Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC 71 3 VIDYASAGAR PATH MADRAL NAIHATI 743165 | NAIHATI | 24 PARAGANAS NORTH | WEST BENGAL | 743165 | L1 | Accepted-AOC Lowest rate | |
| 2 | L2₹2.5 L+₹1,272.84 (0.51%)Rejected-Finance B 5 117 KALYANI NADIA 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹2.5 L+₹3,182.11 (1.27%)Rejected-Finance | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | KUNDU ELECTRICAL ENTERPRISE L3 | KARTICK BAL L2 | M/S. G. P. ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Washing, cleaning of chlorine machine unit including chlorine tank, pipe & specials etc. by engaging skilled personnel once in a month with supply of fast moving spare parts such as gland packing, clamp, nut & bolt etc. as required to keep the unit in healthy condition w.e.f. 01/08/2024 to 31/01/2025 | ||||||
| 1.01For following w/s schemes : | ||||||
| 1.02Bagnan I & II Block - 57 nos. Pump House | ||||||
| 1.03Bagnan (Reju.) w/s scheme, P.H. No.-I & II | ||||||
| 1.04Bagnan BDO office w/s scheme, P.H. No.-I | ||||||
| 1.05Bagnan Imporvement w/s scheme, P.H. No.-I & II | ||||||
| 1.06Bagnan w/s scheme Zone-I, P.H. No.-I & II | ||||||
| 1.07Bagnan w/s scheme Zone-II, P.H. No.-II | ||||||
| 1.08Bagnan w/s scheme, Special Zone, P.H. No.-I & II | ||||||
| 1.09Bagnan N.M.U w/s scheme, P.H. No.-I | ||||||
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
5 Jul 2024, 6:00 pmClosed
Assistant Engineer HMSD PHED
P16IndiaExchangePlaceCITAnnexeBldgExtn2ndfloorKol73
Electro mechanical works
2024_PHED_697299_35
WBPHED / AE / HMSD / 01 / 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
180 days
Office of the Assistant Engineer HMSD PHED
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,200
26 Jun 2026
21 Jun 2024
8 Jul 2024
21 Jun 2024
5 Jul 2024
21 Jun 2024
Amount
Washing, cleaning of chlorine machine unit including chlorine tank, pipe & specials etc. by engaging skilled personnel once in a month with supply of fast moving spare parts such as gland packing, clamp, nut & bolt etc. as required to keep the unit in healthy condition w.e.f. 01/08/2024 to 31/01/2025
For following w/s schemes :
Bagnan I & II Block - 57 nos. Pump House
Bagnan (Reju.) w/s scheme, P.H. No.-I & II
Bagnan BDO office w/s scheme, P.H. No.-I
Bagnan Imporvement w/s scheme, P.H. No.-I & II
Bagnan w/s scheme Zone-I, P.H. No.-I & II
Bagnan w/s scheme Zone-II, P.H. No.-II
Bagnan w/s scheme, Special Zone, P.H. No.-I & II
Bagnan N.M.U w/s scheme, P.H. No.-I
Benapur w/s scheme, P.H. No.-I & II
Chhayani Guzrat w/s scheme, P.H. No.-I & II
Harop w/s scheme, P.H. No.-I & II
Mankur w/s scheme, P.H. No.-I, II, III, V
Kalyanpur-Birampur w/s scheme, P.H. No.-I & II
Chakkamala w/s scheme, P.H. No.- New
Chakkamala w/s scheme, Zone-II, P.H. No.- II
Mellock w/s scheme Zone-I, P.H. No-I & II
Mellock w/s scheme Zone-II, P.H. No- II
Orphuli w/s scheme, P.H. No-I & II
Paschim Bainan w/s scheme, P.H. No-I, II, III, IV & V
Mugkalyan w/s scheme, P.H. No.- I & II
Barunda w/s scheme, P.H. No.- I, II & III
Deulti w/s scheme, P.H. No.- I & II
Birkul w/s scheme, P.H. No.- I & II
Deulgram (Part) w/s Scheme, P.H. No.- I
Chakur w/s scheme, P.H. No.- I & II
Hallyan w/s scheme, P.H. No.- I, II & III
Haturie-Kandarpur w/s scheme, P.H. No.- I, II & III
Murgaberia w/s scheme, P.H. No.- I & II
Mellok Brahmandakuria w/s scheme, P.H. No.- I & II
Udaynarayanpur Block - 32 nos. Pump House
Kanupat w/s scheme, P.H. No.- I & II
Chitrasenpur w/s scheme, P.H. No.- I & II
Khalatpur w/s scheme, P.H. No.- I & II
Pancharul w/s scheme, P.H. No.- I & II
Rampur w/s scheme, P.H. No.- I & II
Udaynarayanpur W/S Scheme, P.H. No.- I & II
Garbhabanipur W/S Scheme, P.H. No.- I & II
Joka w/s scheme, P.H. No.- I & II
Khila w/s scheme, P.H. No.- II & III
Gourangachak w/s scheme, P.H. No.- I & II
Sonatala w/s scheme, P.H. No.- I & II
Bedhi Chandrapur w/s scheme, P.H. No.- I & II
Per Radhanagar w/s scheme, P.H. No.- I & II
Kumirmora w/s scheme, P.H. No.- I & II
Sibpur w/s scheme, P.H. No.- I & II
Khorda Etarai w/s scheme, P.H. No.- I & II
(Total 89 nos. x 1 time/month x 6 months) = 534 times
Add: 18% GST
Add: 1% CESS
KARTICK BAL
KUNDU ELECTRICAL ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .