| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹19.0 L+₹23,301.76 (1.24%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Withdraw the Tender | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Withdraw the Tender |
| Sl No | Description | Qty | Unit | CHINNAMMAN CONSTRUCTIONS L2 | K REKHA L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 32.28 | Cum | 270 ₹8,715.6 | 263.5 ₹8,505.78 Lowest |
| 2.00 | Cement concrete 1 : 4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 10cm thick., compacting etc., complete complying with standard specifications and as directed. | 103.57 | Cum | 5,500 ₹5,69,635 | 5,454 ₹5,64,870.78 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits including all other charges etc. complete. | 322.8 | Sqm | 185 ₹59,718 | 182 ₹58,749.6 Lowest |
| 4.00 | Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 105.92 | Cum | 6,700 ₹7,09,664 | 6,635 ₹7,02,779.2 Lowest |
| 5.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 87.43 | Cum | 2,500 ₹2,18,575 | 2,436 ₹2,12,979.48 Lowest |
| 6.00 | Providing Bitumen pad including all cost and conveyance of materials and labour charges etc complete | 13.11 | Sqm | 180 ₹2,359.8 | 179 ₹2,346.69 Lowest |
| 7.00 | Providing Power Trowler including all cost and conveyance of materials and labour charges etc complete | 874.25 | Sqm | 47 ₹41,089.75 | 45.5 ₹39,778.38 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,89,756.29 ₹2,89,756.29 | 2,86,201.78 ₹2,86,201.78 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development officer(VP),Tkm Block
Block Development office Thirukkazhukundram Block
Providing CC Road in Vasanthapuri 3rd and 4th Cross Street Link Road at Vadakadambadi Panchayat in Thirukkazhukundram Block under (Unauthorised Layout regularisation developmental charges) Fund for the year 2025-26
2026_RDTN_650330_1
Rc.No.3988/2025/A3 Ad (Pt) Dated. 04.01.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Vasanthapuri 3rd and 4th Cross Street Link Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
Yes
19 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Cement concrete 1 : 4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 10cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering for sides and soffits including all other charges etc. complete.
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing Bitumen pad including all cost and conveyance of materials and labour charges etc complete
Providing Power Trowler including all cost and conveyance of materials and labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_779732.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_779732.xls
BOQ • 0.31 MB
Technical.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .