Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC 38 3 B T ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹1.8 Cr | L1 | Accepted-AOC L1 RATE QUOTED |
| 2 | L2₹2.1 Cr+₹29.2 L (16.3%)Rejected-AOC | ₹2.1 Cr+₹29.2 L (16.3%) | L2 | Rejected-AOC L2 RATE QUOTED |
| 3 | L3₹2.8 Cr+₹97.0 L (54.2%)Rejected-AOC | ₹2.8 Cr+₹97.0 L (54.2%) | L3 | Rejected-AOC L3 RATE QUOTED |
| 4 | L4₹2.8 Cr+₹1.0 Cr (58.2%)Rejected-AOC | ₹2.8 Cr+₹1.0 Cr (58.2%) | L4 | Rejected-AOC L4 RATE QUOTED |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
18 Nov 2020, 2:30 pmClosed
CEO USDSM
UJJAIN SAHAKARI DUGDH SANGH MARYADIT MAXI ROAD UJJAIN MP
SUPPLY INSTALLATION AND COMMISSIONING OF 4 TPH GAS PLUS FURNACE OIL DUEL FUEL BOILER AT DAIRY PLANT UJJAIN ON TURN KEY BASIS 3RD CALL
2020_MPCDF_113830_1
UDS/ENGG/PO33/2020/10-11-2020
Open Tender
Miscellaneous Works
Item Rate
30 days
UJJAIN
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹5 L
Yes
UJJAIN
2 Jan 2021
10 Nov 2020
19 Nov 2020
10 Nov 2020
18 Nov 2020
10 Nov 2020
13 Nov 2020
SUPPLY, INSTALLATION AND COMMISSIONING OF 4 TPH GAS+FURNACE OIL (DUEL FUEL)BOILER AT DAIRY PLANT UJJAIN ON TURN KEY BASIS
4 TPH(F&A 100 Deg C) Boiler with Heat Recovery unit suitable on Gas +FO(Duel Fuel) Boiler unit complete with Feed Pumps,Instrumentation, PLC Panel Gas Train suitable for above Boiler
Pressure Reducing Station for 4TPH (17-3.5 Kg/Cm2) complete with main line Bello Seal valves,By Pass Bellow Seal Valve,Control Valve,PID Controller,Steam Seperator and Safety Valve Condensate Recovery System consisting of 3500 Kg/Hr Automatic Condensate Transfer Pump with no moving parts,its receiver,Totalizer with Panel,conductivity based level sensor,suitable Flash Vessel and suitable Deaerator Tank
Main Steam Pipe,IBR, 80 NB(Max 120 Meterss) Per Meter Rate for excess quantity
5KL Output RO plant with Softener with storage tanks
Chimney(30.5 Mtr Height)suitable for Boiler
FO Strage tank 10KL with Heating at Pump Inlet, Electricaly Traced and Insulated Transfer Piping to Day Tank and Transfer Pump
FO Day Tank ,Insulated,with Heating Element,Level Indicator ,capacity 1KL
Feed Water Day Tank 10KL with Level Indicator
Insulation of Boiler,Piping,Ducting , whereever needed within the scope of supply as per specification
Commissioning of Boiler
Boiler House (PEB Shed) as required
Lighting as per Norms
Foundations for Boiler,Tanks,Supports as required
Suitable Ladder and Platforms within Boiler House
Annual Maintenance Supervision Charges per year (6 visits and IBR inspection vistit) for three years from commissioning
Initial IBR Approval of Boiler and IBR Piping
Crupp Boilers India Pvt Ltd
UNIMOD SYSTEMS
SHANTI BOILERS AND PRESSURE VESSSELS PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .