and relevant IS code:2720 Part 15.
Conducting unconfined compressive strength test on undisturbed soil samples or remoulded soil samples as per IS:2720 Part-10.
Conducting triaxial compressive strength test on undisturbed soil samples or on remoulded soil samples as per drawings, specifications, relevant IS 2720 (Part-11 & 12) and as directed by the Engineer,
Consolidated undrained type including measurement of pore water pressure.
Consolidated drained type
Conducting CBR test on soil samples as per drawings, specifications, IS 2720 (Part 16) and as directed by the Engineer.
Conducting compaction test on soil samples obtained from Trail pits as per drawings, specifications and as directed by the Engineer.
Using light compaction as per IS:2720-Part-VII.
Using heavy compaction as per IS:2720 – Part-VIII.
Collecting ground water samples as applicable at specified depths from drill designated bore holes (minimum 2 litres) and conducting full chemical analysis of water sample and obtain the parameters as described below ,as per relevant IS code in an approved laboratory, complete as per drawing, specifications, including submission of test reports. Determination of turbidity. PH Value determination. Alkalinity determination. Chlorides content determination. Sulphates content determination. Nitrites content determination Nitrates content determination Flourides content determination Free & Saline ammonia content determination Determination of hardness.
Carrying out laboratory tests on rock samples in an approved laboratory, complete as per specifications and as directed by Engineer-In-Charge, including necessary transportation of samples to approved laboratories and submission of test report in hard and soft copies.
Natural moisture content
Dry Density and Specific Gravity
Uniaxial compression test on saturated rock core specimens to determine un-confined compressive strength, Young's Modulus E and Poisson's ratio
Tensile test by Point load method on saturated rock core specimens as per IS 8764
Conducting Triaxial compression strength with internal pressure upto 80 kg/cm2 as per relevant IS Code. Note: For measurement, one set means 3 samples with 3 different confining pressures.
With saturation
Determination of Water absorption and Porosity as per relevant IS Code.
Conducting chemical analysis as per relevant IS Codes for the qualification of excavated rock as a material for Coarse agreegate to be used in the Concrete.
Tetsing for deleterious materials as per IS : 383
Test for Alkali Aggregate Reaction as per IS: 2386 (Part-7)
By Chemical method
Mortar Bar method at 38 o C regime
Mortar Bar method at 60 o C regime
Chemical analysis for Total alkali content as Na2O equivalent, Total Sulphate content as SO3 , Acid soluble chloride content as per IS: 383
Soundness of Aggregate tested with Sodium Sulphate and Magesium Sulphate , as per IS: 2386 (Part 5)
Detailed Petrographic examination of core including grinding thin sections for study under electronic microscope, taking photo (micro-graphs) of sections and assessment of strained quartz etc complete for including in the report and submission of report
TRIAL PITS Excavation in soil for trial pit, including backfilling and dewatering as per specification and as directed by Engineer-In-Charge
Converting the already drilled hole to observation well, up to maximum of 30m depth below existing ground level as per drawing and as directed by Engineer including providing and installing 100mm. dia PVC perforated pipe with perforations of 6mm dia @ 150 mm C/C, wrapped with nylon wire mesh of 150 micron mesh size, providing cap on top of well etc including all material, labour, tools and plants complete. Note: The cost of drilling shall be paid under the relevant item.
GEO-PHYSICAL FIELD INVESTIGATION
Conducting Electrical Resistivity Imaging measurement in two radial directions as per specification.
Seismic Refraction test is to assess the subsurface and bed rock topography for the CMPAPP site as per technical specification.
1) Up to 110 m depth below the foundation level for Reactor and control Buildings.
2) Up to 60m depth below the foundation level for various safety related buildings.
Providing bore well with casing of 150 mm dia. SCH. 40 grade PVC slot perforated pipe with following specification. 1. Drilling a cluster of bore well consists nine numbers of bore wells with depth of at least 20 meter depth from existing GL at the specified four locations in the required configuration as given in Figure1. 2. The bore well may be drilled by using truck mounted fast rig. 3. The casing shall be of PVC, 150 NB (OD-168.28 mm), Sch.40 with about 7.1 mm wall thickness with slotted screen type with slot width shall be 5 mm +/- 0.5 mm, slot length shall be 50 mm (2 inch), minimum no. of vertical rows of slots shall be 5, pitch shall be 12.7 mm (0.5 inch) (Refer Figure 2). The slotted pipe shall introduce from one meter below ground level. The initial one meter length of the casing shall be without slotes. The casing pipe shall be wound with two layers of GI steel wire mesh of 20 mesh size and tied suitably before installation at the bore well. 4. Providing hinged cap with locking provision for all bore wells. 5. The rate shall include all material, labour, tools, plants, machines, fittings, adhesives etc. to complete the work as directed by EIC (Engineer-In-Charge) .
For laboratory investigation, 12 nos. of soil samples are to be collected from 4 donor bore wells of 4 sets (3 samples from each donor bore well ), at three depths i.e. 0.5m, 2m & 5m below ground level. Each sample weight will be around 1 Kg. in weight and same is to be handed over to concerned NPCIL site person.
Extra over item No. 24 for drilling a bore well more than 20 meter from GL for one meter or part there off of each bore well.
Preparation and submission of comprehensive draft ( 3 Copies ) and final ( 5 copies) reports of all the tests, survey,field investigations, laboratory tests etc. in the scope of this tender as detailed in various schedules, specifications, drawings inclusive of bore logs , survey of discontinuities, Compilation, interpretation, analysis of the data , liquifaction analysis for foundations on soil, slope stability analysis of soil strata as per IS: 7894 and recommending safe slopes during excavation, recommendations of the foundation design parameters found out from the tests as per AERB Guide no. AERB /NPP/SG/CSE-2. Final report shall be submitted after the draft copy is appoved by the Engineer. Also submission of draft ( 3 Copy ) interim reports of all the tests / field investigations carried out as detailed in specifications inclusive of bore logs , results of tests including their soft copies and 5 copies of the approved interim report as soon as a particular tests , investigation,surveys are completed. Report shall be submitted in soft copies as well as hard copies. The report shall be reviewed independently & proof checked by a third party Geo-Technical specialist from instititutions like IITs,IISC,NIRM,CSMRS etc. as per specifications, drawings and as directed by Engineer-In-Charge. The scope of finalising the Geotechnical evaluation report shall also include the following: 1) The sub soil investigation final design basis report shall be submitted separately. 2) Defence of the report for design basis report and particpation in On-line meetings ( 10 nos. of meetings, maximum) by the Proof consultant during the meetings with AERB. The time-period for the review of the report by AERB can be considered as one year after the approval of the report for design basis report by NPCIL. 3) Revision of the report for design basis report ( 3 times., maximum) based on the review comments by AERB.
Conducting meetings and ensuring required arrangements related to co-ordination and liasioning with villagers, local authorities, District Administrations, NGOs etc. during any type of obstacles, agitations including oppositions in the work for sorting out the same in suitable manner as per circumstantial requirement for creating smooth working environment to carry out work under the scope of the contract as directed by Engineer-In-Charge.
C E TestingCompany Pvt Ltd (BID ID -866442)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.10 MB
CMPAPP12_10120_2003_DD_R1.pdf
Tender Documents • 0.96 MB
TENDERDOCUMENTPT80.pdf
Tender Documents • 2.09 MB
CMPAPP12_10120_2002_DD_R1.pdf
Tender Documents • 1.66 MB
PC_M_00078_R2.pdf
Tender Documents • 1.17 MB
CMPAPP12_10120_2001_DD_R1.pdf
Tender Documents • 2.53 MB
CMPAPP12_10000_2001_GA_R1.pdf
Tender Documents • 2.88 MB
GCC.pdf
Tender Documents • 7.73 MB
Technocommercial_Bid_PT80.xls
Other Document • 0.16 MB
BOQ_265444.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid